| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.3 LAccepted-AOC | L1 | Accepted-AOC L1 BIDDER | |
| 2 | L2₹13.3 L+₹97,185.45 (7.87%)Rejected-Finance | L2 | Rejected-Finance L2 BIDDER | |
| 3 | L3₹14.7 L+₹2.4 L (19.4%)Rejected-Finance | L3 | Rejected-Finance L3 BIDDER | |
| 4 | L4₹15.1 L+₹2.7 L (22.3%)Rejected-Finance | L4 | Rejected-Finance L4 BIDDER | |
| 5 | L4₹15.1 L+₹2.7 L (22.3%)Rejected-Finance | L4 | Rejected-Finance L4 BIDDER |
Tender Value
₹17.8 L
EMD Value
₹35,500
Closing Date
17 Feb 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE ICD III LALITPUR
OFFICE EE ICD III LALITPUR
CONSTRUCTION OF VRB CUM FALL AT KM. 1.500 OF THANA DY.
2021_UPIDC_548713_2
2020-21/EE/02
Open Tender
Civil Works
Item Rate
30 days
LALITPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹35,500
5 Apr 2021
25 Jan 2021
17 Feb 2021
25 Jan 2021
17 Feb 2021
25 Jan 2021
Amount
Bed Scrapping.
Excavation of Foundation in M.K.R. and Kankar mixed soils including lift up to 1.50 meter and lead upto 30 meter including filling, watering ,ramming of excavated earth into the trenches or upto the space of the foundation trenches or into the plinth and removal and disposal of surplus earth with all cost of labour, T&P etc required for completion of work with all taxes but excluding GST.
Laying cement concrete 1:3:6 (M-10) in foundation by mechanical mixing, mechanical vibrating, curing with all cost of material, labour, T&P etc. Required for proper completion of work.with all taxes but excluding GST.
Laying cement concrete 1:2:4 (M-15) by mechanical mixing, mechanical vibrating, curing with all cost of material, labour, T&P etc. Required for proper completion of work. with all taxes but excluding GST.
Laying R.C.C. 1:1.5:3 (M-20) cement concrete by mechanical mixing, mechanical vibrating, curing with all cost of labour, material T&P etc.Required for proper completion of work. but excluding cost of steel & Shuttering.with all taxes but excluding GST
Laying cement concrete 1:1.5:3 (M-20) by mechanical mixing, mechanical vibrating, curing with all cost of material, labour, T&P etc. Required for proper completion of work. with all taxes but excluding GST.
Centering and shuttering including scaffolding required, including all cost of material, fabrication, erection, labour etc required for proper completion of work with all taxes but excluding GST.
Steel for reinforcement, it's cutting, bending, binding & placing in position as per approved drawing including all cost of material, labour and T&P etc, required for proper completion of work. with all taxes but excluding GST
Earth work in M.K.R. & Kankar mixed soil in filling with an avg. lead of 595m. & all lift including manual compaction, Dressing, making profile with all cost of labour, T&P etc. complete.with all taxes but excluding GST.
JAHAR SINGH S/O CHUNNI LAL
JINESH KUMAR
M/S AMITESH ASSOCIATES
M/S AMITABH KUMAR RICHHARIYA
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .