Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹57,350Accepted-Finance BHAGWATI NAGAR JAMMU | 1 | Accepted-Finance found eligible | |
| 2 | 2₹62,900+₹5,550 (9.68%)Accepted-Finance | 2 | Accepted-Finance found eligible | |
| 3 | 3₹67,200+₹9,850 (17.2%)Accepted-Finance BYPASS NH NEAR SBI SIDHRA JAMMU | 3 | Accepted-Finance found eligible |
Tender Value
₹75,000
Closing Date
13 Aug 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer MID Akhnoor/Nowshera
Office of the Executive Engineer MID Akhnoor/Nowshera
Restoration of various electromechanical equipments damaged due to flash floods at LIS Argi Baljaralan.
2021_IFC_132988_1
33/MID/AN
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
15 days
Akhnoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Yes
Executive Engineer MID Akhnoor/Nowshera
Exempted
Office of the Executive Engineer MID Akhnoor/Nowsh
25 Aug 2021
3 Aug 2021
14 Aug 2021
3 Aug 2021
13 Aug 2021
4 Aug 2021
5 Aug 2021
180 days
Restoration of 50 HP motor of pumping unit no.1,2 &3 installed at LIS Argi Baljaralan . The job involves disconnecting all electrical connections, decoupling the motors from the pump, removing from the base plateby using manual labour and suitable tools& tackles. Dismantling the motor ,extraction of the rotor and bearings. Cleaning of rotor and stator winding with petrol and chemical cleanser. Varnishing the rotor and stator with Dr. Beck compound or equivalent make of varnish in two coats, drying by hot air process. Checking IR value of the winding with the help of megohmmeter. Greasing of the bearings . Assembling of motor. The job also includes cleaning of aluminium and copper cable by using PF solvent to make it moisture and silt free. Refitting the motor at its installed position and coupling with pump, making of electrical connections, alignment with pump. Testing of motor on full load. Complete job includes the cost of material, hiring charges of tools & tackles, transportation charges , labour charges for skilled and semiskilled labour to be employed at site for execution of job including the out station charges etc. Complete job
Restoration of 4cusec discharge 24 m head HC pump of pumping Unit No. 1,2&3 installed at LIS Argi Baljaralan. Job involves removing the top cover, extraction of shaft and impeller assembly together with bearing brackets. Cleaning the pump body and the impeller shaft assembly by water to remove the mud/silt . Assembling the pump using oil paper packing sheet at each joints, proper locking of bearings without play and greasing of all the movable parts. P/F of gland packing. Coupling the pump and motor after proper alignment/adjustment. Priming the pump and testing on full load. Job includes cost of material, tools and tackles, labour charges. Complete Job.
De-silting of 200mm dia foot valves of pumping unit no. 1 ,2 & 3 at LIS Argi Baljaralan by way of decoupling the foot valve by cutting/unfastening the nuts and bolts from suction lines . Extraction of foot valves from the sump by removing the mud/silt around the periphery of the foot valve with help of manual labour. Dismantling of foot valve after unfastening/cutting the nuts & bolts. Cleaning of foot valve from mud and silt by washing with water . Assembling the foot valve and P/F of new rubber packing sheet, nuts and bolts etc. Lowering the foot valve in the river & coupling with suction pipe by providing new rubber packing sheet, nuts bolts and washers. Checking for leakages. Priming the pump & testing/commissioning on full load. The job includes cost of material, labour, transportation etc as per site conditions of LIS
Restoration of 2 HP monoblock priming pump installed at LIS Argi Baljaralan . The job involves complete dismantling of internal parts of the pump. Complete rewinding of 2 HP motor of priming pump.. Providing and fitting of new bearings ( 2 nos.) , new motor fan, gland plate with studs. Providing and fitting of new foot valve 2” on suction pipe. Assembling of priming pump with greasing of bearings . Testing of pump set on no load condition at workshop . Fitting of priming pump at site . Complete job with cost of material , labour for installation at site.
M/S RAGHUNATH MECHANICAL AND ELECTRICAL ENGINEERING WORKS
G S ENGINEERING WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .