Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.5 LAccepted-AOC AT ROAD MES TINALI PO CHABUA DISTT DIBRUGARH ASSAM 84 | CHABUA | DIBRUGARH | ASSAM | 786102 | L1 | Accepted-AOC Accepted being L1 | |
| 2 | L2₹47.2 L+₹2.8 L (6.25%)Rejected-Finance | L2 | Rejected-Finance Rejected being L2 | |
| 3 | L3₹47.5 L+₹3.0 L (6.83%)Rejected-Finance HARIGAON PO NIKAMUL SATRA DIST SONITPUR ASSAM PIN 784001 | SONITPUR | ASSAM | 784001 | L3 | Rejected-Finance Rejected being L3 | |
| 4 | L4₹48.6 L+₹4.2 L (9.38%)Rejected-Finance | L4 | Rejected-Finance Rejected being L4 | |
| 5 | L5₹48.7 L+₹4.3 L (9.63%)Rejected-Finance | L5 | Rejected-Finance Rejected being L5 |
| Sl No | Description | Qty | Unit | J D construction L6 | M/S P R SINGH AND SONS L4 | Markson L3 | M/s Dhani Enterprise L8 | M/S R G Construction L1 | PURBANCHAL BUILDERS L7 | M/s Dhruv Enterprises L2 | M/s Nice Traders L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Surface dressing n exc 15 cm deep in soft and loose soil complete all as specified and directed | 300 | Sqm | 66 ₹19,800 | 63 ₹18,900 | 65 ₹19,500 | 62 ₹18,600 | 55 ₹16,500 Lowest | 69 ₹20,700 | 65 ₹19,500 | 65 ₹19,500 |
| 2.00 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in soft & loose soil as specified and as directed. | 60 | Cum | 425 ₹25,500 | 360 ₹21,600 | 420 ₹25,200 | 330 ₹19,800 | 280 ₹16,800 Lowest | 319 ₹19,140 | 320 ₹19,200 | 340 ₹20,400 |
| 3.00 | All as per item No 2 (here in before) but each additional 1.5 m or part thereof in depth beyond the first 1.5 m as complete all specified and as directed | 20 | Cum | 385 ₹7,700 | 435 ₹8,700 | 380 ₹7,600 | 425 ₹8,500 | 350 ₹7,000 Lowest | 379 ₹7,580 | 420 ₹8,400 | 430 ₹8,600 |
| 4.00 | M & L Cement concrete in foundations, filling and mass concrete D- 2, 1:4:8 (40mm graded stone aggregate) complete all specified and as directed | 10 | Cum | 7,460 ₹74,600 | 7,500 ₹75,000 | 7,450 ₹74,500 | 7,200 ₹72,000 | 7,200 ₹72,000 | 6,989 ₹69,890 Lowest | 7,200 ₹72,000 | 7,400 ₹74,000 |
| 5.00 | M & L for Sand filling under floors or in foundations including watering and consolidation depositing where directed complete all as specified & directed | 200 | Cum | 1,550 ₹3,10,000 | 1,750 ₹3,50,000 | 1,450 ₹2,90,000 | 1,480 ₹2,96,000 | 1,350 ₹2,70,000 Lowest | 1,419 ₹2,83,800 | 1,650 ₹3,30,000 | 1,850 ₹3,70,000 |
| 6.00 | M&L for RCC M-25 (Design Mix) using 20mm graded stone aggregate as in Foundations, including rafts, footing foundation beams plinth beams. bases for columns, basement slabs, under reamed piles and mass concrete complete all as specified and as directed. | 28 | Cum | 10,880 ₹3,04,640 | 10,800 ₹3,02,400 | 10,800 ₹3,02,400 | 10,600 ₹2,96,800 | 11,500 ₹3,22,000 | 10,389 ₹2,90,892 Lowest | 10,600 ₹2,96,800 | 10,650 ₹2,98,200 |
| 7.00 | M&L for RCC M-25 (Desgin Mix) using 20mm graded stone aggregate as Columns, pillars, piers, posts and struts complete all as specified and as directed. | 10 | Cum | 10,980 ₹1,09,800 | 11,200 ₹1,12,000 | 10,950 ₹1,09,500 | 10,800 ₹1,08,000 | 11,800 ₹1,18,000 | 10,599 ₹1,05,990 Lowest | 10,800 ₹1,08,000 | 10,850 ₹1,08,500 |
| 8.00 | M & L for RCC M-25 using 20 mm graded aggregates as in Beams, cantilevers, bressummers, lintels over 1.5m span complete all as specified and as directed. | 8 | Cum | 11,650 ₹93,200 | 11,580 ₹92,640 | 11,600 ₹92,800 | 11,500 ₹92,000 | 12,000 ₹96,000 | 10,999 ₹87,992 Lowest | 11,500 ₹92,000 | 11,550 ₹92,400 |
| 9.00 | M & L for RCC M-25 using 20 mm graded aggregates as in Chajjas complete all as specified and as directed. | 0.5 | Cum | 11,650 ₹5,825 | 11,580 ₹5,790 | 11,600 ₹5,800 | 11,500 ₹5,750 | 12,500 ₹6,250 | 10,999 ₹5,499.5 Lowest | 11,500 ₹5,750 | 11,550 ₹5,775 |
| 10.00 | Formwork to sides of concrete foundations, footings, bases of columns, raft beams, sides and soffits if any of foundation and plinth beams and similar works vertical or to batter of flat rough finished complete all as specified and directed. | 90 | Sqm | 580 ₹52,200 | 660 ₹59,400 | 560 ₹50,400 | 550 ₹49,500 | 480 ₹43,200 Lowest | 559 ₹50,310 | 650 ₹58,500 | 660 ₹59,400 |
Tender Value
₹44 L
EMD Value
₹88,000
Closing Date
11 Sept 2025, 6:00 pmClosed
GE (AF) CHABUA
GE (AF) CHABUA, POST-CHABUA AIR FIELD, DIST-DIBRUGARH, ASSAM-786102
PROVN OF RCC PARKING SHED FOR QTY 02 LSV MCT AND QTY 01 ECGNSS VEHICLES AT AIR FORCE STATION CHABUA
2025_MES_727032_1
735
Open Tender
Civil Works
Item Rate
180 days
GE (AF) CHABUA, POST-CHABUA AIR FIELD, DIST-DIBRUG
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
GE (AF) CHABUA
₹88,000
Yes
19 Nov 2025
21 Aug 2025
13 Sept 2025
21 Aug 2025
11 Sept 2025
4 Sept 2025
21 Aug 2025 - 28 Aug 2025
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .