| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr Quoted ₹1.3 Cr | L1 | Accepted-AOC The Lowest Bid after negotiation has been accepted by the Chief Engineer,WRD., Madurai Region, Madurai vide Proc.No.TS/ DO1/71T/2025-26/Dt.10.02.2026. |
| 2 | L2₹1.3 CrRejected-AOC | ₹1.3 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹1.3 CrRejected-AOC | ₹1.3 Cr | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | A ULAGU LAKSHMANAN L2 | MS.RAJKAMAL CONTRACTORS L3 | SUBBIAH MADASAMY L1 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing juliflora jungle without uprooting as directed by the Engineer complying with standard specification. | 23,245 | Sqm | 8.2 ₹1.9 L | 8.5 ₹2.0 L | 8.1 ₹1.9 L |
| 2.00 | Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning etc. complete including extra watering and compaction of earth fill layers to specified density of 95% of proctor density through deployment of appropriate compaction equipment (standard 8-10 ton power roller; short width drum vibratory power roller; vibratory power roller, complete complying with standard specification and as directed by the Departmental Officers. | 11,450 | Cum | 114 ₹13.1 L | 116 ₹13.3 L | 110 ₹12.6 L |
| 3.00 | Earth work deploying earth moving machineries for desilting channel and forming bund on either side depositing the earth on banks including jungle clearence etc., complete complying with standard specification and as directed by the Departmental Officers. | 3,310 | Cum | 47 ₹1.6 L | 49 ₹1.6 L | 46 ₹1.5 L |
| 4.00 | Dismantling, clearing away and carefully stacking material useful for reuse for any thickness of brick or stone masonry in Cement Mortar walls under 3 (Three) metres high complying with standard specification and as directed by the Engineer. | 57.95 | Cum | 316 ₹18,312.20 | 325 ₹18,833.75 | 308 ₹17,848.60 |
| 5.00 | Dismantling, clearing away and carefully stacking material useful for reuse for any thickness Plain Cement concrete complying with standard specification and as directed by the Engineer in charge of work and as per technical specifications | 278.8 | Cum | 540 ₹1.5 L | 556 ₹1.6 L | 530 ₹1.5 L |
| 6.00 | Dismantling, clearing away and carefully stacking material and without disturbing nearby structure useful for reuse for any thickness R.C.C etc, complete as directed by the Engineer in charge of works and as per the technical specifications | 11.1 | Cum | 4,800 ₹53,280 | 4,950 ₹54,945 | 4,680 ₹51,948 |
| 7.00 | Earth work excavating and depositing on bank with a initial lead of 10 m & initial lift of 2 m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil including refilling the excavated earth as directed by the Engineer in charge and watering and consolidation of earth fill layers throw appropriate compaction equipment complying with standard specification and as directed by the departmental officers. (cut open bund) SS 20B | 918.5 | Cum | 137 ₹1.3 L | 140 ₹1.3 L | 135 ₹1.2 L |
| 8.00 | Refilling the excavated earth in layers not exceeding 23cm thickness and watering to OMC (Optimum Moisture content) and compaction of each layer to 95% of proctor Density through deployment of appropriate compaction equipment (8-10T power roller) vibratory power roller of short width ( 0.90m width drum) power roller or vibratory power roller/fuel operated or electrically operated, vibratory plate compactors, ensuring compaction of designed bund section including side slopes etc., complete complying with standard specification and as directed by the Departmental Officers. (other than Sand) | 470.2 | Cum | 95 ₹44,669 | 98 ₹46,079.60 | 93 ₹43,728.60 |
| 9.00 | Earthwork excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil inclusive of shoring to full depth strutting and bailing out water wherever necessary and refilling the sides of foundation with excavated soil other than sand in layers of not more than 15 cm thick, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with an initial lead of 10 metres and initial lift of 2 metres and clearing, levelling the site etc., complete complying with standard specification and as directed by the departmental officers. | 459.7 | Cum | 290 ₹1.3 L | 300 ₹1.4 L | 285 ₹1.3 L |
| 10.00 | Supplying and filling with CS sand of each layer not more than 15 cm thick including consolidation etc complete and as per the technical specifications directed by the Engineer in charge of the works For sluices, weirs sand retainig wall etc., complete complying with standard specification and as directed by the Departmental Officers. | 53.85 | Cum | 1,950 ₹1.1 L | 2,000 ₹1.1 L | 1,910 ₹1.0 L |
Updated dates
Tender Value
₹1.2 Cr
EMD Value
₹72,000
Closing Date
30 Oct 2025, 3:00 pmClosed
Superintending Engineer,WRD.,
Vaippar Basin Circle, WRD Campus, Opp. to VVV College, Madurai Road, Virudhunagar.
Rehabilitation of Amuthakulam Tank at Sivandipatti Village of Srivilliputhur Taluk in Virudhunagar District.
2025_WRD_612948_1
7 /VBC/C.T-N/25-26/Dt.06.10.25
Open Tender
Civil Works - Water Works
270 days
Sivandipatti Village of Srivilliputhur Taluk in Vi
Refer Tender Document
7 documents required · 7 mandatory
₹0
₹72,000
17 Feb 2026
13 Oct 2025
31 Oct 2025
13 Oct 2025
30 Oct 2025
13 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_732417.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_732417.xls
BOQ • 0.37 MB
TenderDocumentAmuthakulam.pdf
Tender Documents • 1.13 MB
Download all tender documents and submit your bid