Loading…
Loading…
Tender Value
₹34.6 L
EMD Value
₹69,120
Closing Date
18 Jun 2026, 6:00 pm
EE WR Division Bharatpur
EE WR Division Bharatpur
repair and rejuvanation of kherali Bundh
2026_WRDAS_565410_5
NIT 02/2026-27
Open Tender
Civil Works
182 days
under jurisdiction of EE Bharatpur Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
as per nit
₹69,120
Yes
6 Jun 2026
6 Jun 2026
19 Jun 2026
6 Jun 2026
18 Jun 2026
6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing, Fabrication, machining with straightening work of Guide Tee, Track, Sealing frame, Leaf frame or any part of gate s, complete as per drawing with testing, including cost of all materials, with machinery, labour, tools and tackles cutting, aligning, welding, finishing, cleaning etc., applying one coat of zinc rich epoxy primer and two coats of cold applied coal tar epoxy paint, etc., complete as per specifications and approved drawings with all lead and lifts, including packing & forwarding, transportation charges for structural steel components and other materials.Rate of work with all materials | 1,800 | kg | 127 | ₹2,28,600 |
| 2 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Ordinary | 1,34,112 | Sqm | 1.45 | ₹1,94,462.4 |
| 3 | Painting standard type gauge with black, red and white un-washable paints including cost of material | 5 | R.M. | 210 | ₹1,050 |
| 4 | Providing and laying cement concrete coping in (1:2:4) with maximum size of crusher broken aggregate upto 20 mm including shuttering etc. with all leads of material complete in all respect in thickness of: 75 mm | 15.75 | Sqm | 480 | ₹7,560 |
| 5 | Quarry rubish not more than 10 cm in size including all lead and lift. | 45 | Cum | 400 | ₹18,000 |
| 6 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Soft/Loose soil | 168.86 | Cum | 92 | ₹15,535.12 |
| 7 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor s density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.With initial lead of 250 m
Deduct in item no 16 (a) to (d) above if Standard Proctor s density to be achived is at least 90% | 14,676.12 | Cum | 109 | ₹15,99,697.08 |
| 8 | Compaction of earth or highly weathered strataBy manually or plain roller. (density 90% of Proctor) | 14,676.12 | Cum | 25 | ₹3,66,903 |
| 9 | Watering of earth including cost of carriage of water when source of water is up to 1 Km | 14,676.12 | Cum | 12.6 | ₹1,84,919.11 |
| 10 | Supplying stone, spall and laying R. R. stone pitching, hammer dressed with packing of voids from small stones including all lead & lifts, in required profile of 23 cm thickness ( 5 % thickness tolerance) | 69 | Cum | 1,820 | ₹1,25,580 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
BOQ_1006230.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid