| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 CrAccepted-Finance | ₹8.1 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹8.2 Cr+₹14.1 L (1.74%)Rejected-Finance | ₹8.2 Cr+₹14.1 L (1.74%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
Tender Value
₹9.5 Cr
EMD Value
₹19.0 L
Closing Date
15 Mar 2024, 1:00 pmClosed
Project Officer CAD Samba HQ Jammu Talab Tillo
Project Officer CAD Samba HQ Jammu Talab Tillo
Construction of Field Channel on MRC
2024_APD_245539_1
e-nit no.28 of 2023-24 dt.21-02-24
Open Tender
Civil Works - Others
Item Rate
365 days
Villages in Kathua district
Please refer Tender documents.
9 documents required · 9 mandatory
₹6,000
Project Officer CAD Samba HQ Jammu Talab Tillo
₹19.0 L
3 May 2024
22 Feb 2024
16 Mar 2024
22 Feb 2024
15 Mar 2024
22 Feb 2024
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth 1 mtr from cutting edge.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 30 % boulders
Dumping/ Hand Packing of stones (30%) in plum including the cost of Stone boulder (nallah) in Horizontal on level
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete.( 40mm thick with 20 mm nominal size stone aggregate.)
Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
M/S JAVED IQBAL WANI
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .