Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC BANKOLA AREA BANKOLA AREA OFFICE P O UKHRA DIST PASCHIM BARDHAMAN WEST BENGAL INDIA 713363 | UKHRA | PASCHIM BARDHAMAN | WEST BENGAL | 713363 | L1 | Accepted-AOC AS PER TCR | |
| 2 | L2₹5.5 L+₹26,285 (5.00%)Rejected-Finance PANDABESWAR PASCHIM BURDWAN 713346 | PANDABESWAR | PASCHIM BURDWAN | WEST BENGAL | 713346 | L2 | Rejected-Finance AS PER TCR |
Tender Value
₹5.3 L
EMD Value
₹6,600
Closing Date
4 Jun 2022, 6:50 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GM, BANKOLA AREA
OFFICE OF THE GM, BANKOLA AREA, UKHRA, PIN-713363
Installation of HT Pump motor set along with delivery pipe line at RVII seam of Pit No..3 at Shyamsundarpur Colliery under Bankola Area
2022_ECL_244438_1
ECL/GM/BA/E TENDER/22-23/Enm/21 19.05.2022
Open Tender
Electrical and Maintenance Works
Item Rate
60 days
BANKOLA
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,600
9 Dec 2022
20 May 2022
6 Jun 2022
20 May 2022
4 Jun 2022
21 May 2022
20 May 2022 - 24 May 2022
Amount
Item Description/ Heading
Dismantling of 6" dia Ms pipe range from surface field of sarpi unit 70 nos
carrying of 6" dia Ms pipes from sarpi unit to Sspur colliery 3 no pit
Lowering of 6" dia MS pipes through 3 no pit
Transportation drom 3 no pit bottom to 13L/18D via haulage and then up to 16L/16D on shoulder
Laying and fitting of 6" dia MS pipes with rubber washer (from 16D to 12 D along 16L)
Collection of trolleys from CM Section and lifting to surface and loading of HT pump HT motor base plate HT starter NRV , Cable (70sqmm X 150Mtr) sluice valve , foot valve on trolley
Transportation & lowering of HT motor , base plate HT starter , NRV , cable (70 sqmm X 150 Mtr ) , sluice valve , foot valve from surface workshop to 3 no pit bottom (In order to lower the HT motor the cage s to dismentled and again fit it after lowering )
Transportation of all above from pit bottom to 13L/3ED by haulage over trackline and then from 13L/3ED to 13L/16D by pulling manually over trackline
Transportation of all above material from 13L/16D to 16L/16D by manually pulling over floor and laying of cable
Assembling of HT pump and motor overbase plate along ewith alignment and connection of suction and delivery line for necessary installation
Total impact of GST for the purpose of CTC
PRASHANTA KABIRAJ
stage.html
html • 0.04 MB
techsummary_252504.pdf
PDF • 1.40 MB
finsummary_252504.pdf
PDF • 1.40 MB
21.pdf
PDF • 1.40 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .