Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹3.4 L+₹2,719.97 (0.80%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹3.5 L+₹11,649.88 (3.44%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L3₹3.5 L+₹11,649.88 (3.44%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L3₹3.5 L+₹11,649.88 (3.44%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
27 Jul 2026, 6:55 pmClosed
Executive Engineer REW Pulwama
Executive Engineer REW Pulwama
FINDC2627102095-(FENCING AND DEVELOPMENT OF SPORTS FIELD PLAY GROUND AT DUSOO)
2026_RDPR_316188_4
e- NIT No. 52/2026-27 Dated 15-07-2026
Open Tender
Civil Works
Percentage
Pulwama
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Executive Engineer REW Pulwama
₹10,000
4 Aug 2026
15 Jul 2026
28 Jul 2026
15 Jul 2026
27 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 120.82 | sqm | - | - |
| 2 | CEMENT PLASTER (IN FINE SAND) 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) | 158.57 | sqm | 1 | ₹158.41 |
| 3 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete | 1,616.28 | kg | 1 | ₹1,614.66 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6(1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 18.4 | cum | - | - |
| 5 | Providing and placing of plum including all carriages and lifts complete job | 4.6 | cum | - | - |
| 6 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge. 16.25.1 Made of G.I. wire of dia 3 mm | 1,950 | sft | - | - |
| 7 | Painting steel work with deluxe multi surface paint of
required shade to give an even shade. Two or more coats applied @ 0.90litre/10sqm over an under coat of primer applied @ 0.80litre/10sqm of approved brand and manufacture | 65.24 | sqm | - | - |
| 8 | Carriage of sand and 20mm Stone Aggregates by MT to SOW | 26.93 | cum | - | - |
| 9 | Provision for Photographs,Sign board and Unforseen Items and weepholes | 1 | C. job | - | - |
stage.html
html • 0.05 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_1029894.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .