Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.0 LAccepted-Finance | L1 | Accepted-Finance Low | |
| 2 | L2₹49.9 L+₹94,144.52 (1.92%)Accepted-Finance | L2 | Accepted-Finance High |
| Sl No | Description | Qty | Unit | E.SEKAR L2 | S.GOPALAKRISHNAN L1 |
|---|---|---|---|---|---|
| 1.00Part I : Providing Cement Concrete pavement to Krishnaveniyammal Cross Street at Ayyapanthangal Panchayat Estimate Amount : 8.17 Lakhs | |||||
| 2.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 70 | Cum | 2,600 ₹1,82,000 | 2,520 ₹1,76,400 Lowest |
| 3.00 | Supply & Erecting centring for Sides & Soffits of CC Works Including cost & conveyance of all Materials and all Labour charges | 30 | Sqm | 545 ₹16,350 Lowest | 545 ₹16,350 Lowest |
| 4.00 | Plain Cement Concrete in 1:1.5:3 Mix using 20mm IS HBG Metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum | 60 | Cum | 7,950 ₹4,77,000 | 7,820 ₹4,69,200 Lowest |
| 5.00 | Supply & Fixing of Bitumen pad in CC Pavement Including cost & conveyance of all Materials and all Labour charges, etc complete | 12 | Sqm | 234 ₹2,808 Lowest | 234 ₹2,808 Lowest |
| 6.00 | Supply & Filling of Good Gritty Gravel from Approved Quarry & Laid in Layers including cost of Materials & all labour charge etc.,complete | 12.24 | Cum | 810 ₹9,914.4 Lowest | 810 ₹9,914.4 Lowest |
| 7.00 | Supply & Filling of 200mm Dia PVC Pipes 6.00 Kg per sq.cm in Road for Cross Drain including cost of Materials & all labour charge etc.,complete | 12 | Rm | 690 ₹8,280 Lowest | 690 ₹8,280 Lowest |
| 8.00Part II : Providing Additional Wall height CC Drain With Cover Slab in Ashok Brindavanam to Subbiah Nagar Road at Ayyapanthangal Panchayat Estimate Amount : 3.57 Lakhs | |||||
| 9.00 | Supply & Erecting centring for Sides & Soffits of CC Works Including cost & conveyance of all Materials and all Labour charges | 138 | Sqm | 590 ₹81,420 | 547 ₹75,486 Lowest |
| 10.00 | Plain Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. | 9.92 | Cum | 7,190 ₹71,324.8 Lowest | 7,190 ₹71,324.8 Lowest |
Tender Value
₹49.7 L
Closing Date
15 Sept 2025, 3:00 pmClosed
BDO BP
KNR Union at padappai
Providing Cement Concrete Pavement to Krishnaveniammal Nagar cross Street , Subbiah Nagar III Street at Ayyapanthangal Panchayat , Providing Additional Wall Height CC Drain with Cover Slab in Ashok Brindavanam to Subbiah Nagar at Ayyapanthangal Panc
2025_RDTN_601774_1
DRDAKPM PACKAGE No. 5 - No.186 / 2025 / A9 / KNR / Dated 01.09.2025
Open Tender
Civil Works - Roads
Works
120 days
Ayyapanthangal
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
16 Sept 2025
9 Sept 2025
15 Sept 2025
9 Sept 2025
15 Sept 2025
9 Sept 2025
Amount
Part I : Providing Cement Concrete pavement to Krishnaveniyammal Cross Street at Ayyapanthangal Panchayat Estimate Amount : 8.17 Lakhs
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Supply & Erecting centring for Sides & Soffits of CC Works Including cost & conveyance of all Materials and all Labour charges
Plain Cement Concrete in 1:1.5:3 Mix using 20mm IS HBG Metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Supply & Fixing of Bitumen pad in CC Pavement Including cost & conveyance of all Materials and all Labour charges, etc complete
Supply & Filling of Good Gritty Gravel from Approved Quarry & Laid in Layers including cost of Materials & all labour charge etc.,complete
Supply & Filling of 200mm Dia PVC Pipes 6.00 Kg per sq.cm in Road for Cross Drain including cost of Materials & all labour charge etc.,complete
Part II : Providing Additional Wall height CC Drain With Cover Slab in Ashok Brindavanam to Subbiah Nagar Road at Ayyapanthangal Panchayat Estimate Amount : 3.57 Lakhs
Supply & Erecting centring for Sides & Soffits of CC Works Including cost & conveyance of all Materials and all Labour charges
Plain Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete
Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc.
Provision for Manhole Cover SFRC including cost of Materials & all labour charge etc.,complete
Part III : Providing Cement Concrete pavement to Subbiah Nagar III Street at Ayyapanthangal Panchayat Estimate Amount : 9.54 Lakhs
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Supply & Erecting centring for Sides & Soffits of CC Works Including cost & conveyance of all Materials and all Labour charges
Plain Cement Concrete in 1:1.5:3 Mix using 20mm IS HBG Metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Supply & Fixing of Bitumen pad in CC Pavement Including cost & conveyance of all Materials and all Labour charges, etc complete
Supply & Filling of Good Gritty Gravel from Approved Quarry & Laid in Layers including cost of Materials & all labour charge etc.,complete
Supply & Filling of 200mm Dia PVC Pipes 6.00 Kg per sq.cm in Road for Cross Drain including cost of Materials & all labour charge etc.,complete
Part IV : Providing Storm Water Drainage in Periyakoluthavancheri Theruveethiyamman Koil Street at Ayyapanthangal Panchayat Estimate Amount : 13.62 Lakhs
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications
Plain Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supply & Erecting centring for Sides & Soffits of CC Works Including cost & conveyance of all Materials and all Labour charges
Plain Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Plastering with CEMENT MORTAR 1:5 (one cement and Five sand) 20 mm. thick in all floor including curing etc.Complete complying with standard specification.
Part V : Providing Storm Water Drain with Additional Wall height & RCC Cover Slab in SRMC Police Station Road at Ayyapanthangal Panchayat Estimate Amount : 2.64 Lakhs
Supply & Erecting centring for Sides & Soffits of CC Works Including cost & conveyance of all Materials and all Labour charges
Plain Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete
Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc.
Provision for Manhole Cover SFRC including cost of Materials & all labour charge etc.,complete
Part VI : Construction of 3.00 m Span RCC Slab Culvert (7.00m Length) in Ramaiyah Nagar Street at Ayyapanthangal Panchayat Estimate Amount : 12.13 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and erecting centering for sides and soffits including necessary supports and strutting for plain surfaces Upto GL
Supplying and erecting centering for sides and soffits including necessary supports and strutting for plain surfaces Above GL
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall & Deck slab
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
E.SEKAR (BID ID -1458048)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_719384.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .