Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹1.2 L
Closing Date
21 Dec 2021, 6:55 pmClosed
Xen REW Poonch
Xen REW Poonch
please refer in boq
2021_RDPR_153106_3
e-NIT No. 374 of REW POONCH, Dated 11-12-2021
Open Tender
Civil Works
Item Rate
20 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
Xen REW Poonch
Exempted
24 Dec 2021
14 Dec 2021
22 Dec 2021
14 Dec 2021
21 Dec 2021
14 Dec 2021
Amount
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earthlead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.... All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with . 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size
Dry random rubble masonry with hard stone in foundation and plinth: 7.3.1 With bond stone
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Centering and shuttering including strutting, propping etc. and removal of form work for:Suspended floors, roofs, landings, balconies and access platforms.
Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, pillars, piers, abutments, posts and struts.
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete.50 mm thick with 20mm nominal size stone aggregate
20mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand)
Carriage of Sand / Bajre 10 KM ByM/T and 200 Mtrs by H/L
Carriage of Stone 300 Mtrs by H/L
Carriage of Cement / Steel 10 KM ByM/T and 200 Mtrs by H/L
Installation / Construction of Sign Board (C.I.B) Showing details of project of required specifications, as directed by Engineer Incharge at Site.
Mehmood Ahmed
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .