| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹2.1 Cr+₹31.2 L (17.5%)Accepted-Finance | ₹2.1 Cr+₹31.2 L (17.5%) | L2 | Accepted-Finance lottery winner |
| 2 | L1₹1.8 CrRejected-Finance AT WORD NO 4 PO PS RAGHUNATHPALI DIST SUNDARGARH 769004 | SUNDARGARH | ODISHA | 769004 | ₹1.8 Cr | L1 | Rejected-Finance withdraw after L1 |
| 3 | L2₹2.1 Cr+₹31.2 L (17.5%)Rejected-Finance | ₹2.1 Cr+₹31.2 L (17.5%) | L2 | Rejected-Finance lost in lottery |
| 4 | L2₹2.1 Cr+₹31.2 L (17.5%)Rejected-Finance GUDVELA | ₹2.1 Cr+₹31.2 L (17.5%) | L2 | Rejected-Finance lost in lottery |
| 5 | L2₹2.1 Cr+₹31.2 L (17.5%)Rejected-Finance AGALPUR BLOCK IN THE DISTRICT OF BALANGIR | ₹2.1 Cr+₹31.2 L (17.5%) | L2 | Rejected-Finance lost in lottery |
Tender Value
₹2.1 Cr
EMD Value
₹2.1 L
Closing Date
11 May 2026, 5:30 pmClosed
CCE,LSP
Office of the CCE,LSP,Balangir
Construction of Cement Concrete approach road from SH-42 to RR Colony Hardatal of LSIP, Balangir.
2026_CEEBO_128387_1
04/2023-24of CCE,LSP, Balangir.
Open Tender
Civil Works - Roads
Percentage
122 days
hardatal
Tender Cost, EMD,PAN,valid RC, valid GSTIN, Affidavit, No relation certificate, undertaking and any other document as per DTCN.
3 documents required · 3 mandatory
₹10,000
₹2.1 L
Yes
Office of the CCE,LSP,Balangir
9 Jul 2026
27 Apr 2026
12 May 2026
27 Apr 2026
11 May 2026
27 Apr 2026
27 Apr 2026 - 6 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil including stoney earth, gravle, moroom etc. interspread with boulders upto 1/2 cum size with all leads lifts and delifts including dressing, levelling the bed and depositing the excavated materials away from the work site including T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 1,854.68 | Cum | 86.6 | ₹1,60,615.29 |
| 2 | Filling foundation and plinth with sand of approved quality,watered and rammed including cost & conveyance of all materials, royalty of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 634.95 | cum | 535 | ₹3,39,698.25 |
| 3 | Back filling of excavated earth in foundation and plinth including T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 309.83 | Cum | 57.73 | ₹17,886.49 |
| 4 | Cement Concrete M15 with 40 mm hard granite crusher broken aggregates metal per 1 cum free from weathered skin surface, dust and any other deleterious materials including rigid smooth centering machine mixing, watering, compacting with vibrators, hoisting and laying in position for a finished smooth surface and curing with all leads, lifts and delifts, hire and running charges of machineries construction including cost & conveyance of all materials, royalty of materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge.(ground floor) | 2,771.97 | cum | 4,848.4 | ₹1,34,39,619.35 |
| 5 | RCC M20 with HG (CB) 20 mm size aggregates metal per 1 cum free from weathered skin surface, dust and any other deleterious materials including rigid smooth centering machine mixing, watering, compacting with vibrators, hoisting and laying in position for a finished smooth surface and curing with all leads, lifts and delifts, hire and running charges of machineries construction including cost & conveyance of all materials, royalty of materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 903.26 | cum | 5,572.1 | ₹50,33,055.05 |
| 6 | Rigid smooth centering and shuttering for R.C.C works including false works and dismentalling there after casting including cost, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. (a) Foundation & Plinth. | 4,035.01 | sqm | 249.1 | ₹10,05,120.99 |
| 7 | Supply, fitting, fixing, straightening, bending, binding and placing in position of uncoated HYSD bar reinforcement complete including cost & conveyance of all materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 96.38 | qntl | 9,316.8 | ₹8,97,953.18 |
| 8 | Provision of weep hole in brick masonry /plain/Rinforcement concrete abutment wing wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 2 H towards face including cost of all materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 200.4 | Rmt | 109 | ₹21,843.6 |
| 9 | Filling bitumen and cement and juit fibre in expansion joints inclusive of cost of materials and cement mortar (3:1) including cleanong before pouring 12 mm to 25 mm and 15 cm depath including cost & conveyance of all materials, royalty of materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge | 1,132 | Rmt | 14.25 | ₹16,131 |
stage.html
html • 0.40 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
DTCN.pdf
Tender Documents • 0.53 MB
BOQ_588524.xls
BOQ • 0.36 MB
DTCN1.pdf
PDF • 2.17 MB
NIT.rar
PDF • 0.68 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .