| 1 | L1₹8.6 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹8.7 L+₹8,948.72 (1.04%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹9.1 L+₹46,597.38 (5.42%)Rejected-AOC | L3 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | AKC SUPPLIER | J.MANIKANDAN | J.DEIVAKANI |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 9 | M3 | 1,710 ₹2,017.8 | 1,620 ₹1,911.6 Lowest | 1,800 ₹2,124 |
| 2.00 | Supplying and filling the basement with Crusher stone Dust in layers of not more than 15cm thick well rammed watered and compacted - etc., complete complying with standard specification. | 0.75 | M3 | 206.25 ₹243.38 Lowest | 225 ₹265.5 | 225 ₹265.5 |
| 3.00 | Plain Cement Concrete 1:4:8 using 40mm ISS HBG metal including all the cost and conveyance of materials from an approved quarry including all thye labour charges for laying compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 0.75 | M3 | 3,712.5 ₹4,380.75 Lowest | 4,087.5 ₹4,823.25 | 4,125 ₹4,867.5 |
| 4.00Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation | ||||||
| 4.01 | Plinth beam | 6.8 | M2 | 5,916 ₹6,980.88 | 6,800 ₹8,024 | 3,400 ₹4,012 Lowest |
| 4.02 | Square column | 9.71 | M2 | 11,360.7 ₹13,405.63 | 12,914.3 ₹15,238.87 | 6,311.5 ₹7,447.57 Lowest |
| 5.00 | Reinforced Cement Concrete 1:1:2:3 (One Cement, One and a half sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 9.1 | M3 | 78,396.5 ₹92,507.87 | 68,250 ₹80,535 Lowest | 77,805 ₹91,809.9 |
| 6.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 770 | Kg | 69,300 ₹81,774 Lowest | 69,300 ₹81,774 Lowest | 71,610 ₹84,499.8 |
| 7.00 | Supplying and fixing Solid Blocks of 40x20x20cm size conforming to S.S 2145-1965 (including jam blocks closers etc.,) made of CC1:3:6 in CM 1:5 (one of cement and five of sand) and partition wall including curing neat finishing etc., complete complying with standard specification and as directed by the departmental officers., (Approved by SE (CW) in ir No.15056/95BD/S1/dated 23.08.1995) | 3.59 | M3 | 17,770.5 ₹20,969.19 Lowest | 24,053 ₹28,382.54 | 26,925 ₹31,771.5 |
| 8.00 | Plastering with CM 1:5 mix using 12mm thick including cost and conveyance of materials from an approved quarry and including all labour charges etc., complete as per Standard Specification | 40.4 | M2 | 10,504 ₹12,394.72 | 10,100 ₹11,918 Lowest | 11,675.6 ₹13,777.21 |
Tender Value
₹9 L
EMD Value
₹9,000
Closing Date
29 Sept 2025, 3:00 pmClosed
The Commissioner, Tambaram City Municipal Corporat
No1 kalaivani street,Rajakilpakkam, chennai-73
Construction of Compound wall to Vembuliamman Koil Hospital Building
2025_DMA_609465_12
171/2025/E1
Open Tender
Civil Works
Works
90 days
Tambaram City Municipal Corporation
Construction of Compound wall to Vembuliamman Koil Hospital Building
2 documents required · 2 mandatory
₹0
₹9,000
14 Dec 2025
27 Sept 2025
29 Sept 2025
27 Sept 2025
29 Sept 2025
27 Sept 2025
Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Supplying and filling the basement with Crusher stone Dust in layers of not more than 15cm thick well rammed watered and compacted - etc., complete complying with standard specification.
Plain Cement Concrete 1:4:8 using 40mm ISS HBG metal including all the cost and conveyance of materials from an approved quarry including all thye labour charges for laying compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation
Plinth beam
Square column
Reinforced Cement Concrete 1:1:2:3 (One Cement, One and a half sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Supplying and fixing Solid Blocks of 40x20x20cm size conforming to S.S 2145-1965 (including jam blocks closers etc.,) made of CC1:3:6 in CM 1:5 (one of cement and five of sand) and partition wall including curing neat finishing etc., complete complying with standard specification and as directed by the departmental officers., (Approved by SE (CW) in ir No.15056/95BD/S1/dated 23.08.1995)
Plastering with CM 1:5 mix using 12mm thick including cost and conveyance of materials from an approved quarry and including all labour charges etc., complete as per Standard Specification
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Supplying and painting the walls with two coats of cement paint as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The colour and shade of the cement paint shall be got approved by the Executive Engineer before use of work).
Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification.
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Supplying and filling the basement with Good Earth filling in layers of not more than 15cm thick well rammed watered and compacted - etc., complete complying with standard specification.
Supplying and laying Rubberised interlocking Paver block M40 grade Providing and laying of 83mm thick high strength type conforming IS 15658-2006 of rubberized interlocking paver lock in size of minimum compressive strength of 40N/mm2 in uniform shape of approved make to be laid in flurring bone pattern with sand cushion below the uniform shap of approved non skitting surface in the top and the rate including levelling the base preparation of pavers as sub base, sand cushion 150mm thick laying out of pavement cut the pieces to fix the edge vibring the pavers,sweeping tranporting loading unloading of laying paver block as per standard specification,.
Plain Cement Concrete 1:1.5:3 (one cement, one and half fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Supplying, Fabricating, Erecting structural steel work for roofing welding or bolted type using MS Channels, angles, plates and round bars etc conforming to IS specification including primer coating and enamel painting as per Design given by the departmen
Fabricating supplying and fixing of pre painted galvanized iron sheets with the following specification. The materials should be of PPGI tile profile with a red colour or any other approved design 0.47 mm thick 24 guage having width 1050 mm. The sheet should be G.I.base pre painted hot dipped galvanized iron sheet and to be fixed with shelf tapping screws,plastic washer.The washer and screws to be fixed by using minute power machine drilled with out damaging the sheets paint coating to be regular modified polyster coat with zinc coating of Z 120 GSM paint thickness the finish should be terra cotta finish like malabar mangalore tiles finish optional matt finish. The sheet to be fixed with making suitable corrugated,cutting the sheet in to the required ssize and making ornamental designs as per the site condition and as directed by the departmental officers.
supply and fixing of 24W LED 2x2 Round type Recessed fitting with LED (Higher end) on false Ceiling with suitable hanging support from ceiling with PVC unsheathed copper leads from terminals to the fitting.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_728280.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .