| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.1 LAccepted-AOC JAMBAD COLLIERY PARSEA CHURULIA KAJORA 713384 WEST BENGAL INDIA | KAJORA | PASCHIM BARDHAMAN | WEST BENGAL | 713384 | ₹4.1 L | 1 | Accepted-AOC AS PER TC RECOMMENDATION |
| 2 | 2₹4.1 LRejected-AOC KAJORA KAJORA BAZAR KAJORA GRAM BARDHAMAN 713338 WEST BENGAL INDIA | BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713338 | ₹4.1 L | 2 | Rejected-AOC AS PER TC RECOMMENDATION |
| 3 | 3₹4.2 LRejected-AOC GAI GHATA MORE HARIPUR BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | ₹4.2 L | 3 | Rejected-AOC AS PER TC RECOMMENDATION |
| Sl No | Description | Qty | Unit | RAJESH YADAV L2 | TIPU ENGINEERING WORKS L3 | PARBATI ENTERPRISE L1 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 2.00 | Fitting of submersible pump motor set and pontoon for the new sump at coalface for Pump No.01 | 1 | Nos | 5,145.65 ₹5,145.65 | 5,145.65 ₹5,145.65 | 5,145.65 ₹5,145.65 |
| 3.00 | Installation of submersible pump motor pipeline, suction and delivery range, and fitting of foot valve | 1 | Nos | 10,291.3 ₹10,291.30 | 10,291.3 ₹10,291.30 | 10,291.3 ₹10,291.30 |
| 4.00 | Doing the same job for 2ⁿᵈ and 3rd pump in succession one after the other | 1 | Nos | 30,873.9 ₹30,873.90 | 30,873.9 ₹30,873.90 | 30,873.9 ₹30,873.90 |
| 5.00 | Before joining of the pipeline, fitting of flange and welding of flanges in the pipes | 1 | Nos | 6,174.78 ₹6,174.78 | 6,174.78 ₹6,174.78 | 6,174.78 ₹6,174.78 |
| 6.00 | Maintenance of the delivery pipelines for the next couple of weeks | 1 | Nos | 15,436.95 ₹15,436.95 | 15,436.95 ₹15,436.95 | 15,436.95 ₹15,436.95 |
| 7.00 | Suction and delivery pipe line work of turbine pump as the water level reduces | 1 | Nos | 20,582.6 ₹20,582.60 | 20,582.6 ₹20,582.60 | 20,582.6 ₹20,582.60 |
| 8.00 | Carrying, loading, transporting of 6 inch dia pipes 4 no.s on dumper from weighbridge site to Mahalaxmi site and then laying them and helping to make road for water drainin | 1 | Nos | 12,349.56 ₹12,349.56 | 12,349.56 ₹12,349.56 | 12,349.56 ₹12,349.56 |
| 9.00 | Non return and footvalve changing of No. 1 turbing pump after taking repaired valves from fitter store to site | 1 | Nos | 6,174.78 ₹6,174.78 | 6,174.78 ₹6,174.78 | 6,174.78 ₹6,174.78 |
| 10.00 | Foot valve maintenance of domestic pump, Pluro I-4 Stage, after taking repaired valves from fitter store to site | 1 | Nos | 4,116.52 ₹4,116.52 | 4,116.52 ₹4,116.52 | 4,116.52 ₹4,116.52 |
Tender Value
₹4.1 L
EMD Value
₹5,200
Closing Date
16 Feb 2026, 5:00 pmClosed
Area Engineer (EnM)
Office of the General Manager, Kajora Area
Fitting of submersible pump motor pipe complete set, suction side pipeline and valve repairing in domestic water supply pumps, suction and delivery pipeline work of submersible pumps of coal face and of turbine pumps of Jambad OCP
2026_ECL_352420_1
GM/Kaj/AEEnM/etender/25-26/55
Open Tender
Electrical and Maintenance Works
30 days
Kajora Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,200
9 Apr 2026
6 Feb 2026
17 Feb 2026
6 Feb 2026
16 Feb 2026
6 Feb 2026
6 Feb 2026 - 12 Feb 2026
Item Description/ Heading
Fitting of submersible pump motor set and pontoon for the new sump at coalface for Pump No.01
Installation of submersible pump motor pipeline, suction and delivery range, and fitting of foot valve
Doing the same job for 2ⁿᵈ and 3rd pump in succession one after the other
Before joining of the pipeline, fitting of flange and welding of flanges in the pipes
Maintenance of the delivery pipelines for the next couple of weeks
Suction and delivery pipe line work of turbine pump as the water level reduces
Carrying, loading, transporting of 6 inch dia pipes 4 no.s on dumper from weighbridge site to Mahalaxmi site and then laying them and helping to make road for water drainin
Non return and footvalve changing of No. 1 turbing pump after taking repaired valves from fitter store to site
Foot valve maintenance of domestic pump, Pluro I-4 Stage, after taking repaired valves from fitter store to site
Lifitng of motor or/and pump in case there is fault in the motor in the coming months, then necessary on site repairing and lowering of the pump
Delivery pipeline repairing in the highwalls
Suction side extension and pipeline work in the domestic pumps Pluro-1-4 stage pump as and when the water level recedes and also maintenance of the suction pump line
Road crossing by 4 inch dia MS Pipe for bigger pump and then making the delivery pipeline of the same bigger pump
Operation of one small pump on rent basis for dewatering of the sump for 20 days
Supply of nut bolt 5/8" x 2"
Supply of heliflex hose of submersible pump, durable quality, cable of handling
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_365213.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.55 MB
Tendernotice_2.pdf
PDF • 1.17 MB
BOQ_365213.xls
BOQ • 0.33 MB