Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC 2 138 MUTHALIYAR STREET VADAKKUPATTU AMODR TIRUVALLUR | TIRUVALLUR | TIRUVALLUR | TAMIL NADU | 601204 | ₹1.1 Cr | L1 | Accepted-AOC Below the estimate rate |
| 2 | L2₹1.1 Cr+₹3.4 L (3.21%)Rejected-Finance FLAT NO G 4 ELITE EMPIRE NO 317 VALLUVARKOTTAM HIGH ROAD NUNGAMBAKKAM CHENNAI 600 034 | CHENNAI | TAMIL NADU | 600034 | ₹1.1 Cr+₹3.4 L (3.21%) | L2 | Rejected-Finance Above the Estimate Rate |
| 3 | L3₹1.1 Cr+₹5.2 L (4.83%)Rejected-Finance NO 105 MELAPUDUVAYAL ROAD KEERANUR PUDUKKOTTAI 622 502 | PUDUKKOTTAI | TAMIL NADU | 622502 | ₹1.1 Cr+₹5.2 L (4.83%) | L3 | Rejected-Finance Above the Estimate Rate |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
8 Aug 2023, 3:00 pmClosed
JOINT DIRECTOR/PROJECT DIRECTOR
DRDA, PUDUKKOTTAI
MGSMT 25 Percent -22-23- Pack - 47 -Strengthening and Five years Maintenace of 1 Roads in Viralimalai Block-Pudukkottai District
2023_RDTN_331408_1
Viralimalai-47-/MGSMT 25 Percent -22-23/PDK
Open Tender
Civil Works
Item Rate
180 days
PUDUKKOTTAI
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.1 L
3 Nov 2023
23 Jun 2023
8 Aug 2023
23 Jun 2023
8 Aug 2023
23 Jun 2023
Amount
R- 348 -STRENGTHENING OF PSK ROAD TO SANGAMPATTI ROAD KM 0/0-2/910
Clearing and grubbing Scrub jungle road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Existing BT surface picking including cost and conveyance of all Laboue Charges to site etc., complete.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per 10.00 square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for KM and HM stones
Kilo metre stone
Hecta metre stone
Provision for Name Board Cum Citizen Board
Provision for Cautionary Sign Boards
Provision for Mandatory Sign Boards
Provision for Guard Stone
Provision for Chevron Signs
Road Marking with Hot applied Thermoplastic compound with Reflectorising glass beads on Bituminous surface
Construction of Single Row RCC Pipe Culvert @ Ch 700 m - 1No
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges and all other incidental charges etc., completed.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges and all other incidental charges etc., completed.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete.
Provision for 0.900M pipe NP3
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
SAI HRIDHAM INFRAA PVT LTD
TST AND CO
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .