Construction of road Culvert from Sankarma railway fatak to Jayanagar road,ward no-28 under SMC Sambalpur
2026_ORULB_140994_8
28/SMC_SBP/2026-27
Open Tender
Civil Works - Others
Percentage
SAMBALPUR MUNICIPAL CORPORATION
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹23,719
Yes
18 Sept 2026
18 Sept 2026
29 Sept 2026
18 Sept 2026
28 Sept 2026
18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50m. | 2.3 | cum | 877.2 | ₹2,017.56 |
| 2 | Removal of excavated dismantled materials away from work site by mechanical means within 5km lead including loading unloading etc complete. | 2.3 | cum | 320.6 | ₹737.38 |
| 3 | Earthwork in excavation of foundation in hard or gravelly soil with initial lead & lift including rough dressing & levelling the bed etc. complete. | 242 | cum | 235.7 | ₹57,039.4 |
| 4 | Supplying , filling Sand in F & P including cost, Conveyance & royalty of sand, cost of all labour, T & P, labour cess, watering, ramming etc. complete. | 20.3 | cum | 857.3 | ₹17,403.19 |
| 5 | Providing, spreading Quarry Rubbish in Sub-Base in layers not exceeding 22.5cm. including watering ,compacting to the required density in O.M.C. with rolling by Vibratory Roller as per O.P.W.D. specifications including cost, conveyance & royalty of all materials,cost of all labour, T & P, labour cess, watering, turfedging, hire & running charges of Vibratory Roller etc. complete. | 84.6 | cum | 1,660.72 | ₹1,40,496.91 |
| 6 | Cement Concrete (1:4:8) using 4cm size B.H.G. (C. B.) Metal including cost, conveyance , royalty & taxes of all materials etc. complete | 104.9 | cum | 5,626.3 | ₹5,90,198.87 |
| 7 | Rigid & smooth centering & shuttring for RCC works including false work & dismentling them after casting including cost of materials complete | 663.2 | cum | 249.8 | ₹1,65,667.36 |
| 8 | Supplying fitting fixing and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification | 35.25 | cum | 9,534.7 | ₹3,36,108.93 |
| 9 | C.C. M20 grade using 20mm and down graded size chips including cost conveyance etc. complete | 91.2 | cum | 5,665.2 | ₹5,16,666.24 |
| 10 | Cement concrete (1:2:4) using 12mm. size c.b.b.h.g chips including cost of all materials etc. complete. | 4.1 | cum | 7,479.9 | ₹30,667.59 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_609907.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .