| 1 | L1₹3.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.0 L+₹20,888.23 (5.53%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Joseph Arul Raj L1 | V. DAVID MICHAEL L2 |
|---|---|---|---|---|---|
| 1.00Maintenance work at class Room and Kitchen centre | |||||
| 1.01 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls .Dismantling Plain Cement Concrete | 15 | m3 | 483.77 ₹7,256.53 Lowest | 510.51 ₹7,657.65 |
| 1.02 | Earth work excavation and depositing on bank with initial lead of 10metres and lift of 2metres in all kinds of soil except mediumrock, dense medium rock and hard rock requiring blasting including refilling the sides of foundation with excavated earth in layers of 15cm thick, watering and consolidation and depositing the surplus earth with in the compound in places as shown by the departmental officers with initial lead and lift. cleaning,levelling the site etc,. complete complying with standard specifications.(TNBP No.20B) | 5 | m3 | 102.29 ₹511.43 Lowest | 107.94 ₹539.7 |
| 1.03 | Laying Plain cement concrete 1:4:8 (One cement,four sand and eight aggregates) using 40mm ISS Hard broken granite stone jelly for foundation and basement including watering if found necessary and laid inlayers of 15cm thick, and consolidated including curing, cost and conveyance of all materials to work site all labour and incidental charges etc,. complete complying with standard specifications.(TNBP No.28) | 7 | m3 | 5,035.45 ₹35,248.12 Lowest | 5,313.79 ₹37,196.51 |
| 1.04 | Supplying and filling the basement with Good Earth filling in layers of not more than 15cm thick well rammed watered and compacted - etc., complete complying with standard specification. | 8 | m3 | 268 ₹2,144.03 Lowest | 282.82 ₹2,262.54 |
| 1.05 | Random rubble masonry in cement motor 1:5 (one Part of cement, Five part of Crushed Stone Sand (M- Sand)) mix using all granite stones and bond stones for foundation and basement from approved quarry including watering, curing, and labour charges etc., completed as per standard specification | 4 | m3 | 5,395.23 ₹21,580.91 Lowest | 5,693.46 ₹22,773.83 |
| 1.06 | Providing steel centering for sides and soffits including supports and strutting upto 1:10/1:20 up to 3.29m height for plain surfaces such as RCC slabs, rectangular beams, Tee beams, bed blocks, Culvert body walls, deck slabs, retaining walls, staircase, Landing slab, landing beams, canopy etc., wood) joists of size 10cmx 6.5cm spaced at 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 15cm c/c including cost of nails, ropes, all labour charges and incidental charges etc. complete complying with standard specification.(TNBP Spl. No.154 A) | 6 | m2 | 330.22 ₹1,981.32 Lowest | 348.47 ₹2,090.84 |
| 1.07 | Laying Plain cement concrete 1:2:4 (One cement,two sand and four aggregates) using 20mm ISS Hard broken granite stone jelly for plain cement concrete works excluding cost of shuttering, and centering including all labour charges and incidental charges for cost and conveyance of all materials to work site, mixing and laying concrete finishing the surface nearly rough, compacting using vibrators, curing etc, complete complying with standard specification.(TNBP No.28) | 5 | m3 | 6,401.83 ₹32,009.15 Lowest | 6,755.7 ₹33,778.5 |
| 1.08 | Reinforced cement concrete 1:1½:3 (one cement and half sand and three aggregates) using 20mm ISS Hard broken granite stone jelly for Reinforced cement concrete works excluding cost of shuttering, and cost of reinforcement but including cost and conveyance of materials to work site, all labour charges and incidental charges for mixing and laying concrete,finishing the surface nearly rough, compacting using vibrators, curing etc, complete complying with standard specification.(TNBP No.30) | 1 | m3 | 8,006.02 ₹8,006.02 Lowest | 8,448.56 ₹8,448.56 |
| 1.09 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 80 | kg | 89.43 ₹7,154.45 Lowest | 94.37 ₹7,549.92 |
Tender Value
Refer Docs
EMD Value
₹4,900
Closing Date
17 Jun 2025, 3:00 pmClosed
Commissioner Nagercoil City Municipal Corporation
City Municipal Corporation Office Nagercoil 629001 Ph.No. 04652230984
Nagercoil Corporation Maintenance work at class Room and Kitchen centre at Vellalar Mela theru Govt Middle School and Compound wall work at Melatherukarai wellness centre in w.no.8
2025_MAWS_566178_1
76/2025-2026
Open Tender
Civil Works
Lump-sum
90 days
Nagercoil Corporation Maintenance work at class Ro
Registered Contractor
4 documents required · 4 mandatory
₹0
₹4,900
8 Aug 2025
7 Jun 2025
17 Jun 2025
7 Jun 2025
17 Jun 2025
7 Jun 2025
Amount
Maintenance work at class Room and Kitchen centre
Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls .Dismantling Plain Cement Concrete
Earth work excavation and depositing on bank with initial lead of 10metres and lift of 2metres in all kinds of soil except mediumrock, dense medium rock and hard rock requiring blasting including refilling the sides of foundation with excavated earth in layers of 15cm thick, watering and consolidation and depositing the surplus earth with in the compound in places as shown by the departmental officers with initial lead and lift. cleaning,levelling the site etc,. complete complying with standard specifications.(TNBP No.20B)
Laying Plain cement concrete 1:4:8 (One cement,four sand and eight aggregates) using 40mm ISS Hard broken granite stone jelly for foundation and basement including watering if found necessary and laid inlayers of 15cm thick, and consolidated including curing, cost and conveyance of all materials to work site all labour and incidental charges etc,. complete complying with standard specifications.(TNBP No.28)
Supplying and filling the basement with Good Earth filling in layers of not more than 15cm thick well rammed watered and compacted - etc., complete complying with standard specification.
Random rubble masonry in cement motor 1:5 (one Part of cement, Five part of Crushed Stone Sand (M- Sand)) mix using all granite stones and bond stones for foundation and basement from approved quarry including watering, curing, and labour charges etc., completed as per standard specification
Providing steel centering for sides and soffits including supports and strutting upto 1:10/1:20 up to 3.29m height for plain surfaces such as RCC slabs, rectangular beams, Tee beams, bed blocks, Culvert body walls, deck slabs, retaining walls, staircase, Landing slab, landing beams, canopy etc., wood) joists of size 10cmx 6.5cm spaced at 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 15cm c/c including cost of nails, ropes, all labour charges and incidental charges etc. complete complying with standard specification.(TNBP Spl. No.154 A)
Laying Plain cement concrete 1:2:4 (One cement,two sand and four aggregates) using 20mm ISS Hard broken granite stone jelly for plain cement concrete works excluding cost of shuttering, and centering including all labour charges and incidental charges for cost and conveyance of all materials to work site, mixing and laying concrete finishing the surface nearly rough, compacting using vibrators, curing etc, complete complying with standard specification.(TNBP No.28)
Reinforced cement concrete 1:1½:3 (one cement and half sand and three aggregates) using 20mm ISS Hard broken granite stone jelly for Reinforced cement concrete works excluding cost of shuttering, and cost of reinforcement but including cost and conveyance of materials to work site, all labour charges and incidental charges for mixing and laying concrete,finishing the surface nearly rough, compacting using vibrators, curing etc, complete complying with standard specification.(TNBP No.30)
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Brick work in CM 1:5 (one cement & five sand) using III class country bricks of size 8 3/4"X4 1/4" X 2 3/4" including finishing, curing, etc., complete complying with standard specification - 100CFT
Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications
Painting two coats Plastic Emulsion paint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc, complete as per standard specification.
Painting two coats with Ready Mixed Enamel Paint over the new iron works of approved quality and colour without priming coat including the cost all materials etc.,complete, in all floors.
Supplying and fixing of 7 stage advance water purification 30LPH filtration (Hot and Cold) capacity including RO+UV+ORC copper+NC+B12 Alkalaine+HTM+TDS control with carbonite memberence and 30lit storage tank including all accessories etc.complete
Paving the floor with design Antiskirt ceramic tiles (colour and shade as directed) of size 305 mm x 305mm x 6 mm in all floors over a base layer of cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 20mm thick laid in-situ and pointed with same coloured cement
Painting two coats with Ready Mixed Enamel Paint over the new iron works of approved quality and colour without priming coat including the cost all materials etc.,complete, in all floors.
Wiring with 2 x 1.5 sqmm (22 /0.3 ) PVC insulated single core unsheathed copper conductor cable of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 3mm thick hylum sheet cover with TW switch box and 5A F.T. switch with continuous earth wire connection of 14 SWG TC wire for making good for PVC Open light point / Fan point (For Electronic regulator) etc, complete as per standard specifications. SD 22
Supply and fixing of single box type 4'36 W flu fitting complete with electronic ballast with TW round blocks on wall or ceiling with flu tube with PVC unsheathed copper leads from terminals to the fitting(SD 87)
V. DAVID MICHAEL (BID ID -1368115)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .