| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹1.8 LAccepted-AOC PASUMALAITHANGAL GINGEE VILUPPURAM | l1 | Accepted-AOC ACCEPTED | |
| 2 | l2₹1.8 L+₹377.75 (0.21%)Rejected-Finance | l2 | Rejected-Finance REJECTED |
| Sl No | Description | Qty | Unit | RAM KRITHICK BUILDERS L2 | R.Selvaraj L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils such as red earth, hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel, hard rock not requiring blasting ete complete., | 2 | M3 | 198 ₹396 | 197.5 ₹395 Lowest |
| 2.00 | Plain Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 4 | M3 | 5,627 ₹22,508 | 5,626 ₹22,504 Lowest |
| 3.00 | Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (M- Sand)) using II class ground moulded bricks of size 9" X 43/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification | 0.5 | M3 | 7,410 ₹3,705 | 7,409.5 ₹3,704.75 Lowest |
| 4.00 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 5 | M2 | 287 ₹1,435 | 286 ₹1,430 Lowest |
| 5.00 | Plastering with cement mortar 1:4 (One Part of Cement and Four part of Plastering Sand (P- Sand)) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309) | 10 | M2 | 585 ₹5,850 | 584 ₹5,840 Lowest |
| 6.00 | Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification. | 120 | kg | 108 ₹12,960 | 107.5 ₹12,900 Lowest |
| 7.00 | Flooring with Cuddapah slabs of 40mm thick over a base mortar in CM 1:3 (One Cement and Three Plastering Sand (P - Sand)) 20 mm thick and pointed with cement mortar 1:3 ( one cement and three Plastering sand) usimg Black oxide complying with standard specification (P & D data 53) | 3 | M2 | 1,410 ₹4,230 | 1,409 ₹4,227 Lowest |
| 8.00 | Paving the floor with Double charged Vitrified tiles of approved quality and colour of size 600x600x8mm thick of approved make, quality and colour in all floors over a base layer of cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 20mm thick and laid straight alignment and pointed neatly with colour cement at the rate of 0.40kg/m2 laid without any air gap in the tiles neatly and fixing in position as per standard specifications and as directed by the departmental officer. The colour & quality of tiles should be got approved by Municipal Engineer before use on work | 38 | M2 | 1,523 ₹57,874 | 1,522 ₹57,836 Lowest |
| 9.00 | Paving the floor with design Antiskid ceramic tiles (colour and shade as directed) of size 305 mm x 305mm x 6 mm in all floors over a base layer of cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 20mm thick laid in-situ and pointed with same coloured cement | 6 | M2 | 1,090 ₹6,540 | 1,089 ₹6,534 Lowest |
| 10.00 | Painting two coats for wall surface with approved Plastic Emulsion paint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of Paris, putty, wherever required etc, complete as per standard specification. | 241 | M2 | 264 ₹63,624 | 263 ₹63,383 Lowest |
Tender Value
₹2.3 L
EMD Value
₹4,600
Closing Date
30 Dec 2025, 3:00 pmClosed
Eo Ariyappampalayam Town Panchayat
Ariyappampalayam Town Panchayat
Maintenance of Anganwadi center at Ward no 11 Kondamuthanur Puthukothukadu Mulakinaru Privu in Ariyappampalayam Town Panchayat
2025_DTP_635441_1
301/2025/A1
Open Tender
Civil Works - Buildings
Works
90 days
Ariyappampalayam Town Panchayat
as per tender notice
2 documents required · 2 mandatory
₹0
₹4,600
Yes
31 Dec 2025
23 Dec 2025
30 Dec 2025
23 Dec 2025
30 Dec 2025
23 Dec 2025
23 Dec 2025 - 30 Dec 2025
Amount
Earth work excavation for foundation in all soils such as red earth, hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel, hard rock not requiring blasting ete complete.,
Plain Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (M- Sand)) using II class ground moulded bricks of size 9" X 43/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification
Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications
Plastering with cement mortar 1:4 (One Part of Cement and Four part of Plastering Sand (P- Sand)) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309)
Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification.
Flooring with Cuddapah slabs of 40mm thick over a base mortar in CM 1:3 (One Cement and Three Plastering Sand (P - Sand)) 20 mm thick and pointed with cement mortar 1:3 ( one cement and three Plastering sand) usimg Black oxide complying with standard specification (P & D data 53)
Paving the floor with Double charged Vitrified tiles of approved quality and colour of size 600x600x8mm thick of approved make, quality and colour in all floors over a base layer of cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 20mm thick and laid straight alignment and pointed neatly with colour cement at the rate of 0.40kg/m2 laid without any air gap in the tiles neatly and fixing in position as per standard specifications and as directed by the departmental officer. The colour & quality of tiles should be got approved by Municipal Engineer before use on work
Paving the floor with design Antiskid ceramic tiles (colour and shade as directed) of size 305 mm x 305mm x 6 mm in all floors over a base layer of cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 20mm thick laid in-situ and pointed with same coloured cement
Painting two coats for wall surface with approved Plastic Emulsion paint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of Paris, putty, wherever required etc, complete as per standard specification.
Painting two coats with Ready Mixed Enamel Paint over the new iron works of approved quality and colour without priming coat including the cost all materials etc.,complete, in all floors.
RAM KRITHICK BUILDERS (BID ID -1544842)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
BOQ_760480.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .