Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹4.7 LAccepted-Finance | ₹4.7 L | L 1 | Accepted-Finance OK |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-CONDITION NOT FULFILLED |
Tender Value
₹4.7 L
EMD Value
₹9,300
Closing Date
18 Apr 2026, 12:00 pmClosed
EXECUTIVE OFFICER
NAGAR PALIKA NOGAWA
4339/3
2026_DLB_550812_3
MBN/2026-27/4339
Open Tender
Civil Works
365 days
NAGAR PALIKA NOGAWA
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MDRISL EXECUTIVE OFFICER
₹9,300
Yes
22 Apr 2026
10 Apr 2026
20 Apr 2026
10 Apr 2026
18 Apr 2026
10 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | - | Nos | - | - |
| 2 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar1:6 (1 cement : 6 fine/ coarse sand) | - | Nos | - | - |
| 3 | Art painting work on walls situated different places in Alwar city with three coat of water proof putty of approved brand after duly rubbing the surface to make the surface even and smooth. The work includes one coat of exterior primer coat of approved brand and three or more coat of exterior plastic emulasation paint of approved brand over the prepared surface. over this Rajasthani art painting work to be done as per direction & design pattern approved by engineer inchareg. The work includes the cost of all centering & shuttering scaffolding and cleaning the site properly after completion of work. The work also includes the cost of all material, man power, stencils etc. required for Art painting. | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_981963.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid