Tender Value
₹10.0 L
EMD Value
₹99,891
Closing Date
12 May 2026, 3:00 pmClosed
CHIEF ENGINEER, KMC
Motijheel
Construction of Boundary wall back side of community Center at tiwaripur in ward -58 Under Zone-2
2025_NNKAN_1100068_3
584/AA-2/25-26
Open Tender
Civil Works
Fixed-rate
45 days
zone 2
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹99,891
24 Jul 2026
4 May 2026
12 May 2026
4 May 2026
12 May 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismenteling of Brick including stacking of dismentled material etc all complete work. | - | cum | 550 | - |
| 2 | Earth work in Excavation in trenches for foundations pipes Cables etc in ordinary soil (loan clay or sand) including lift up to 1.5 mtr lead up to 50 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in charge with in distance of 50 mtr. | - | Cum | 170 | - |
| 3 | Providing and laying Cement concrete (1:6:12,1 Cement:6 fine sand:12 Brick ballast nominal size 40mm) and curing complete, including cost of form work in foundation and floors. | - | Sqm | 4,380 | - |
| 4 | Class-150 Brick workin (1:4) cement mortar in Foundation & Plinth including supply of all Materials Labour and Tool & Plants etc, required for proper completion of the work. | - | cum | 6,600 | - |
| 5 | 230 mm thk Class-150 Brick work in (1:4) Cement mortar in Super structure including supply of all Materials Labour and Tool And Plants etc, required for proper. | - | cum | 7,500 | - |
| 6 | 12mm Thick Cement plaster1;4 in single coat on Both side of single or half brick wall for interior plasting upto flor two level including internal rounded angles chamfers and/or rounded angles not exceeding 80mm in girth and finishing even and smooth. | - | sqm | 200 | - |
| 7 | P/A wall Putty of 1mm thick including all work. | - | sqm | 135 | - |
| 8 | Finishing wall with water proofing cement paint of approved make and quality on new work with two coat to give an even shade. Including supply of all material, labour and Tand P etc. required for proper completion of the work. | - | sqm | 132 | - |
| 9 | RCC work with cement concrete 1:1.5:3, 1 Cement:1.5 Coarse sand: 3 stone Agregate including all completion of work for slab. | 1 | cum | 8,720 | ₹8,711.28 |
| 10 | Mild steel or Iron in Reinforcement including all completion of work. | 0.6 | Qtls | 7,200 | ₹4,320 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.42 MB
BOQ_2139499.xls
BOQ • 0.22 MB
12052026tn.pdf
Tender Documents • 13.86 MB
100stamp.pdf
Tender Documents • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .