Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-Work Certificate for last 3 years and IT Statement for last 3 years are not attached |
| 2 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-Tender documents i.e., Prequalification details are not attached |
| 3 | Not Admitted-Fee/PreQual/Technical K PITCHAMPATTI | CHENNAI | TAMIL NADU | 600019 | Not Admitted-Fee/PreQual/Technical Others-EMD Paid details are not correctly attached |
Tender Value
₹12.5 L
EMD Value
₹13,000
Closing Date
17 Jun 2026, 3:00 pmClosed
Block Development Officer (VP), Natham
Block Development Office, Natham
1)Construction of compound wall (40m) and toilet arrangements near OHT,2)Providing pipe line from OHT to newly constructed bath tub (295m),3)Construction of bath tub for burial ground at L.Malaiyur, H/O Lingavadi
2026_RDTN_680170_1
15thFINANCE2025-26/TN05/141
Open Tender
Civil Works
Works
Natham
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹13,000
Yes
Block Development Office, Natham
17 Jun 2026
10 Jun 2026
17 Jun 2026
10 Jun 2026
17 Jun 2026
10 Jun 2026
15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.Construction of compound wall (40m) and toilet arrangements near OHT at L.Malaiyur, H/O Lingavadi
Estimate Amount Rs.7.25 Lakhs | - | - | - | - |
| 2 | Construction of Compound wall | - | - | - | - |
| 3 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation As Per SS20 B | 16.07 | one cubic metre | - | - |
| 4 | Supplying and filling in foundation and basement and trenches with FILLING SAND in layers of not more than 15cm thick, well watered,rammed and consolidated complying with standard specification etc.,complete. | 2.04 | one cubic metre | - | - |
| 5 | CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification. | 2.83 | one cubic metre | - | - |
| 6 | REINFORCED CEMENT CONCRETE 1:1.5:3 mix using 20mm machine crushed 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work excluding cenetering, shuttering and cost of reinforcement grills placed in position | 8.58 | one cubic metre | - | - |
| 7 | Supplying & Erecting centering for sides & soffits including necessary supports & strutting up to 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle | - | - | - | - |
| 8 | Below GL | 27.86 | Sq.m | - | - |
| 9 | Above GL | 23.18 | Sq.m | - | - |
| 10 | Supplying, fabricating and placing in position mild steel/Ribbed tor steel rods for all RCC works including cost of steel and binding wire also in all floors, complete complying with standard specfication. | 0.65 | MT | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
Tendernotice_2.pdf
PDF • 0.57 MB
BOQ_817298.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .