Loading…
Loading…
Tender Value
₹47.7 L
EMD Value
₹95,500
Closing Date
21 Sept 2026, 6:00 pm
GE PANNGARH
GARRISON ENGINEER PANAGARH, MILITARY ENGINEER SERVICES, PO-PANAGARH, DISTT- BURDWAN, STATE-WEST BENGAL PIN-713420
All as per BOQ
2026_MES_787174_1
8500-686/E8
Open Tender
Civil Works
Works
180 days
PANNGARH
As per tender documents
6 documents required · 6 mandatory
₹500
SBI Panagarh
₹95,500
1 Sept 2026
1 Sept 2026
22 Sept 2026
1 Sept 2026
21 Sept 2026
15 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of Brick work or stone /boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stone work and precast concrete articles all as specified and as directed. | 160 | Cum | - | - |
| 2 | Demolition of cement concrete (unreinforced) in ground floors and pavings not exc 15 cm thickness (below or above ground level) complete all as specified. | 60 | Cum | - | - |
| 3 | Excavating in trenches , n.exc 1.5 m wide and n.exc 1.5 m depth for foundation etc or for shafts, wells, cesspits ,manhole pier hole, laying of cables, pipes etc n.exc 10 sqm on plan and n.exc 1.5m in depth and getting out in any kind of soil
Note : Manual excavation to be done. During excavation if any damage occured to existing cable any type/ water pipe line, it will be contractor responsibilty to get it repair and make functional by providing jointing kit etc without any extra cost. Contractor has to repair it within 24 hrs so that essential service can not be effected due to such damage.If contractor fails to repair it within 24 hrs penalty @ Rs 500/- will be charged to contractor. In this GE decision will be final, conclusive and binding. | 193.13 | Cum | - | - |
| 4 | M&L for pavings, with mix of fly ash, clinker & stone dust in the proportion of 1:3:6 (ie 10% fly ash, 30% clinker and 60% stone dust ) laying in layers n. exc 10cm thick, watering, ramming and compacted with hand/power roller 8 to 12 tonn roller to required camber and gradient complete all as directed by Engineer-in-Charge. | 150.9 | Cum | - | - |
| 5 | M&L for cement concrete 1:4:8, Type D2 (using 40 mm graded stone aggregate) as in mass concrete etc complete all as specified and directed. | 75.45 | Cum | - | - |
| 6 | M&L for cement concrete 1:3:6, Type C2 (using 40 mm graded stone aggregate) as in mass concrete etc complete all as specified and directed | 75.45 | Cum | - | - |
| 7 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm complete all as specified & directed | 8.24 | Cum | - | - |
| 8 | Removing excavated material (soil) n exc 50m and depositing where directed at a level n exc. 1.5 m above the starting point complete all as specified & directed | 184.89 | Cum | - | - |
| 9 | M&L for Brickwork with old size fly ash bricks, straight or curved on plan exc 6m mean radius, built in CM 1:4 with Old size bricks complete all as specified and directed. | 201.2 | Cum | - | - |
| 10 | M&L PCC 1:2:4 type B1 20mm graded agregate as in surface channel and drain etc complete all as specified and directed. | 30.18 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
PS686.pdf
Tender Documents • 0.93 MB
BOQ_882189.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .