Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | -15.00% | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L1₹1.1 CrAdmitted-Finance 0 JAGDISHPUR SOHOULI MARTINGANJ TEH MARTINGANJ AZAMGARH UTTAR PRADESH 276301 | AZAMGARH | UTTAR PRADESH | 276301 | -15.00% | ₹1.1 Cr | L1 | Admitted-Finance |
| 3 | L1₹1.1 CrAdmitted-Finance | -15.00% | ₹1.1 Cr | L1 | Admitted-Finance |
| 4 | L1₹1.1 CrAdmitted-Finance B 304 RAJAJIPURAM AMBA PALACE AWAS VIKAS COLONY LUCKNOW UTTAR PRADESH 226001 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | -15.00% | ₹1.1 Cr | L1 | Admitted-Finance |
| 5 | L1₹1.1 CrAdmitted-Finance | -15.00% | ₹1.1 Cr | L1 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹8.4 L
Closing Date
28 Jan 2025, 3:00 pmClosed
Chief Engineer
Lucknow Municipal Corporation
Construction work of CC road and drain from next to Jagpal Kheda Primary School to Awasthi intersection link road under Bharwara Malhaur ward.
2025_DOLBU_993110_1
218/CE/2024-25
Open Tender
Civil Works
Percentage
180 days
Lucknow Municipal Corporation
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,096
Lucknow Municipal Corporation
₹8.4 L
27 Feb 2025
13 Jan 2025
28 Jan 2025
13 Jan 2025
28 Jan 2025
13 Jan 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in ordinary soil including 1.50mtr lift & 30mtr lead etc all complete. | 730.8 | Cum | 156 | ₹1,14,004.8 |
| 2 | Earthwork in cutting and filling with ordinary soil etc all comp | 696 | Cum | 110 | ₹76,560 |
| 3 | P/L CC 1:6:12 in cement fsand & 40mm brick ballast etc all complete. | 651.92 | Cum | 4,553 | ₹29,68,191.76 |
| 4 | RCC work in 1:2:4 in cement csand & stone grit etc all complete. | 278.4 | Cum | 7,340 | ₹20,43,456 |
| 5 | Centering and shuttering work including removal of form work etc all complete. | 2,088 | Sqm | 328 | ₹6,84,864 |
| 6 | MS or Iron work in RCC work such as reinforcement etc all complete. | 207.16 | Qtl | 6,900 | ₹14,29,404 |
| 7 | P/L CC in 1:1.5:3 in cement csand & stone grit etc all complete. | 652.5 | Cum | 7,314 | ₹47,72,385 |
| 8 | Making Trimix floor using floater as per direction of E/I. | 4,350 | Sqm | 100 | ₹4,35,000 |
| 9 | Providing and laying 125micron polythene etc all complete. | 4,350 | Sqm | 12 | ₹52,200 |
| 10 | Disposal of earth upto 4km distance etc all comp | 1,282.57 | Cum | 165.7 | ₹2,12,521.85 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .