Loading…
Loading…
Tender Value
₹90 L
EMD Value
₹6.5 L
Closing Date
30 Sept 2026, 12:00 pm7d left
SE GONDA CIRCLE PWD GONDA
SE GONDA CIRCLE PWD GONDA
Construction of gram panchayat Vainiya to jaddpurwa to pasiyanpurwa link road
2026_CEDPW_1186444_6
4009/98Com/Gonda Circle/26-27 Dt 25.08.2026
Open Tender
Civil Works
Percentage
150 days
GONDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,600
Yes
₹6.5 L
Yes
Gonda
16 Sept 2026
16 Sept 2026
30 Sept 2026
16 Sept 2026
30 Sept 2026
16 Sept 2026
17 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Embankment with Material Obtained from Borrow Pits / Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical
Specification Clause 301.5 | 5,497 | Cum | 100 | ₹5,49,700 |
| 2 | Granular Sub-base with Well Graded Material (Table 400.1) / (A) By Mix in Place Method / Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at
OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. / (i) For Grading I Material | 390 | Cum | 3,600 | ₹14,04,000 |
| 3 | Water Bound Macadam Sub-base/base / (3) WBM Grading 3/ Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand
packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. / (B) By Mechanical Means | 281.25 | Cum | 4,749 | ₹13,35,656.25 |
| 4 | Cement Concrete Pavement - Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a
prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse
aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with
shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints,
applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-
days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. | 562.5 | Cum | 9,423 | ₹53,00,437.5 |
| 5 | E/W in excavation in foundation in ordinary soil including lift 1.50 mtr and lead up to 30 mtr and including filling watering ramming of excavated earth into the trenches or into the space of between the building and side the foundation trench or into the plinth and removal and disposal of surplus earth as per direction by E/I as per S.I. No. 251 | - | Cum | 125 | - |
| 6 | Providing and laying Cement concrete 1:4:8( 1 cement : 4 fine sand : 8 graded brick aggregate 40 mm. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. As per SI No. 275 | - | Cum | 4,300 | - |
| 7 | Supply and laying and 15mm gauge Brick Ballast compacting with fine sand as 1st class beding cradle below the pipe in 15 cm thickness and up to 10 % hight of pipe on either side. | - | Cum | 1,200 | - |
| 8 | Clas-150 brick work with 1:4 cement and coarse sand in foundation and plinth including supply of all materials labour and T&P etc. Requuired for proper completion of work as per S.I No. 305(b) | - | Cum | 5,600 | - |
| 9 | Struck pointing in 1:2 cement and fine sand mortar on brick work including supply of all materials, labour and TandP etc Requuired for proper completion of work as per S.I No. 574. | - | Sqm | 150 | - |
| 10 | Supply & laying of 600mm dia NP3 hume pipe including fixing of collar with 1:2 cement mortar. | - | RM | 4,416 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.00 MB
BOQ_2233106.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .