| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹32.2 L
EMD Value
₹3.2 L
Closing Date
16 Dec 2021, 5:00 pmClosed
Executive Engineer Minor Irrigation Division Prj
Office of the Executive Engineer Minor Irrigation Division 321/1 Shivkuti Teliyarganj Prayagraj
Construction of check dam Sisai Sipah Checkdam Vill- Sisai Sipah Block - Bahariya District - Prayagraj
2021_UPMID_652837_1
940/M.I./Ac/N.Suchna/21-22 Dt 30.11.21
Open Tender
Civil Works
Item Rate
60 days
Construction of check dam Sisai Sipah Checkdam
Please refer Tender documents.
2 documents required · 2 mandatory
₹900
Executive Engineer Minor Irrigation Division
₹3.2 L
Yes
23 Dec 2021
9 Dec 2021
17 Dec 2021
9 Dec 2021
16 Dec 2021
9 Dec 2021
9 Dec 2021 - 13 Dec 2021
Amount
Earth work excavation in ordinary kanker mixed hard soil I/c 1.50 m lift and 30 m.lead.
Earth work excavation in ordinary kanker mixed hard soil I/c 1.50m to 1.80 m lift and 30 m.lead.
Earth work excavation in ordinary kanker mixed hard soil I/c 1.80 m to 2.10 m lift and 30 m.lead.
Earth work excavation in ordinary kanker mixed hard soil I/c 2.10 m to 2.40 m lift and 30 m.lead.
Earth work excavation in ordinary kanker mixed hard soil I/c 2.40 m to 2.70 m lift and 30 m.lead.
Removal of slush from nala bed before excavation s.soil Up to 2.40 m. to 2.70 m lift and 30 m. lead
Earth work excavation in ordinary kanker mixed hard soil I/c 2.70 m to 3.0 m lift and 30 m.lead.
Removal of slush from Nala bed before excavation s.soil
E/W excavation in foundation in mar,kabar ordinary & kanker mixed saturated soil beyond 2.0 m lift &10 m lead
P.C.C. Work in 1:3:6 cement sand & 20-40 mm stone- ballast I/c cost of materials labour etc. as per required.
R.C.R. stone masonary work in 1:4 cement sand morter I/c the cast of material labour etc. required.for proper complition of the work in foundation.& S Struture.
R.R. stone masonary work in 1:4 cement sand morter I/c the cast of material labour etc. required for proper complition of the work in foundation. & Super Struture.
C.C.Work 1:2:4 cement, sand, 9- 20 mm stone granite grite I/c cast of materials labour etc.as per Required
Plaster work 1:3 cement sand mortar on stone masonary I/c cast of material, labour etc.Required proper completion of work.
Raised Pointing work 1:2 cement sand mortar on stone masonary I/c cast of material labour etc.Required as per proper completion of work.
Dry stone boulder filing on tailous/filter I/c cost of material labour etc.
Laying of c.sand in inverted filter including cost of material labour etc
Laying of moorum in inverted filter including cost of material labour etc
Laying of Gravel/Bajri in inverted filter including cost of material labour etc
Dewatring charges during the work by 5 H.P.Diesel pumpset with operator & P.O.L.
SHUBHAM ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .