Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.6 LAccepted-AOC | 1 | Accepted-AOC Accepted | |
| 2 | 2₹13.1 L+₹48,417 (3.84%)Rejected-Finance | 2 | Rejected-Finance Rejected | |
| 3 | 3₹13.2 L+₹53,743 (4.26%)Rejected-Finance | 3 | Rejected-Finance Rejected | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Exempted only for PEMD not for MSME | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Exempted only for PEMD not for MSME |
| Sl No | Description | Qty | Unit | Aqua and Aqua Solutions L2 | Sathish Kumar & Co L1 | CKV ENGINEERING L3 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling the existing chain link fencing, rolling, stocking and devlouting to the Central Stores/North including all leads, lifts, labour charges etc., complete. | 247 | RM | 43 ₹10,621 | 41 ₹10,127 | 33.93 ₹8,380.71 Lowest |
| 2.00 | Dismantling the existing G.I Angles, stacking and devlouting to the Central Stores/North including labour, leads, lifts, etc., complete. | 1,504 | kgs | 6.5 ₹9,776 | 6 ₹9,024 Lowest | 9.37 ₹14,092.48 |
| 3.00 | Chipping of concrete and roughening the wall top surface including all labour, lead, lift, etc., complete. | 75 | m² | 41 ₹3,075 | 40 ₹3,000 | 39.77 ₹2,982.75 Lowest |
| 4.00 | Brick work in CM 1:5 using fly ash bricks including cost of all materials, labour, curing scaffolding charges, leads, lifts etc., complete. | 110 | m3 | 6,191 ₹6,81,010 | 6,100 ₹6,71,000 Lowest | 6,781 ₹7,45,910 |
| 5.00 | Plastering in CM (1:5), 12 mm thick including cost of all material, labour, curing, scaffolding charges, leads, lifts, etc.,complete. | 990 | m² | 271 ₹2,68,290 | 280 ₹2,77,200 | 252 ₹2,49,480 Lowest |
| 6.00 | White washing two coats using white cement including cost of all materials, labour, scafolding charges, through scrapping, lead, lift, etc., complete. | 990 | m² | 139 ₹1,37,610 | 100 ₹99,000 | 95 ₹94,050 Lowest |
| 7.00 | SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only | 1 | Lumpsum | 9 ₹99,934.38 | 9 ₹96,241.59 Lowest | 9 ₹1,00,340.63 |
| 8.00 | CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only | 1 | Lumpsum | 9 ₹99,934.38 | 9 ₹96,241.59 Lowest | 9 ₹1,00,340.63 |
| 9.00 | Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only | 1 | Lumpsum | - | - | - |
Tender Value
Refer Docs
EMD Value
₹13,900
Closing Date
22 Jan 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/CEDC/North/CBE
O/o, The Superintending Engineer, CEDC/North, Coimbatore
SE/CEDC/N/CBE/C/No.29/25-26
2026_EB_640775_1
SE/CEDC/N/CBE/C/No.29/2025-26
Open Tender
Civil Works
Works
120 days
Anna Univeristy
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹13,900
Yes
25 Feb 2026
8 Jan 2026
23 Jan 2026
8 Jan 2026
22 Jan 2026
8 Jan 2026
Dismantling the existing chain link fencing, rolling, stocking and devlouting to the Central Stores/North including all leads, lifts, labour charges etc., complete.
Dismantling the existing G.I Angles, stacking and devlouting to the Central Stores/North including labour, leads, lifts, etc., complete.
Chipping of concrete and roughening the wall top surface including all labour, lead, lift, etc., complete.
Brick work in CM 1:5 using fly ash bricks including cost of all materials, labour, curing scaffolding charges, leads, lifts etc., complete.
Plastering in CM (1:5), 12 mm thick including cost of all material, labour, curing, scaffolding charges, leads, lifts, etc.,complete.
White washing two coats using white cement including cost of all materials, labour, scafolding charges, through scrapping, lead, lift, etc., complete.
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_767383.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .