| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.3 LAccepted-AOC 99 SUSHILA BIHAR BHUD BULANDSHAHAR | L1 | Accepted-AOC L1 | |
| 2 | L2₹23.4 L+₹11,877 (0.51%)Rejected-AOC 01 REWARI REWARI HARYANA 123401 | REWARI | HARYANA | 123401 | L2 | Rejected-AOC L2 | |
| 3 | L3₹24.5 L+₹1.2 L (5.28%)Rejected-AOC 0 STATION ROAD PARICHHA PARICHHA NEAR BANK OF INDIA JHANSI UTTAR PRADESH 284305 | JHANSI | UTTAR PRADESH | 284305 | L3 | Rejected-AOC L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical 14 453 INDIRA NAGAR LUCKNOW UTTAR PRADESH | BIJNOR | UTTAR PRADESH | 246701 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹50,200
Closing Date
5 Mar 2021, 12:00 pmClosed
Executive Engineer
Lucknow Division Sharda Canal Lucknow
Construction of Boundry wall on departmental Land near Km. 15.000 on left bank of Shivgarh Dy.
2021_UPIDC_560287_1
05/EE/2020-21 (Lot-16)
Open Tender
Civil Works
Item Rate
45 days
Shivgarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹251
₹50,200
30 Mar 2021
27 Feb 2021
5 Mar 2021
27 Feb 2021
5 Mar 2021
27 Feb 2021
27 Feb 2021 - 5 Mar 2021
Amount
Earth work in excavation of foundation in all type of soil with lead up to 30 M lift up to 1.50 M with back filling i/c cost of all meterial Labour T & P etc. required.
Providing & Fixing shuttering for R.C.C work including rent of shuttering material, cost of nails and also i/c all labour and T&P required for proper completion of the work as per direction of E/I. i) Column & Footing
Providing & Fixing shuttering for R.C.C work including rent of shuttering material, cost of nails and also i/c all labour and T&P required for proper completion of the work as per direction of E/I. ii) Beam
P/L Cement Concrete 1:3:6 in Foundation with (1 Cement, 3 Coarse sand & 6 Stone aggregate 20mm to 40mm size) including cost of all meterial Labour, T & P etc. required for proper completion of the work as per direction of Engineer-in-charge.
Providing, streghtening, cutting, bending, binding and placing of Tor streel reinforcement, including supply of all required labour and T&P required for proper completion of work as per direction of Engineer-in-charge. i) 16 mm dia Steel Bar
Providing, streghtening, cutting, bending, binding and placing of Tor streel reinforcement, including supply of all required labour and T&P required for proper completion of work as per direction of Engineer-in-charge. ii) 12 mm dia Steel Bar
Providing, streghtening, cutting, bending, binding and placing of Tor streel reinforcement, including supply of all required labour and T&P required for proper completion of work as per direction of Engineer-in-charge. iii) 10 mm dia Steel Bar
Providing, streghtening, cutting, bending, binding and placing of Tor streel reinforcement, including supply of all required labour and T&P required for proper completion of work as per direction of Engineer-in-charge. iiv) 8 mm dia Steel Bar
P/L R.C.C. with cement coarse sand and 20 mm gauage approved stone aggregate in the proportion of 1:1.5:3 (M-20) in footings of foundations vertical member and slab etc. excluding supply of reinforcement and its fixing and binding the same but including supply of all materials, labour and tools and plants etc. required for proper completion of the works. As per direction of E/I. Cost of binding wire shall also be included in this Item.
First Class Brick work in 1:3 cement and coarse sand and of 2.25 F.M. mortar in foundation and plinth including supply of all materials, labour, tools and plants etc. required for proper completion of the work. As per direction of Engineer-in-charge.
First Class Brick work in 1:4 cement and coarse sand and of 2.25 F.M. mortar in foundation and plinth including supply of all materials, labour, tools and plants etc. required for proper completion of the work. (1:4 cement & Coarse sand)
Cement plaster with cement mortar in 1:4 (1 Cement : 4 Coarse Sand) with cost of all labour, material and T&P etc. to complete the work as direction of Engineer-in-charge.
Fabrication of mild steel/iron work in grill, gates railing, door and window frames including cutting, drilling, we,ding/riveting and hinges, where necessary and fixing in position including cost of all material, labour T&P etc. required for proper conpletion of work with one coat of red oxide primer.
White washing three coat including supply of all materials, labour and T&P etc required for peoper completion of the work.
Painting or vanishing on iron works in small areas or new wood work with one coat of ready mixed priming paint & one coat of apprived superior quality ready mixed paint of clear synthetic varnish including supply of all materials, labour and T&P etc. required for proper completion of work. paint to be used should confirm to the I.S.I. No. 103 1950
M/S ASHISH KUMAR
M/S Singh Construction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .