Tender Value
Refer Docs
EMD Value
₹35,470
Closing Date
11 Aug 2023, 3:00 pmClosed
Block Development officer,(V.Pt) Kottur
Block Development office, Kottur
1. Desilting of Singamangalam Iyyannar Kovil Kulam,Construction of Bathing Ghate, inlet Retaining wall 2. Construction of CC road Vengathangudi Keela Theru in Ve
2023_RDTN_354668_1
RC.No.3129/2023/A date1 03.08.2023/AGAMT-II- P3
Open Tender
Civil Works - Others
Item Rate
180 days
Kottur Block
As per Tender Document
3 documents required · 3 mandatory
₹0
₹35,470
Yes
16 Aug 2023
4 Aug 2023
11 Aug 2023
4 Aug 2023
11 Aug 2023
4 Aug 2023
Amount
1. Desilting of Singamangalam Iyyannar Kovil Kulam,Construction of Bathing Ghate, inlet & Retaining wall
Clearing light jungles including cost and conveyance of all materials and all labour charges etc., complete
Earth work excavation in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinaries and tippers including benching , breaking clods, sectioning etc.
Construction of Bathing Ghate :
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Construction of Inlet & Outlet :
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 :4 : 8mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and erection of centering for retaining wall and bathing ghat including cost and conveyance of all material and all labour charges etc, complete
Providing and laying reinforced cement concrete pipe NP2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry
Refilling Earth filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Provision for Name Borad
2. Construction of CC road @ Vengathangudi Keela Theru in Vengathangudi Panchayat.
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS20B for fondation
Filling with good river sand including cost, conveyance for all materials & labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete
CC 1:3:6 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
CC 1:2:4 mix using 20 mm ISS HBG metal including cost of all materials & labour charges etc complete
Provision for tarped
Provision for Name Borad
3. Black Topping to Singamangalam Samathava sudukkadu road in Vengathangudi Panchayat
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
Applying TACK COAT over WBM surface at 4Kg / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Provision for Name Board
4. Construction of Threshing Floor @ Vethapuram Kukkirammam TNCSC Near in Vengathangudi Panchayat
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS20B for fondation
Filling with good river sand including cost, conveyance for all materials & labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete
CC 1:3:6 mix using 40 mm ISS HBG metal including cost of all materials & labour charges etc complete
CC 1:2:4 mix using 20 mm ISS HBG metal including cost of all materials & labour charges etc complete
Provision for tarped
Provision for Name Borad
5. Construction of Threshing Floor @ Vethapuram Kukkirammam TNCSC Near in Vengathangudi Panchayat
Earth work excavation in Hard stiff clay soil except hard rock requiring bleasting such as soft clay mixed sand as per SS 20B
Earth work excavation in Hard stiff clay soil except hard rock requiring bleasting such as soft clay mixed sand as per SS 20B
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
Cement Concrete 1:4:8 using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
B.W. in C.M. 1:5 mix using good country bricks including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
Cement Concrete 1:3:6using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
CC 1:2:4 mix using 20mm ISS HBG Metal including cost and conveyanceof all materials and all labour charges etc.,complete for Tie beam
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete
Providing for Granolithic floor finishing with CC 1:2:4 mix using 20mm with including of all charges etc.., complete
Provision for Tar Pad
provision for name board
GST Amount for providing Service to Government Contract Works for the above works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
K.Nithiyanantham
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .