Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Finance | -42.20% | ₹2.3 L | L1 | Admitted-Finance |
| 2 | L2₹2.4 L+₹13,880.53 (6.12%)Admitted-Finance | -38.66% | ₹2.4 L+₹13,880.53 (6.12%) | L2 | Admitted-Finance |
| 3 | L3₹2.4 L+₹16,076.32 (7.09%)Admitted-Finance | -38.10% | ₹2.4 L+₹16,076.32 (7.09%) | L3 | Admitted-Finance |
| 4 | L4₹2.5 L+₹26,271.06 (11.6%)Admitted-Finance | -35.50% | ₹2.5 L+₹26,271.06 (11.6%) | L4 | Admitted-Finance |
| 5 | L5₹2.5 L+₹26,859.22 (11.9%)Admitted-Finance | -35.35% | ₹2.5 L+₹26,859.22 (11.9%) | L5 | Admitted-Finance |
Tender Value
₹3.9 L
EMD Value
₹7,840
Closing Date
19 Aug 2026, 4:00 pmClosed
XEN REW Kathua
XEN REW Kathua
Constt of lane drain from link road to h/o Tarsem Lal and others Ward 5 Panchayat Forlain West A Block Barnoti
2026_RDPR_320791_2
e-NIT No.181/REW/K of 2026-27 Dated 13/08/2026 2nd call
Open Tender
Civil Works
Percentage
90 days
Barnoti
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹7,840
15 Sept 2026
13 Aug 2026
20 Aug 2026
13 Aug 2026
19 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth for 1 meter from cutting edge and disposal of surplus excavated earth as directed: | 9.56 | cum | 479.3 | ₹4,582.11 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 mix | 4.21 | cum | 4,826.5 | ₹20,319.57 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 23.1 | cum | 5,733.6 | ₹1,32,446.16 |
| 4 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine
with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge | 207.15 | cum | 816.15 | ₹1,69,065.47 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) | 2.43 | cum | 6,591.25 | ₹16,016.74 |
| 6 | Providing and laying DPC 40mm thick specified grade including curing in 1:2:4 | 13.94 | cum | 346.7 | ₹4,833 |
| 7 | Cetring and shuttering including strutting, propping etc and removal of the formwork for Foundation, footings Etc | 99.2 | sqm | 286.3 | ₹28,400.96 |
| 8 | Carriage of Sand,Bajri & aggt. for an Av. Lead 10 km | 41.15 | cum | 278.04 | ₹11,441.35 |
| 9 | Add cost of Sign board | 1 | No. | 5,000 | ₹5,000 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.92 MB
BOQ_1067693.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .