Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 CrAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.9 Cr+₹66.2 L (10.5%)Rejected-Finance BAROLA BYE PASS OPP ADA COLONY ALIGARH 202001 UP | ALIGARH | ALIGARH | UTTAR PRADESH | 202001 | L2 | Rejected-Finance L2 | |
| 3 | L3₹10.2 Cr+₹4.0 Cr (63.3%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹11.6 Cr+₹5.3 Cr (84.4%)Rejected-Finance WH 47 OFFICE NO 01 MAYAPURI INDUSTRIAL AREA PHOASE 1 REWARI LINE MAYAPURI INDUSTRIAL AREA PHOASE 1 NEW DELHI | L4 | Rejected-Finance L4 | |
| 5 | Rejected-Technical | - | Rejected-Technical Techno-commercially rejected |
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
14 Oct 2025, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GM (Contracts)
Indian Oil Corporation Limited (Pipelines Division) A-1, Udyog Marg, Sector-1, NOIDA (UP) 201 301, INDIA
LAYING 6.625 INCH OUTER DIAMETER PIPE (WITH OR WITHOUT OFC CONDUIT) THROUGH HDD METHOD FOR CROSSINGS ACROSS RIVERS, NALAS, HIGHWAYS, EXPRESSWAYS ETC. IN THE ROUTE OF EXTENSION OF PJPL LPG PIPELINE FROM JALANDHAR TO GOINDWAL SAHIB BOTTLING PLANT
2025_PLHO_186549_1
PLCC/JGPL HDD Offloading/others/25096
Open Tender
Civil Works
Works
183 days
In the state of Punjab
As per tender documents
9 documents required · 9 mandatory
₹1.7 L
Yes
Online through VC
17 Jun 2026
27 Sept 2025
15 Oct 2025
27 Sept 2025
14 Oct 2025
4 Oct 2025
27 Sept 2025 - 4 Oct 2025
3 Oct 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2GST % for the tender Please select the rate of GST in cell AY13. Rate selected shall be applicable for the entire BoQ. | |||||
| 10Offloading-HDD Works-PJPL EXT GJPL | |||||
| 10.1 | Design, detailed engineering & installation of pipeline / pipeline & OFC conduit across rivers, NH, SH, Expressways, Railways, etc by HDD method. #Complete work for the crossing (between the limits, as indicated in the approved drawings) including mobilization & de-mobilization at site(s), supply of all materials as per the `Scope of Supply' and all consumables, equipment, manpower & other resources and arranging the required land for site preparations and execution of, but not limited to, the following works in accordance with the specifications, drawings and as per all provisions of the contract document and instructions of the Owner. #Interpretation of data of hydrological / geo-technical surveys furnished by the Owner, carrying out fresh topographic survey of the rivers, NH, SH, Expressways, Railways, etc & developing new profile drawing for the crossing location, carrying out additional surveys required for collecting data relevant to design and construction of the crossing, performing all engineering & design calculations, preparation of all necessary construction drawings for approval of the Owner as per the provisions of contract document, preparation of detailed construction method statement and design analysis. #Taking delivery and transportation of Owner-supplied 3LPE coated pipes to the work site from designated stockpile location, inspection of the coated pipes visually and/or with holiday detector for defects, including arranging all necessary intermediate storage area required thereof till the pipes are installed in permanent position. #Complete site preparation including arranging of required land, setting up of fabrication yard, preparation of temporary arrangement for pipeline stringing, launching etc. #Carrying out repair of pipe defects, replacement in the case of non-repairable defects and repairing damages to pipe coating including defects/ damages occurring during transportation and handling. #Pre-construction surveys and collection of all necessary data. #String preparation including repair of pipe and pipe coating defects, welding, non-destructive testing of welds including 100% radiography (by X-ray), supply of films & all equipment and providing all facilities to Owner's representative(s) for examining radiographs, repair of defects in the. welds and re-testing etc. #Coating of the field joints of the pipe string to be installed by HDD method with DIRAX heat shrink sleeves of M/s Raychem's make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approved make used for HDD crossings. #Repair of all coating damages in the pipe section to be laid by HDD method by full encirclement sleeves using suitable cut sections of approved quality of heat shrink sleeves of M/s Raychem make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approved make. #Fabrication of 89mm OD steel conduit with an inner duct of 40mm OD HDPE pipe for OFC (wherever OFC has to be laid along with the carrier pipeline). #Supply & fixing of easy to install heat shrinkable duct end caps for HDPE conduit for OFC (wherever OFC has to be laid along with the carrier pipeline). #Carrying out air cleaning, gauge pigging and pre-installation hydrostatic testing of the complete pipeline string, as per the sp ecifications, including repair of defects and retesting etc. #Installation of the pipeline / pipeline and OFC conduit as a bundle crossing below the rivers, NH, SH, Expressways, Railways, etc by single horizontal directional drilling operation to the correct profile as per the approved drawings. #Carrying out post-installation hydrostatic testing of HDD pipe string (along with transition pipe section). #Carrying out post-installation coating survey as per approved procedure. #Restoration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc. #Transportation of surplus Owner-supplied pipes to the designated stockpile location of the Owner. #Preparation of as-built drawings and other records etc. #All other works not specifically listed herein, but required as per specifications, drawings, provisions of the contract document, calculations and construction method statement, leading to successful completion of the works. Note:-The Contractor shall have the option for installation of 89 mm OFC conduit as Bundled HDD installation along with the HDD installation of carrier pipe OR as a separate HDD instalation. However, the payment and payment terms shall remain the same in both the cases. HDD INSTALLATION (Carrier Pipe with OFC Conduit) UPTO 100 METERS 6.625" in Normal Soil : HDD Works for Carrier Pipe-Non ITC | 10 | M | 4,392.69 | ₹43,926.9 |
| 20Offloading-HDD Works-PJPL EXT GJPL | |||||
| 20.1 | Design, detailed engineering & installation of pipeline / pipeline & OFC conduit across rivers, NH, SH, Expressways, Railways, etc by HDD method. #Complete work for the crossing (between the limits, as indicated in the approved drawings) including mobilization & de-mobilization at site(s), supply of all materials as per the `Scope of Supply' and all consumables, equipment, manpower & other resources and arranging the required land for site preparations and execution of, but not limited to, the following works in accordance with the specifications, drawings and as per all provisions of the contract document and instructions of the Owner. #Interpretation of data of hydrological / geo-technical surveys furnished by the Owner, carrying out fresh topographic survey of the rivers, NH, SH, Expressways, Railways, etc & developing new profile drawing for the crossing location, carrying out additional surveys required for collecting data relevant to design and construction of the crossing, performing all engineering & design calculations, preparation of all necessary construction drawings for approval of the Owner as per the provisions of contract document, preparation of detailed construction method statement and design analysis. #Taking delivery and transportation of Owner-supplied 3LPE coated pipes to the work site from designated stockpile location, inspection of the coated pipes visually and/or with holiday detector for defects, including arranging all necessary intermediate storage area required thereof till the pipes are installed in permanent position. #Complete site preparation including arranging of required land, setting up of fabrication yard, preparation of temporary arrangement for pipeline stringing, launching etc. #Carrying out repair of pipe defects, replacement in the case of non-repairable defects and repairing damages to pipe coating including defects/ damages occurring during transportation and handling. #Pre-construction surveys and collection of all necessary data. #String preparation including repair of pipe and pipe coating defects, welding, non-destructive testing of welds including 100% radiography (by X-ray), supply of films & all equipment and providing all facilities to Owner's representative(s) for examining radiographs, repair of defects in the. welds and re-testing etc. #Coating of the field joints of the pipe string to be installed by HDD method with DIRAX heat shrink sleeves of M/s Raychem's make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approved make used for HDD crossings. #Repair of all coating damages in the pipe section to be laid by HDD method by full encirclement sleeves using suitable cut sections of approved quality of heat shrink sleeves of M/s Raychem make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approved make. #Fabrication of 89mm OD steel conduit with an inner duct of 40mm OD HDPE pipe for OFC (wherever OFC has to be laid along with the carrier pipeline). #Supply & fixing of easy to install heat shrinkable duct end caps for HDPE conduit for OFC (wherever OFC has to be laid along with the carrier pipeline). #Carrying out air cleaning, gauge pigging and pre-installation hydrostatic testing of the complete pipeline string, as per the sp ecifications, including repair of defects and retesting etc. #Installation of the pipeline / pipeline and OFC conduit as a bundle crossing below the rivers, NH, SH, Expressways, Railways, etc by single horizontal directional drilling operation to the correct profile as per the approved drawings. #Carrying out post-installation hydrostatic testing of HDD pipe string (along with transition pipe section). #Carrying out post-installation coating survey as per approved procedure. #Restoration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc. #Transportation of surplus Owner-supplied pipes to the designated stockpile location of the Owner. #Preparation of as-built drawings and other records etc. #All other works not specifically listed herein, but required as per specifications, drawings, provisions of the contract document, calculations and construction method statement, leading to successful completion of the works. Note:-The Contractor shall have the option for installation of 89 mm OFC conduit as Bundled HDD installation along with the HDD installation of carrier pipe OR as a separate HDD instalation. However, the payment and payment terms shall remain the same in both the cases. HDD INSTALLATION (Carrier Pipe with OFC Conduit) UPTO 100 METERS 6.625" in Normal Soil : HDD Works : Extra for OFC Duct installation - ITC | 10 | M | 1,810.73 | ₹18,107.3 |
| 30Offloading-HDD Works-PJPL EXT GJPL | |||||
| 30.1 | Design, detailed engineering & installation of pipeline / pipeline & OFC conduit across rivers, NH, SH, Expressways, Railways, etc by HDD method. #Complete work for the crossing (between the limits, as indicated in the approved drawings) including mobilization & de-mobilization at site(s), supply of all materials as per the `Scope of Supply' and all consumables, equipment, manpower & other resources and arranging the required land for site preparations and execution of, but not limited to, the following works in accordance with the specifications, drawings and as per all provisions of the contract document and instructions of the Owner. #Interpretation of data of hydrological / geo-technical surveys furnished by the Owner, carrying out fresh topographic survey of the rivers, NH, SH, Expressways, Railways, etc & developing new profile drawing for the crossing location, carrying out additional surveys required for collecting data relevant to design and construction of the crossing, performing all engineering & design calculations, preparation of all necessary construction drawings for approval of the Owner as per the provisions of contract document, preparation of detailed construction method statement and design analysis. #Taking delivery and transportation of Owner-supplied 3LPE coated pipes to the work site from designated stockpile location, inspection of the coated pipes visually and/or with holiday detector for defects, including arranging all necessary intermediate storage area required thereof till the pipes are installed in permanent position. #Complete site preparation including arranging of required land, setting up of fabrication yard, preparation of temporary arrangement for pipeline stringing, launching etc. #Carrying out repair of pipe defects, replacement in the case of non-repairable defects and repairing damages to pipe coating including defects/ damages occurring during transportation and handling. #Pre-construction surveys and collection of all necessary data. #String preparation including repair of pipe and pipe coating defects, welding, non-destructive testing of welds including 100% radiography (by X-ray), supply of films & all equipment and providing all facilities to Owner's representative(s) for examining radiographs, repair of defects in the. welds and re-testing etc. #Coating of the field joints of the pipe string to be installed by HDD method with DIRAX heat shrink sleeves of M/s Raychem's make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approved make used for HDD crossings. #Repair of all coating damages in the pipe section to be laid by HDD method by full encirclement sleeves using suitable cut sections of approved quality of heat shrink sleeves of M/s Raychem make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approved make. #Fabrication of 89mm OD steel conduit with an inner duct of 40mm OD HDPE pipe for OFC (wherever OFC has to be laid along with the carrier pipeline). #Supply & fixing of easy to install heat shrinkable duct end caps for HDPE conduit for OFC (wherever OFC has to be laid along with the carrier pipeline). #Carrying out air cleaning, gauge pigging and pre-installation hydrostatic testing of the complete pipeline string, as per the sp ecifications, including repair of defects and retesting etc. #Installation of the pipeline / pipeline and OFC conduit as a bundle crossing below the rivers, NH, SH, Expressways, Railways, etc by single horizontal directional drilling operation to the correct profile as per the approved drawings. #Carrying out post-installation hydrostatic testing of HDD pipe string (along with transition pipe section). #Carrying out post-installation coating survey as per approved procedure. #Restoration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc. #Transportation of surplus Owner-supplied pipes to the designated stockpile location of the Owner. #Preparation of as-built drawings and other records etc. #All other works not specifically listed herein, but required as per specifications, drawings, provisions of the contract document, calculations and construction method statement, leading to successful completion of the works. Note:-The Contractor shall have the option for installation of 89 mm OFC conduit as Bundled HDD installation along with the HDD installation of carrier pipe OR as a separate HDD instalation. However, the payment and payment terms shall remain the same in both the cases. HDD INSTALLATION (Carrier Pipe with OFC Conduit) UPTO 100 METERS 6.625" in Rocky Soil : HDD Works for Carrier Pipe-Non ITC | 10 | M | 10,135.05 | ₹1,01,350.5 |
| 40Offloading-HDD Works-PJPL EXT GJPL | |||||
| 40.1 | Design, detailed engineering & installation of pipeline / pipeline & OFC conduit across rivers, NH, SH, Expressways, Railways, etc by HDD method. #Complete work for the crossing (between the limits, as indicated in the approved drawings) including mobilization & de-mobilization at site(s), supply of all materials as per the `Scope of Supply' and all consumables, equipment, manpower & other resources and arranging the required land for site preparations and execution of, but not limited to, the following works in accordance with the specifications, drawings and as per all provisions of the contract document and instructions of the Owner. #Interpretation of data of hydrological / geo-technical surveys furnished by the Owner, carrying out fresh topographic survey of the rivers, NH, SH, Expressways, Railways, etc & developing new profile drawing for the crossing location, carrying out additional surveys required for collecting data relevant to design and construction of the crossing, performing all engineering & design calculations, preparation of all necessary construction drawings for approval of the Owner as per the provisions of contract document, preparation of detailed construction method statement and design analysis. #Taking delivery and transportation of Owner-supplied 3LPE coated pipes to the work site from designated stockpile location, inspection of the coated pipes visually and/or with holiday detector for defects, including arranging all necessary intermediate storage area required thereof till the pipes are installed in permanent position. #Complete site preparation including arranging of required land, setting up of fabrication yard, preparation of temporary arrangement for pipeline stringing, launching etc. #Carrying out repair of pipe defects, replacement in the case of non-repairable defects and repairing damages to pipe coating including defects/ damages occurring during transportation and handling. #Pre-construction surveys and collection of all necessary data. #String preparation including repair of pipe and pipe coating defects, welding, non-destructive testing of welds including 100% radiography (by X-ray), supply of films & all equipment and providing all facilities to Owner's representative(s) for examining radiographs, repair of defects in the. welds and re-testing etc. #Coating of the field joints of the pipe string to be installed by HDD method with DIRAX heat shrink sleeves of M/s Raychem's make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approved make used for HDD crossings. #Repair of all coating damages in the pipe section to be laid by HDD method by full encirclement sleeves using suitable cut sections of approved quality of heat shrink sleeves of M/s Raychem make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approved make. #Fabrication of 89mm OD steel conduit with an inner duct of 40mm OD HDPE pipe for OFC (wherever OFC has to be laid along with the carrier pipeline). #Supply & fixing of easy to install heat shrinkable duct end caps for HDPE conduit for OFC (wherever OFC has to be laid along with the carrier pipeline). #Carrying out air cleaning, gauge pigging and pre-installation hydrostatic testing of the complete pipeline string, as per the specifications, including repair of defects and retesting etc. #Installation of the pipeline / pipeline and OFC conduit as a bundle crossing below the rivers, NH, SH, Expressways, Railways, etc by single horizontal directional drilling operation to the correct profile as per the approved drawings. #Carrying out post-installation hydrostatic testing of HDD pipe string (along with transition pipe section). #Carrying out post-installation coating survey as per approved procedure. #Restoration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc. #Transportation of surplus Owner-supplied pipes to the designated stockpile location of the Owner. #Preparation of as-built drawings and other records etc. #All other works not specifically listed herein, but required as per specifications, drawings, provisions of the contract document, calculations and construction method statement, leading to successful completion of the works. Note:-The Contractor shall have the option for installation of 89 mm OFC conduit as Bundled HDD installation along with the HDD installation of carrier pipe OR as a separate HDD instalation. However, the payment and payment terms shall remain the same in both the cases. HDD INSTALLATION (Carrier Pipe with OFC Conduit) UPTO 100 METERS 6.625" in Rocky Soil : HDD Works : Extra for OFC Duct installation - ITC | 10 | M | 3,193.92 | ₹31,939.2 |
| 50Offloading-HDD Works-PJPL EXT GJPL | |||||
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
Tender Document • 0.29 MB
T_11 (Indemnity Bond).docx
Tender Document • 0.03 MB
Addendum1.pdf
Tender Document • 0.39 MB
Addendum2.pdf
Tender Document • 0.17 MB
T_10 Available Geotechnical Investigation reports.pdf
Tender Document • 46.13 MB
15. Beas_River_Geotech_Report_Ch._80_409.65_Date_04.06.2025_1_.pdf
Tender Document • 9.54 MB
5. East Or White Bein River Geotech Report Ch. Ch. 09_439.34.pdf
Tender Document • 8.58 MB
PPE Guidelines.pdf
Tender Document • 8.38 MB
PLCC25096.pdf
Tender Document • 5.87 MB
7. NH-44 (Nanak Nagri To Khajurla) Geotech Report Ch. 16_578.62.pdf
Tender Document • 5.14 MB
6. BG Railway (Chiheru to Jalandhar Cantt) Geotech Report Ch. 16_410.84.pdf
Tender Document • 4.95 MB
PPP MII Order dated 16 09 2020.pdf
Tender Document • 4.23 MB
S_3_ML-HDD-Specification.pdf
Tender Document • 4.19 MB
12. BG Railway (Dudwindi to Pajian) Geotech Report Ch. 62_931.89-min.pdf
Tender Document • 3.53 MB
16. EXPRESSWAY (Propsed Dehli Amritsar Katra) Geotech Report Ch. 84_603.02-min.pdf
Tender Document • 3.42 MB
2. NH-3 (Jalandhar - Hoshiarpur) Geotech Report Ch. 02_006.83-min.pdf
Tender Document • 3.40 MB
13. NH-703A (Dudwindi To Karahal Kalan) Geotech Report Ch. 63_027.68-min.pdf
Tender Document • 3.27 MB
14. EXPRESSWAY (UC Amritsar - Bhatinda-Jamnagar Express Way ) Geotech Report Ch. 70_451.06-min.pdf
Tender Document • 3.24 MB
11. East or White Bein River Geotech Report Ch. 42_604.96.pdf
Tender Document • 3.24 MB
3. BG Railway (Jalandhar Cantt - Bolina Doaba) Geotech Report Ch. 03_755.18-min.pdf
Tender Document • 3.22 MB
8. BG Railway (Thabalke TO Jamsher Khas) Geotech Report Ch. 30_592.63-min.pdf
Tender Document • 3.22 MB
Integrity Pact Format-Annexure-27.pdf
Tender Document • 3.13 MB
9. EXPRESSWAY (Proposed Dehli Gurdaspur Expressway) Geotech Report Ch. 37_770.07-min.pdf
Tender Document • 3.10 MB
4. NH-UC Jalandhar Bypass Geotech Report Ch. 08_235.44-min.pdf
Tender Document • 3.08 MB
Special_Instructions_to_the_Bidders_Version_5_dated_30_June_2025.pdf
Tender Document • 2.80 MB
1. BG Railway (Jalandhar - Dhogri) Geotech Report Ch 00_046.88-min.pdf
Tender Document • 2.63 MB
10. NH-703 (Gohir To Kang Sahbu) Geotech Report Ch. 39_508.34-min.pdf
Tender Document • 2.49 MB
T_15 Weightage.pdf
Tender Document • 1.52 MB
Bidders_help_Document_for_Preferencial_Bidding_20230207_v1.pdf
Tender Document • 0.82 MB
FAQs-IOCL-Online-EMD.pdf
Tender Document • 0.55 MB
PJ LPG EXT-33-00.pdf
Tender Document • 0.51 MB
PJ LPG EXT-10-00.pdf
Tender Document • 0.51 MB
PJ LPG EXT-17-00.pdf
Tender Document • 0.48 MB
PJ LPG EXT-09-00.pdf
Tender Document • 0.47 MB
PJ LPG EXT-18-00.pdf
Tender Document • 0.46 MB
PJ LPG EXT-19-00.pdf
Tender Document • 0.45 MB
PJ LPG EXT-05-00.pdf
Tender Document • 0.45 MB
PJ LPG EXT-04-00.pdf
Tender Document • 0.45 MB
PJ LPG EXT-06-00.pdf
Tender Document • 0.44 MB
Annexure_Commercial_25096.xls
Tender Document • 0.44 MB
PJ LPG EXT-11-00.pdf
Tender Document • 0.44 MB
T_16 Hinderance Register.pdf
Tender Document • 0.44 MB
PJ LPG EXT-21-00.pdf
Tender Document • 0.43 MB
PJ LPG EXT-32-00.pdf
Tender Document • 0.41 MB
PJ LPG EXT-29-00.pdf
Tender Document • 0.40 MB
PJ LPG EXT-03-00.pdf
Tender Document • 0.25 MB
PJ LPG EXT-01-00.pdf
Tender Document • 0.24 MB
MoPNG order dt 26042022.pdf
Tender Document • 0.22 MB
PJ LPG EXT-07-00.pdf
Tender Document • 0.18 MB
PJ LPG EXT-28-00.pdf
Tender Document • 0.18 MB
PJ LPG EXT-30-00.pdf
Tender Document • 0.17 MB
T_14 (Contractor Performance Format).docx
Tender Document • 0.17 MB
Tender-Acceptance-Format.pdf
Tender Document • 0.08 MB
T_15 (CPE Allocation of Marks).docx
Tender Document • 0.06 MB
T_19 Bond of Hypothetication.docx
Tender Document • 0.04 MB
T_2 (HDD Experience).doc
Tender Document • 0.04 MB
T_17 Stock Issue Register.pdf
Tender Document • 0.03 MB
T_18 Site Instruction Register.pdf
Tender Document • 0.03 MB
T_6(A) (Approved List of Vendors).docx
Tender Document • 0.03 MB
T_6(C) (Undertaking from bidders).docx
Tender Document • 0.03 MB
T_12 (Uniform hourly eqpt rates).docx
Tender Document • 0.03 MB
T_6(B) (Proposed sub-contractors).docx
Tender Document • 0.02 MB
T_4(A) (Format for Certificate from CA for HDD Rig.docx
Tender Document • 0.02 MB
T_4(B) (Format for Certificate from CE for HDD Rig.docx
Tender Document • 0.02 MB
T_5(A) (HDD Past Exp).docx
Tender Document • 0.02 MB
T_5(B) (Present Commitments-HDD).docx
Tender Document • 0.02 MB
T_3 (Deployment Schedule-HDD).docx
Tender Document • 0.02 MB
JGPL.kmz
Tender Document • 0.02 MB
T_13 (Uniform hourly manpower rates).docx
Tender Document • 0.02 MB
T_7 (Details of Rigs).docx
Tender Document • 0.02 MB
T_1 (Technical checklist for bidders).docx
Tender Document • 0.02 MB
T_8 (Exception_Deviation).docx
Tender Document • 0.02 MB
T_9 Drawings _ Route Map.docx
Tender Document • 0.02 MB
BOQ_197231.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .