Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.8 L+₹5,623 (3.14%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Techno commercial bid not submitted |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
25 Jan 2024, 4:30 pmClosed
GM(Civil)
CivilOfficeAGBPSNEEPCOLtd
Providing Fitting and Fixing of GI Pipe Railing around CW Sump Clarified Water Basin and Making Bridge over the Basin at Plant area of AGPBS
2024_NEEPC_180567_1
NIB NO 54 Dated 02/01/2024
Open Tender
Civil Works
Works
60 days
CivilOfficeAGBPSNEEPCOLtd
MentionedintheNIT
2 documents required · 2 mandatory
₹590
Yes
SBIAccount(AGBP)NEEPCOBokuloniChariali
₹4,000
Yes
20 Feb 2024
8 Jan 2024
27 Jan 2024
8 Jan 2024
25 Jan 2024
8 Jan 2024
8 Jan 2024 - 25 Jan 2024
Amount
Structural Steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Steel work welded in built up sections/ framed work, including cutting,hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (a) In stringers, treads, landings etc. of stair cases, including use of chequered plate wherever required, all complete
(b) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer.
Labour charge for structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position
Demolishing cement concrete manually / by mechnical means included disposal of material within 50 metres lead as per direction of Engineer-in-Charge. Nominal Concrete 1:3:6 or richer mix (i/c equivalent design mix).
Removing mortar from and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured): In cement mortar
20 mm cement plaster of mix 1:4 (1 cement : 4 fine sand)
SALIM AHMED
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .