| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹135.0 CrAccepted-AOC 507 BHIKAJI CAMA BHAWAN BHIKAJI CAMA PLACE NA NEW DELHI SOUTH WEST DELHI 110066 DELHI INDIA | NEW DELHI | SOUTH WEST DELHI | DELHI | 110066 | ₹135.0 Cr | L1 | Accepted-AOC Accepted due to L1 bidder |
| 2 | L2₹169.4 Cr+₹34.5 Cr (25.5%)Rejected-Finance | ₹169.4 Cr+₹34.5 Cr (25.5%) | L2 | Rejected-Finance Not a lowest bidder |
| 3 | L3₹200.2 Cr+₹65.2 Cr (48.3%)Rejected-Finance | ₹200.2 Cr+₹65.2 Cr (48.3%) | L3 | Rejected-Finance Not a lowest bidder |
| Sl No | Description | Qty | Unit | BEUMER INDIA PRIVATE LIMITED L2 | Siemens Postal, Parcel and Airport Logistics Private Limited L3 | Alstef India Private Limited L1 |
|---|---|---|---|---|---|---|
| 1.00 | Design, Supply, Installation, Testing and Commissioning (DSITC) of a complete, fully integrated and intelligent In-Line Baggage Handling System (BHS) including associated SCADA, Monitoring, Control System, necessary sensors, cabling, networking, integration with Airport Systems, and related civil/mechanical/electrical works at Bagdogra Airport with a peak hour passenger capacity (PHP) of 3000 (1500 Departure+ 1500 Arrival) passengers.
The system shall be designed in accordance with latest ICAO/BCAS norms, IATA Resolution 753, ECAC Standard 3 for Explosive Detection, DBR, Technical Specifications and shall consist of, but not limited to the following key components:
Check-in & Induction:
i. 02 Nos. Check-in Islands comprises with 24 Nos. Check-in Counters per island (Total: 48 counters). Future provision of minimum 12 check in counters in each. Integration of 08 nos. SBD's (taken up in NITB work) with passenger check-in system.
ii. Integrated with automated conveyor feed and Bag Tag Reader (BTR)
iii. 04 Nos. Maintenance-Free S-Lifts for vertical transfer of bags between levels.
iv. 03 Nos. CT-EDS machines conforming to ECAC Standard 3 for Level 1 and Level 2 automatic baggage screening. Complete Level 1 & 2 screening system with auto-divert and reject capability. Integration with BHS | 1 | Job | 96,82,90,773 ₹96,82,90,773 | 99,24,40,412 ₹99,24,40,412 | 79,22,11,556 ₹79,22,11,556 Lowest |
| 1.01PLC/SCADA for real-time threat management: v. Level 3 Screening: 2 Nos. provision for remote operator workstations vi. Manual Encode Stations with Workstationsvii. Control & Monitoring System: Central SCADA-based control system with redundancy, PLC Panels with IP-rated enclosures, Alarm & Fault Monitoring System, Interfaces with FIDS, AODB, BMS and BRS (Barcode and RFID)viii. Energy Efficiency: Energy-efficient motors, VFDs, photo sensors, Low-friction and low-noise rollers and belts Automatic stand-by mode for idle sections.ix. O&M and AICMC Provisions: 15 Years Operation & 13-year Comprehensive Maintenance Contract (AICMC) post completion after DLP of 2 year.x. Training to AAI O&M staff.xi. Provision of spares and consumables as per OEM standards.xii. All associated structural supports, cable trays, ducts, earthing, power distribution. lighting for maintenance areas, communication & data cablingxiii. Integration with fire alarm/suppression system in coordination with the Airport fire detection systemxiv. Safety systems including Emergency Stop Buttons, Overload Protection and Safe Access Platform etc as req. | ||||||
| 2.00Annual Operation OPERATION : Operation of complete Baggage Handling System (excluding CT-EDS, XBIS, ETD, etc.) by providing requisite man-power, tools, equipments, consumables, technical support and clearing bag jams during operations for BHS as Specified in Tender Specifications. | ||||||
| 2.01 | Year 1 (during DLP) | 1 | Per Year | 2,61,43,350 ₹2,39,83,909.29 | 56,84,064 ₹52,14,560.31 Lowest | 88,37,340 ₹81,07,375.72 |
| 2.02 | Year 2 (during DLP) | 1 | Per Year | 2,71,38,806 ₹2,28,42,733.01 | 60,81,949 ₹51,19,176.47 Lowest | 90,55,830 ₹76,22,292.11 |
| 2.03 | Year 3 (1st Year after DLP) | 1 | Per Year | 1,03,16,152 ₹79,66,132.57 | 65,07,685 ₹50,25,234.36 Lowest | 83,80,030 ₹64,71,059.17 |
| 2.04 | Year 4 (2nd Year after DLP) | 1 | Per Year | 1,10,68,250 ₹78,40,748.3 | 69,63,223 ₹49,32,747.17 Lowest | 89,24,690 ₹63,22,250.4 |
| 2.05 | Year 5 (3rd Year after DLP) | 1 | Per Year | 1,20,34,239 ₹78,21,051.93 | 74,50,649 ₹48,42,176.79 Lowest | 91,64,730 ₹59,56,158.03 |
| 2.06 | Year 6 (4th Year after DLP) | 1 | Per Year | 1,29,08,224 ₹76,97,173.97 | 79,72,194 ₹47,53,819.28 Lowest | 99,32,180 ₹59,22,558.93 |
| 2.07 | Year 7 (5th Year after DLP) | 1 | Per Year | 1,41,60,719 ₹77,45,913.29 | 85,30,248 ₹46,66,045.66 Lowest | 1,06,16,030 ₹58,06,968.41 |
Tender Value
₹251.0 Cr
EMD Value
₹7.5 Cr
Closing Date
25 Nov 2025, 6:00 pmClosed
AGM (Engg -E), CHQ-ER
Airports Authority of India O/o ED Engg.,ER, CHQ, Old R.D. Building, Safdarjung Airport, New Delhi- 110003
Development of New Civil Enclave at Bagdogra Airport. Sub-Head Provision of Inline Baggage Handling System along with CT-EDS including Operations and AICMC
2025_AAI_239505_1
AAI/CHQ/ER/BGDGR/BHS/2025
Open Tender
Electrical Works
EPC Contract
330 days
Bagdogra
Please refer Tender documents.
34 documents required · 34 mandatory
₹11,800
₹7.5 Cr
ED Engg.,ER, CHQ
18 Aug 2026
10 Oct 2025
4 Dec 2025
10 Oct 2025
25 Nov 2025
10 Oct 2025
10 Oct 2025 - 10 Nov 2025
23 Oct 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Design, Supply, Installation, Testing and Commissioning (DSITC) of a complete, fully integrated and intelligent In-Line Baggage Handling System (BHS) including associated SCADA, Monitoring, Control System, necessary sensors, cabling, networking, integration with Airport Systems, and related civil/mechanical/electrical works at Bagdogra Airport with a peak hour passenger capacity (PHP) of 3000 (1500 Departure+ 1500 Arrival) passengers.
The system shall be designed in accordance with latest ICAO/BCAS norms, IATA Resolution 753, ECAC Standard 3 for Explosive Detection, DBR, Technical Specifications and shall consist of, but not limited to the following key components:
Check-in & Induction:
i. 02 Nos. Check-in Islands comprises with 24 Nos. Check-in Counters per island (Total: 48 counters). Future provision of minimum 12 check in counters in each. Integration of 08 nos. SBD's (taken up in NITB work) with passenger check-in system.
ii. Integrated with automated conveyor feed and Bag Tag Reader (BTR)
iii. 04 Nos. Maintenance-Free S-Lifts for vertical transfer of bags between levels.
iv. 03 Nos. CT-EDS machines conforming to ECAC Standard 3 for Level 1 and Level 2 automatic baggage screening. Complete Level 1 & 2 screening system with auto-divert and reject capability. Integration with BHS | 1 | Job | - | - |
| 1.01 | PLC/SCADA for real-time threat management:
v. Level 3 Screening: 2 Nos. provision for remote operator workstations vi. Manual Encode Stations with Workstationsvii. Control & Monitoring System: Central SCADA-based control system with redundancy, PLC Panels with IP-rated enclosures, Alarm & Fault Monitoring System, Interfaces with FIDS, AODB, BMS and BRS (Barcode and RFID)viii. Energy Efficiency: Energy-efficient motors, VFDs, photo sensors, Low-friction and low-noise rollers and belts Automatic stand-by mode for idle sections.ix. O&M and AICMC Provisions: 15 Years Operation & 13-year Comprehensive Maintenance Contract (AICMC) post completion after DLP of 2 year.x. Training to AAI O&M staff.xi. Provision of spares and consumables as per OEM standards.xii. All associated structural supports, cable trays, ducts, earthing, power distribution. lighting for maintenance areas, communication & data cablingxiii. Integration with fire alarm/suppression system in coordination with the Airport fire detection systemxiv. Safety systems including Emergency Stop Buttons, Overload Protection and Safe Access Platform etc as req. | - | - | - | - |
| 2Annual Operation OPERATION : Operation of complete Baggage Handling System (excluding CT-EDS, XBIS, ETD, etc.) by providing requisite man-power, tools, equipments, consumables, technical support and clearing bag jams during operations for BHS as Specified in Tender Specifications. | |||||
| 2.01 | Year 1 (during DLP) | 1 | Per Year | - | - |
| 2.02 | Year 2 (during DLP) | 1 | Per Year | - | - |
| 2.03 | Year 3 (1st Year after DLP) | 1 | Per Year | - | - |
| 2.04 | Year 4 (2nd Year after DLP) | 1 | Per Year | - | - |
| 2.05 | Year 5 (3rd Year after DLP) | 1 | Per Year | - | - |
| 2.06 | Year 6 (4th Year after DLP) | 1 | Per Year | - | - |
| 2.07 | Year 7 (5th Year after DLP) | 1 | Per Year | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.43 MB
tenderdocument.pdf
Tender Documents • 31.27 MB
BOQ_289149.xls
BOQ • 0.34 MB
Corrigendum-I.pdf
PDF • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .