Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.5 CrAccepted-AOC | ₹2.5 Cr | L-1 | Accepted-AOC Agreement done By Contractor |
Tender Value
₹3.0 Cr
EMD Value
₹3.0 L
Closing Date
26 Mar 2026, 5:30 pmClosed
Executive Engineer PWD (Maint.) Division No. 2 Bho
Executive Engineer PWD (Maint.) Division No. 2 Bho
Construction of Road from Dolatpur Kerwa Dam Approach Road Length 0.80 Km. and Construction Of Road From Paved Shoulder From Holi Cross School to Kerwa Dam Road Ch 0 to 900 Length 0.90 Km. and Construction Of Road From Paved Shoulder From Holi
2026_PWDRB_488623_1
39 of 2025-26 dt. 09/03/2026/3
Open Tender
Civil Works - Roads
240 days
Bhopal
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
₹3.0 L
O/O C.E (Capital Zone) PWD Nirman Bhawan Bhopal
30 Jun 2026
11 Mar 2026
30 Mar 2026
11 Mar 2026
26 Mar 2026
11 Mar 2026
18 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Construction of Road from Dolatpur Kerwa Dam Approach Road Length 0.80 Km. and Construction Of Road From Paved Shoulder From Holi Cross School to Kerwa Dam Road Ch 0 to 900 Length 0.90 Km. and Construction Of Road From Paved Shoulder From Holi Cross School to Kerwa Dam Road Ch 900 to 1800 Length 0.90 Km. .2nd Call P.A.C. 144.88 Lakh,as per Road & Bridge SOR wef 11-04-2025 Schedule Attached Complition period 240 Days | - | Nos | 2,95,21,000 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_576628.xls
BOQ • 0.28 MB
Document.pdf
Tender Documents • 21.67 MB
Download all tender documents and submit your bid