Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68,089.37Accepted-Finance 36 151 E 73 PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 02 | ₹68,089.37 | L1 | Accepted-Finance L1 |
| 2 | L2₹69,762.55Accepted-Finance 35 238 V O C NAGAR THANGAMAPURIPATTINAM METTUR DAM 636 402 | SALEM | TAMIL NADU | 636402 | ₹69,762.55 | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | NEW SRI VENKATESWARA ENGINEERING WORKS L2 | SRI VAITHEESWARA CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for overhaul of 2T Chain block at 4.5mt of Unit I to IV near Stator Water cooler & 1 No. spare and load testing arrangements. 2 Ton Capacity | 5 | Nos | 9,800 ₹49,000 | 9,665 ₹48,325 |
| 2.00 | Charges for overhaul of 5T Chain block at Unit- IV SWGR control room and load testing Arrangements. 5 Ton Capacity | 1 | Nos | 11,500 ₹11,500 | 11,225 ₹11,225 |
| 3.00 | Charges for painting with 2 coats for chain block 2 Ton & 5 Ton (6 Nos) | 2.9 | Sqmtr | 99.5 ₹288.55 | 99.35 ₹288.12 |
| 4.00 | Charges for Load Testing and certification Fee
2 Ton Capacity | 5 | Nos | 1,200 ₹6,000 | 1,100 ₹5,500 |
| 5.00 | Charges for Load Testing and certification Fee
5 Ton Capacity | 1 | Nos | 1,800 ₹1,800 | 1,600 ₹1,600 |
| 6.00 | Material Charges
Cost of paint ( Yellow ) | 0.5 | Lit | 300 ₹150 | 295 ₹147.50 |
| 7.00 | Cost of Thinner | 0.5 | Lit | 88 ₹44 | 87.5 ₹43.75 |
| 8.00 | Cost of consumables (Lumsum) | 1 | Nos | 980 ₹980 | 960 ₹960 |
Tender Value
Refer Docs
Closing Date
19 Feb 2026, 2:00 pmClosed
CHIEF ENGINEER/MTPS-I
CHIEF ENGINEER MTPS-I METTUR DAM
MTPS-I ES Circle EM-I Complete overhaul load testing and certification of 2T chain blocks near SW cooler of unit-I to IV 5T chain block near Unit-IV SWGR control room for the year 2026
2026_EB_651902_1
CE-MTPSI-SE-ES-EMI-OT122-25-26
Open Tender
Electrical Works
10 days
MTPS-I/METTURDAM
AS PER TENDER SPECIFICATION
4 documents required · 4 mandatory
₹0
Yes
25 Feb 2026
5 Feb 2026
20 Feb 2026
5 Feb 2026
19 Feb 2026
5 Feb 2026
Charges for overhaul of 2T Chain block at 4.5mt of Unit I to IV near Stator Water cooler & 1 No. spare and load testing arrangements. 2 Ton Capacity
Charges for overhaul of 5T Chain block at Unit- IV SWGR control room and load testing Arrangements. 5 Ton Capacity
Charges for painting with 2 coats for chain block 2 Ton & 5 Ton (6 Nos)
Charges for Load Testing and certification Fee 2 Ton Capacity
Charges for Load Testing and certification Fee 5 Ton Capacity
Material Charges Cost of paint ( Yellow )
Cost of Thinner
Cost of consumables (Lumsum)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_781698.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid