| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H2₹12.9 LAccepted-AOC | ₹12.9 L | H2 | Accepted-AOC - |
| 2 | H1₹13.0 LRejected-Finance | ₹13.0 L | H1 | Rejected-Finance - |
| Sl No | Description | Qty | Unit | M. Kalaimani H1 | S. Moorthy H2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete., | 66.07 | M3 | 250 ₹16,517.50 | 246.5 ₹16,286.26 |
| 2.00 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete., | 7.16 | M3 | 4,970 ₹35,585.20 | 4,966.1 ₹35,557.28 |
| 3.00 | Reinforced Cement concrete 1:11/2:3 mix using 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 23.32 | M3 | 8,650 ₹2.0 L | 8,645.2 ₹2.0 L |
| 4.00 | Reinforced Cement concrete 1:11/2:3 mix using 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 115.2 | M2 | 630 ₹72,576 | 628 ₹72,345.60 |
| 5.00 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. | 2,332.05 | kg | 90 ₹2.1 L | 89.8 ₹2.1 L |
| 6.00 | Brick work with cement mortar 1:5 mix using country bricks of size 83/4"x41/4"x2" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. | 39.01 | M3 | 6,335 ₹2.5 L | 6,331.2 ₹2.5 L |
| 7.00 | Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc | 413 | M2 | 265 ₹1.1 L | 264.7 ₹1.1 L |
| 8.00 | Exterior Emulsion paint Two coats with good quality of approved Emulsion paint including cost of all materials to site and all labour charges for mixing applying and proper curring etc., Complete as per Standard Specifications for 10 sqm | 413 | M2 | 250 ₹1.0 L | 245.55 ₹1.0 L |
| 9.00 | Supplying and fixing of M.S grill of approved design for doors, windows and ventilators using necessary mild steel flats for inner and outer memebers which should be fixed to window frames inclusive of priming coat of best approved quality red oxide primer etc., complete complying with standard specifications. | 50 | KGS | 115 ₹5,750 | 113.8 ₹5,690 |
| 10.00 | Providing and laying Red Gravel for 150 mm thick in layers of finished thickness of 75 mm thick each including cost and conveyance of Gravel from approved quarry to working site and stacking them to departmental gauge for pre measurement including labourcharges for sperading watering including all leads for water and consolidation by power roller rolling including hire and fuel charges for all tools and plants employed and all other incidental charges etc, complete complying as per clause 301&305 of MORTH specification. | 900 | M3 | 326 ₹2.9 L | 324.4 ₹2.9 L |
Tender Value
Refer Docs
EMD Value
₹15,500
Closing Date
6 Aug 2025, 6:00 pmClosed
Executive Officer Thenkarai Town Panchayat
Executive Officer Thenkarai Town Panchayat
Construction of compound wall in ward no 15 RR Park Thenkarai Town Panchayat
2025_DTP_588008_1
76-2-2025
Open Tender
Civil Works
Construction of compound wall in ward no 15 RR P
Pls refer to the Tender Documents
3 documents required · 3 mandatory
₹0
₹15,500
Yes
Executive Officer Thenkarai Town Panchayat
27 Feb 2026
1 Aug 2025
6 Aug 2025
1 Aug 2025
6 Aug 2025
1 Aug 2025
4 Aug 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid