Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
20 Oct 2026, 5:00 pmDue today
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
E O NPP Hata
E O NPP Hata
Construction of RCC Wall And CC Road Near Singhna Pul Ramp
2026_DOLBU_1196568_1
316
Open Tender
Civil Works
Percentage
60 days
ward no 15 sahbazpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
E O NPP Hata
₹1.6 L
14 Oct 2026
14 Oct 2026
21 Oct 2026
14 Oct 2026
20 Oct 2026
14 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam clau or sand) including lift upto 1.50 m & lead up to 30 m including filling watering and ramming of excavated earth into the trenches or into space between the building and sides of foundation treanch or in to the plinth removal & disposal of surpluse earth as directed by the engineer in charge up to distance of 30 m from the foundation trenches ( excluding royalty) si 251 | 121 | Cum | 120 | ₹14,520 |
| 2 | Concrete with 4 cm gauge Brick ballast, Fine Sand of 1.25 F.M. and cement in proportion of 8:4:1 in foundation & under floors including supply of all materials, labour and T&P etc. required for proper completion of work, finish to required template as per direction of Engineer-in-charge.as per S.I no 275 | 16.5 | Cum | 3,170 | ₹52,305 |
| 3 | R.C.C.slab work with cement and approved coarse sand & 2 cm gauge approved stone ballast in the proportion of 1:1.5:43excluding supply of reinforcement and its bending but including its fixing & binding the same with 24 B.W.G.gi binding wire and including necessary cenering & suttering etc.and also including supply of all material including work complete in all respect as per 284 | 109.95 | Cum | 7,910 | ₹8,69,704.5 |
| 4 | Mild steel or iron in plain work such as in reinforced concrete or reinforce brick work (when not include over all rates) wrought to reruired shape as necessary including bending for poper completion of work and including supply of steel its wastage bend hooks and authorized over lapping shall be measured. as per Is 504. | 129.47 | Qtl | 5,800 | ₹7,50,926 |
| 5 | E/w in cutting or embankment in ordinary soil ,cartage up to 8 km | 1,085 | Cum | 311 | ₹3,37,435 |
| 6 | R.C.C.slab work with cement and approved coarse sand & 2 cm gauge approved stone ballast in the proportion of 1:1.5:43excluding supply of reinforcement and its bending but including its fixing & binding the same with 24 B.W.G.gi binding wire and including necessary cenering & suttering etc.and also including supply of all material including work complete in all respect as per 284 | 4.23 | Cum | 8,335 | ₹35,257.05 |
| 7 | Mild steel or iron in plain work such as in reinforced concrete or reinforce brick work (when not include over all rates) wrought to reruired shape as necessary including bending for poper completion of work and including supply of steel its wastage bend hooks and authorized over lapping shall be measured. as per Is 504 | 4.15 | Qtl | 5,800 | ₹24,070 |
| 8 | M-150brick in 1:4cement and coarse sand mortar in foundation and plinth including supply of all marerials, labours and T&P etc.required for proper completition of the work. (Si305) | 3.08 | cum | 4,555 | ₹14,029.4 |
| 9 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 60 | cum | 4,069 | ₹2,44,140 |
| 10 | S/L of 125 micron polythene sheet under the foundation over subbase to act as a separation between subbase and cons. Slab (for c.c. slab) including supply of all materials labours and T&P etc. | 400 | sqm | 23.9 | ₹9,560 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_2260608.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .