| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹10.3 LAccepted-AOC LALMATIA MAHAGAMA GODDA 814165 JHARKHAND INDIA | GODDA | GODDA | JHARKHAND | 814165 | ₹10.3 L Quoted ₹8.7 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹9.2 LRejected-Finance 115 BASDIHA GODDA 814165 JHARKHAND INDIA | GODDA | GODDA | JHARKHAND | 814165 | ₹9.2 L | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹9.5 LRejected-Finance NA GHAT NIMA LALMATIA GODDA 814165 JHARKHAND INDIA | GODDA | GODDA | JHARKHAND | 814165 | ₹9.5 L | L-3 | Rejected-Finance L-3 |
Tender Value
₹10.3 L
EMD Value
₹12,900
Closing Date
6 Mar 2026, 6:55 pmClosed
AE(C), RJML AREA
AREA OFFICE RAJMAHAL AREA, DHANKUNDA
Extension of RCC wall to prevent the illegal entry in to CHP premises from Nima village side under ROCP.
2026_ECL_354402_1
ECL/RJML/AGM/AE(C)/ e-Ten/25-26/561 Dt-24.02.2026
Open Tender
Civil Works - Others
30 days
Rajmahal OCP
Please refer Tender documents.
4 documents required · 4 mandatory
₹12,900
29 May 2026
24 Feb 2026
7 Mar 2026
24 Feb 2026
6 Mar 2026
24 Feb 2026
24 Feb 2026 - 27 Feb 2026
Item Description/ Heading
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm in depth 1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m, as directed by Engineer-in-charge.All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Mild steel and Medium Tensile steel bars
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Mild steel and Medium Tensile steel bars
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.09 MB
Tendernotice_2.pdf
PDF • 1.50 MB
BOQ_367223.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid