Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Fee/PreQual/Technical/Finance | -32.72% | ₹2.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.1 L+₹32,424 (11.5%)Admitted-Fee/PreQual/Technical/Finance | -25.00% | ₹3.1 L+₹32,424 (11.5%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.2 L+₹34,255.20 (12.1%)Admitted-Fee/PreQual/Technical/Finance | -24.56% | ₹3.2 L+₹34,255.20 (12.1%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.2 L
EMD Value
₹8,400
Closing Date
4 Aug 2026, 6:00 pmClosed
EXEN REW SRINAGAR
OFFICE OF THE EXECUTIVE ENGINEER REW SRG
Construction of Lane and Drain from House of Afzal Hussain Wani to Imam Bargah at Wani Mohalla Balhama-B
2026_RDPR_317855_19
ENIT13/REW SGR 2026-27
Open Tender
Civil Works
Percentage
SRINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Rural Development and Panchayati Raj
₹8,400
7 Aug 2026
27 Jul 2026
5 Aug 2026
27 Jul 2026
4 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge:1:3:6 or richer mix (i/c equivalent design mix) | - | CUM | - | - |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 25 meter beyond 1 m from cutting edge.All kinds of soil | - | CUM | - | - |
| 3 | Providing and laying of dry stone soling (hand packed) incl. carriage of same by MT 15 Kms. | - | CUM | - | - |
| 4 | P/Laying of Cast-in-Situ Cement Concrete of M7.5 Mix (1:4:8) using 40mm nom. size stone aggregate. | - | CUM | 1 | - |
| 5 | Providing and laying of RCC spun pipes 9" dia including with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints ,earth work in excavation , cushion over pipes and refilling of the same excavated material including cost and carriage complete. incl stone dust/ sand bedding | 1 | RM | - | - |
| 6 | P/Laying of Cast-in-Situ Cement Concrete of M15 Mix (1:2:4) using 20mm nom. size stone aggregate. | 1 | CUM | - | - |
| 7 | P/Laying of 40 mm thick M15 grade flooring using 20mm nom. size stone aggregate | - | SQM | - | - |
| 8 | Providing and fixing in position cast-iron manhole cover (2'-0"x2'-0") size including frame of required shape and approved quality. | - | NOS | - | - |
| 9 | P/Laying of Cast-in-Situ Cement Concrete of M10 Mix (1:3:6) using 20mm nom. size stone aggregate and plum as 20% (Using Vibrator for compaction of concrete.) | - | CUM | - | - |
| 10 | P/Fixing of formwork so as to give a rough finish i/c removal of same. | 1 | SQM | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_1044155.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .