| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.6 CrAccepted-AOC | ₹45.6 Cr Quoted ₹48.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹48.7 CrRejected-Finance GRAM DEVRADA TARABGANJ DISTRICT GONDA UTTAR PRADESH | GONDA | UTTAR PRADESH | 271001 | ₹48.7 Cr | L2 | Rejected-Finance REJECTED DUE TO HIGHER RATES. |
| 3 | L3₹49.5 CrRejected-Finance B 708 SECTOR C MAHANAGAR LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | ₹49.5 Cr | L3 | Rejected-Finance REJECTED DUE TO HIGHER RATES. |
| Sl No | Description | Qty | Unit | M/s Alok Construction L2 | M/s Raj Laxmi Enterprises L1 | M/S SURYANSH INFRA DEVELOPERS PVT LTD L3 |
|---|---|---|---|---|---|---|
| 1.00 | (Excavation in soil using Hydraulic Excavator and Tippers and will be re-used for the embankment purpose) Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections and transporting to the embankment location within all lifts and lead upto 1000 m.(Including Labour Cess but excluding GST) | 27,702 | Cum | 60 ₹16.6 L | 58 ₹16.1 L | 60 ₹16.6 L |
| 2.00 | (Construction of Embankment with material obtained from Roadway) Construction of embankment shoulders with approved material obtained from pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No 300.2 (Compaction only)(Including Labour Cess but excluding GST) | 33,070 | Cum | 80 ₹26.5 L | 77 ₹25.5 L | 120 ₹39.7 L |
| 3.00 | (Construction of Embankment with material obtained from Roadway) Construction of embankment shoulders with approved material obtained from pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No 300.2 (Including Labour Cess but excluding GST) | 1,02,146 | Cum | 135 ₹1.4 Cr | 132 ₹1.3 Cr | 150 ₹1.5 Cr |
| 4.00 | (Construction of Embankment with material obtained from Borrow pits) Construction of embankment shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No 300-2(Including Labour Cess but excluding GST) | 3,774 | Cum | 135 ₹5.1 L | 135 ₹5.1 L | 150 ₹5.7 L |
| 5.00 | (Construction of subgrade and Earthen Shoulders) Construction of subgrade and earthen shoulders with approved material obtained from pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No 300.2 (Including Labour Cess but excluding GST) | 10,463 | Cum | 135 ₹14.1 L | 135 ₹14.1 L | 180 ₹18.8 L |
| 6.00 | Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.(Including Labour Cess but excluding GST) | 10,065 | Cum | 60 ₹6.0 L | 58 ₹5.8 L | 50 ₹5.0 L |
| 7.00 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.( in widening portion) (Including Labour Cess but excluding GST) | 15,390 | cum | 4,600 ₹7.1 Cr | 4,580 ₹7.0 Cr | 4,900 ₹7.5 Cr |
| 8.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density..(Including Labour Cess but excluding GST) | 9,720 | cum | 5,200 ₹5.1 Cr | 5,120 ₹5.0 Cr | 5,500 ₹5.3 Cr |
| 9.00 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical broom.(Including Labour Cess but excluding GST) | 48,600 | sqm | 35 ₹17.0 L | 37 ₹18.0 L | 38 ₹18.5 L |
| 10.00 | Providing and laying dense graded bituminous macadam with 100 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder as per job mix , transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 507 complete in all respects. (Including Labour Cess but excluding GST) | 13,097 | cum | 11,500 ₹15.1 Cr | 11,400 ₹14.9 Cr | 11,564 ₹15.1 Cr |
Updated dates
Tender Value
₹50 Cr
EMD Value
₹50 L
Closing Date
16 Jan 2026, 12:00 pmClosed
SUPERINTENDING ENGINEER
OFFICE OF SE UNNAO CIRCLE PWD UNNAO
WIDENING AND STRENGTHENING OF KOTHAWAN MALL ROAD ODR LENGTH 32.400 KM IN DIST. HARDOI WITH FIVE YEAR MAINTENANCE
2025_CEUCZ_1096568_1
6234/M/1MT/E-TENDER/UC/2025 DT 21.11.2025
Open Tender
Civil Works - Roads
455 days
HARDOI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹50 L
Yes
SUPERINTENDING ENGINEER
28 Feb 2026
6 Dec 2025
16 Jan 2026
6 Dec 2025
16 Jan 2026
6 Dec 2025
9 Dec 2025
(Excavation in soil using Hydraulic Excavator and Tippers and will be re-used for the embankment purpose) Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections and transporting to the embankment location within all lifts and lead upto 1000 m.(Including Labour Cess but excluding GST)
(Construction of Embankment with material obtained from Roadway) Construction of embankment shoulders with approved material obtained from pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No 300.2 (Compaction only)(Including Labour Cess but excluding GST)
(Construction of Embankment with material obtained from Roadway) Construction of embankment shoulders with approved material obtained from pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No 300.2 (Including Labour Cess but excluding GST)
(Construction of Embankment with material obtained from Borrow pits) Construction of embankment shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No 300-2(Including Labour Cess but excluding GST)
(Construction of subgrade and Earthen Shoulders) Construction of subgrade and earthen shoulders with approved material obtained from pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No 300.2 (Including Labour Cess but excluding GST)
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.(Including Labour Cess but excluding GST)
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.( in widening portion) (Including Labour Cess but excluding GST)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density..(Including Labour Cess but excluding GST)
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical broom.(Including Labour Cess but excluding GST)
Providing and laying dense graded bituminous macadam with 100 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder as per job mix , transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 507 complete in all respects. (Including Labour Cess but excluding GST)
Providing and applying tack coat with VG-10 using bitumen distributor at the rate of 0.20 kg per sqm on the prepared surface cleaned witout hydraulic broom .(Including Labour Cess but excluding GST)
Providing and laying bituminious concrete using crushed aggregates of specified grading, premixed with bituminous binder as per job mix, transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 509 complete in all respects. (Including Labour Cess but excluding GST)
Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the engineer-in-charge with in a distance of 60 m (200ft) (as per SOR 2020 Item No 692) (Including Labour Cess but excluding GST)
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days..(Including Labour Cess but excluding GST)
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.(Including Labour Cess but excluding GST)
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. (Including Labour Cess but excluding GST)
Furnishing and placing reintforced cement concrement in super structure as per drawing and Technical Specifications. (M-25) (Including Labour Cess but excluding GST)
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.(Including Labour Cess but excluding GST)
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications. (Including Labour Cess but excluding GST)
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MORTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.(Including Labour Cess but excluding GST)
Providing and laying reinforced cement concrete M 20 grade in superstructure as per drawing and technical specifications clauses 800, 1205.4 and 1205.5 (for Retaining Wall) (Including Labour Cess but excluding GST)
Maintenance of constructed road for next five years after the actual date of completion. The amount to be paid as total maintenance cost for Next five years in the form of installment as given below. 1st year Zero and 2nd year after the actual date of completion @0.25% of total Construction cost. (Including Labour Cess but excluding GST)
3rd year @ 0.5% of total Construction cost
4th year @ 0.75% of total Construction cost
5th year @ 1.00% of total Construction cost
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.74 MB
ADDENDUMS.pdf
Tender Documents • 1.31 MB
BOQ_2018785.xls
BOQ • 0.31 MB
SBD.pdf
Additional Documents • 1.66 MB
Download all tender documents and submit your bid