Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹10.3 LAccepted-AOC | L-1 | Accepted-AOC accepted | |
| 2 | L-2₹7.2 L+₹99,814 (16.0%)Rejected-Finance | L-2 | Rejected-Finance Rejected | |
| 3 | L-3₹8.6 L+₹2.4 L (38.2%)Rejected-Finance | L-3 | Rejected-Finance Rejected |
Tender Value
₹7.2 L
EMD Value
₹14,415
Closing Date
14 Feb 2023, 5:00 pmClosed
Executive Engineer
JSD Rampur
Restoration of Rain Damages to Sewerage scheme rampur Town Tehsil Rampur
2023_HPIPH_68408_1
EE-JSD-RMP-E-TEN/22-17302-52 DT. 08.02.23
Open Tender
Civil Works
Item Rate
90 days
Rampur
Please refer Tender documents.
6 documents required · 6 mandatory
₹400
EE Rampur
₹14,415
Yes
21 Nov 2023
8 Feb 2023
15 Feb 2023
8 Feb 2023
14 Feb 2023
8 Feb 2023
Amount
Demolition of stone masonry above Ground level up to 1.50 mtrs depth i/c stacking the servicable material with in all leads & lift as per direction of Engineer-in-charge .
Excavation in earth work and disposal of all excavated earth up to all leads and lifts, disposed earth to be levelled neatly dressed as per direction and to the entire satisfaction of the Engineer-in-Charge.
Prov.and laying cement concrete 1:4:8(1Cement: 4 Sand:8 Graded stone agg.40mm nominal size)& curing complete excluding cost of form work in foundation and plinth as per direction & to the entire satisfaction of the Engineer-in-Charge.
Prov.form work with steel plates 3.15mm thick welded with angle iron frame 30 x 30 x 5mm so as to give a fair finish including centring, shuttering,strutting & propping etc. with wooden battens and ballies, height of propping & centering below supporting floor to ceiling not exceeding 4mtr.& removal of same for insitu rainforceed concrete and plain concrete work complete in all leads and lifrs and as per the directioin and to the entire satisfaction of the Engineer-in-Charge :-
Vertical surfaces such as walls ( any thickness ) partition and the like including attached pillasters buttresses, plinth and string courses and the like.
Providing and laying cement concrete 1 : 2 :4 (1 cement :2 sand :4 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcemnt for reinforced concrete work complete in all respect with in all leads and lifts as per the direction and to the entire satisfaction of Engineer-in-Charge .
Foundation and plinth complete as per the direction and to the entire satisfaction of the Engineer-in-Charge.
Walls (any thickness but not less than 0.10m thickness) attached pillaster, buttresses, plinth & string courses etc from top of foundaation level upto floor two level as per the direction & to the entire satisfaction of the Engineer-in-Charge.
Prov. Laying & jointing of mild steel / tor steel reinforcement for reinforced cement concrete work including bending, binding and placing in position complete upto floor two level complete in all leads and lifts and as per the direction and to the entire satisfaction of the Engineer-in-Charge. Tor Steel.
Stone/ Boulder filling behind the R/wall & B/wall complete in all respect with in all leads and lifts as per direction & to the entire satisfaction of Engineer-in-charge.
Prov. & fixing PVC Pipe 110 mm dia for weep hole complete in all respect with in all leads and lifts as per direction & to the entire satisfaction of Engineer-in-charge.
M/S PREM CHAND
Jai Chand Rana
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .