Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.1 LAdmitted-Finance | -47.91% | ₹12.1 L | L1 | Admitted-Finance |
| 2 | L2₹12.6 LAdmitted-Finance | -45.77% | ₹12.6 L | L2 | Admitted-Finance |
| 3 | L3₹12.9 LAdmitted-Finance | -44.71% | ₹12.9 L | L3 | Admitted-Finance |
| 4 | L4₹13.8 LAdmitted-Finance | -41.00% | ₹13.8 L | L4 | Admitted-Finance |
| 5 | L5₹17.2 LAdmitted-Finance | -26.21% | ₹17.2 L | L5 | Admitted-Finance |
Tender Value
₹23.3 L
EMD Value
₹46,620
Closing Date
15 Jan 2026, 12:00 pmClosed
Executive Engineer public health engineering depar
Executive Engineer public health engineering department division Tonk
Operation and Maintenance of Rural Piped water supply scheme Dooni, Anwa and Nagarfort Block Deoli Under Sub Division Deoli District Tonk.
2025_PHCJA_523755_1
EE PHED DIVISION TONK WORKS NIT NO 94/2025-26
Open Tender
Civil Works
365 days
Executive Engineer public health engineering depar
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Secretary, RREIS
₹46,620
Yes
11 Feb 2026
29 Dec 2025
16 Jan 2026
29 Dec 2025
15 Jan 2026
29 Dec 2025
Operation and Maintenance of Rural Piped water supply scheme Dooni, Anwa and Nagarfort Block Deoli Under Sub Division Deoli District Tonk.
Daily/ periodical operation of valves at supply times for specified by department per sluice valve per month. (Valve rod and cap to be arranged by contractor)
80-300mm (63 Nos Valves)
Running expenditure of pumphouses which includes complete operation of pumpmotor , maintenance of log-books as directed by Engineer-in-charge, general upkeeping of premises, security arrangements, Regular chemical dosing in CWR, cleaning and desilting of SR/CWR/SUMP once every six months, daily valve operation under the Campus of pump house and all other works as mentioned in scope of work in tender document for per pump house per month. (power supply minimum 16 hrs) (excluding repairing of pumping machinery etc.)
Upto 100 HP (2 Nos.) RWSS Dooni and Anwa
Maintenance of centrifugal pump sets and motor including cost of rewinding of motor, material components & accessories required to repair pumpsets, starters etc. of electric panels, deinstallation and re installation of pumpsets complete in all respect for per Centrifugal pump set with pannel per month. maintenance of histroy sheet as directed by Engineer-in-charge for centrifugal pump set per month. Operated load of Centrifugal Pump sets (HP)
3.0 HP to 5.0 HP (1+1 standby)
6.0 HP to 12.5 HP (4+4 standby)
Maintenance of tubewells which includes round the clock monitoring of tubewells of all sizes, complete repairs / rewinding of submersible pump sets including cost of material components required to repair pumpsets, starters, meters etc. of electric panel of tube wells, Lowering and unlowering of pumpsets complete in all respect, maintenance of log-books & Histroy sheet as directed by Engineer-in-charge for tubewell per month.
6.0 HP to 7.5 HP( 5 Nos)
8.0 HP to 10.0 HP (2 Nos)
11.0 HP to 12.5 HP (2 Nos)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.67 MB
TDPDF94.pdf
Tender Documents • 0.58 MB
BOQ_934649.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid