Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.7 LAccepted-Finance BHAGWATI NAGAR JAMMU | 1 | Accepted-Finance FOUND ELIGIBLE | |
| 2 | 2₹1.7 L+₹1,620 (0.95%)Accepted-Finance | 2 | Accepted-Finance FOUND ELIGIBLE | |
| 3 | 3₹1.7 L+₹3,600 (2.10%)Accepted-Finance BYPASS NH NEAR SBI SIDHRA JAMMU | 3 | Accepted-Finance FOUND ELIGIBLE |
Tender Value
₹1.9 L
EMD Value
₹3,700
Closing Date
8 Aug 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer MID Akhnoor/Nowshera
Office of the Executive Engineer MID Akhnoor/Nowsh
Strengthening of Pumping unit no. 1 along with other allied electro-mechanical works at LIS Nazlachak.
2020_IFC_101663_1
32/MID/AN
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
5 days
Akhnoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Yes
Executive Engineer MID Akhnoor/Nowshera
₹3,700
Yes
Office of the Executive Engineer MID Akhnoor/Nowsh
11 Aug 2020
31 Jul 2020
10 Aug 2020
1 Aug 2020
8 Aug 2020
1 Aug 2020
4 Aug 2020
180 days
Strengthening of 06 cusec discharge 36 m head H.C pump no. 01 at LIS Nazlachak .De-coupling of pump from the motor and removing the top cover, extraction of shaft and impeller assembly together with bearing bracket and shifting to the workshop by using manual labour and mechanical transport. Complete dismantling of impeller assembly. Fabrication of new pump shaft as per the size . Providing/ fitting of DE bearing and one no. bush in lieu of worn out one. Fabrication of glands and studs with nut. Fabrication of neck rings as per sample. . Re-assembling of impeller shaft assembly and shifting back to site and there after lowering at proper position, placement of oil seal and closing the top cover along with P/F new nuts, bolts and studs coupling with motor. P/F of gland packing etc.and testing on no load. The Job includes cost of material, labour(skilled and unskilled), loading charges, hire charge of tool and tackles, to and fro carriage charges. Complete job
Strengthening / repair of 200mm dia. foot valve of pumping Unit No. I at site of LIS Nazlachak by disconnecting of foot valve from the suction pipe and extraction it out of the canal by using manual labour and suitable tools /tackles. Dismantling of foot valve & separating the strainer from the foot valve. De silting of foot valve and dismantling of foot valve mechanism with flap & rings etc. Strengthening of foot valve strainer by providing and welding of new M.S sections as per site requirements. Replacement of worn-out leather washer, nuts/bolts by p/f of new leather washer cut to size, new nuts/bolts & washers etc. Complete assembly of foot valve and connecting strainer with foot valve & fitting with suction pipes by p/f of new flange packing material, nuts/bolts. Complete job includes material cost & labour charges for dismantling/fitting, strengthening, manual handling at the site of LIS. Complete Job
Reconditioning of 630KVA electric Transformer installed at LIS Nazlachak. The job involves disconnecting all electrical connections and Lifting the transformer from its installed position and loading in the vehicle with the help of crane and shifting to workshop with mech. transport. Unloading at workshop . Disassembling the transformer at workshop by unscrewing the bolts of top cover and extracting the body with chain pulley block. Rewinding its 1 no. H.V. & 2 no. L.V. coils with superior copper wire of requisite size/gauge. Replacement of 2 no. damaged LT bush rods with the new bush rods as per sample. Providing /Fitting of new gasket, L.T. terminal plate, nuts, bolts, etc. Cleaning of the tank and drying it. Providing/Topping up of 60 litre transformer oil and heating the oil to make it moisture free. Lowering the windings back in the tank Assembling the transformer by tightening all nuts, bolts and using oil packing sheets wherever necessary. Loading in the vehicle and shifting back to site . Job includes placing of transformer on the foundation with the help of crane using skilled manual labour. . Fitting the transformer and restoration of electrical connections. Testing & commissioning on full load.. Complete job including cost of material, skilled and semi-skilled labour charges, loading & unloading at both ends and transportation charges as per site conditions of LIS. Complete job
M/S RAGHUNATH MECHANICAL AND ELECTRICAL ENGINEERING WORKS
G S ENGINEERING WORKS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .