| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.9 LAccepted-Finance | ₹13.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹13.9 L+₹417.98 (0.03%)Accepted-Finance 00 MEERANPUR SADARALI FAREEDPUR KALAN TANDA AMBEDKAR NAGAR UTTAR PRADESH 224145 | AMBEDKAR NAGAR | UTTAR PRADESH | 224145 | ₹13.9 L+₹417.98 (0.03%) | L2 | Accepted-Finance L2 |
| 3 | L3₹13.9 L+₹696.64 (0.05%)Accepted-Finance | ₹13.9 L+₹696.64 (0.05%) | L3 | Accepted-Finance L3 |
Tender Value
₹13.9 L
EMD Value
₹1.4 L
Closing Date
10 Aug 2026, 2:00 pmClosed
EXECUTIVE OFFICER NAGAR PANCHAYAT BARHAPUR BIJNOR
Executive officer nagar panchayat barhaur
01 nos jhanda 100 feet nirman bus stand barhapur
2026_DOLBU_1172039_1
364/npb/e tender/2026
Open Tender
Civil Works
Percentage
30 days
01 nos jhanda 100 feet nirman bus stand barhapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
Yes
EXECUTIVE OFFICER NAGAR PANCHAYAT BARHAPUR
₹1.4 L
Yes
8 Sept 2026
24 Jul 2026
10 Aug 2026
24 Jul 2026
10 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing & installation of Flag | |||||
| 1.01 | Earth work in excavation in ordinary soil including lift upto 1.5 M & lead upto 30 M including back filling watering and ramming of excavated earth.including supply of all material,labour and T&P etc.required for proper completion of work | 82.29 | Nos | 200 | ₹16,458 |
| 1.02 | Concrete in 1:4:8 with cement,fine sand and stone ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work. | 4.58 | Nos | 6,850 | ₹31,373 |
| 1.03 | Cement concrete with 4cm gague approved stone ballast coarse sand and cement in proporation of 4:2:1 but with 2cm gaguge stone gritt instead of 4cm gauge stone ballast inculding supply of all materials labour and T&P etc for proper completion of work. | 1.15 | Nos | 7,600 | ₹8,740 |
| 1.04 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in raft foundation i/c supply of all material,labour and T&P etc.including all complete of work | 5.4 | Nos | 7,665 | ₹41,391 |
| 1.05 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in plinth beam,tie beam i/c supply of all material,labour and T&P etc.including all complete of work | 0.9 | Nos | 8,445 | ₹7,600.5 |
| 1.06 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in Column i/c supply of all material,labour and T&P etc.including all complete of work | 6.3 | Nos | 8,460 | ₹53,298 |
| 1.07 | Mild steel or Iron work such as reinforced including supply of all material,labour and T&P etc.required for proper completion of work | 10.95 | Nos | 8,120 | ₹88,914 |
| 1.08 | M-150 brick work in 1:6 with (one cement and three fine sand of 1.25 F.M mortar) in foundation i/c cutting necessary and moulding of brick inculuding supply of all meterials,labour and T&P etc.reuired for proper complete of work. | 5.5 | Nos | 4,920 | ₹27,060 |
| 1.09 | M-150 brick work in 1:4 with (one cement and three coarse sand of 1.25 F.M mortar) in superstructure i/c cutting necessary and moulding of brick inculuding supply of all meterials,labour and T&P etc.reuired for proper complete of work. | 3.44 | Nos | 5,480 | ₹18,851.2 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
BOQ_2200943.xls
BOQ • 0.28 MB
corigendumjhandapdf.pdf
PDF • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .