| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC Party Stands L-1 on overall lowest tender basis |
| 2 | L2₹1.4 Cr+₹6.3 L (4.72%)Rejected-AOC | ₹1.4 Cr+₹6.3 L (4.72%) | L2 | Rejected-AOC Party Stands L-2 on overall lowest tender basis |
| Sl No | Description | Qty | Unit | SAJAN BOREWELLS GUNA L2 | B L MEHRA CONSTRUCTION COMPANY L1 |
|---|---|---|---|---|---|
| 1.00Earth work in excavation in foundations, trenches, pits, areas including dressing of sides and ramming of bottom wherever, required, lift upto 1.5 M, getting out excavated earth, disposal of surplus excavated earth upto a lead of 10 M: | |||||
| 2.00 | a) Soft/loose/hard/dense soil | 1,879.4 | Cum | 111 ₹2,08,613.4 | 106 ₹1,99,216.4 Lowest |
| 3.00 | b) Ordinary rock /Hard rock without blasting | 38.88 | Cum | 130 ₹5,054.4 | 91 ₹3,538.08 Lowest |
| 4.00 | Surface dressing of the ground including removing inequalities not exceeding 15 cm deep and disposal of rubbish anywhere within plant area in soft/loose soil. | 875 | sqm | 5 ₹4,375 | 2 ₹1,750 Lowest |
| 5.00 | Filling available material vis. earth/sand/moorum/farm yard manure/stone aggregate etc., and spreading, levelling the same, watering and consolidation wherever required in pits, trenches, sides of foundations, flower beds/lawns, planted areas etc. as per directions of Engineer-in-Charge | 243.02 | Cum | 90 ₹21,871.8 | 71 ₹17,254.42 Lowest |
| 6.00Transportation of surplus earth, material, store items, garbage, plant construction debries, plants, saplings etc., anywhere in factory area including loading, unloading to work site, dump yard as per the directions of Engineer-in-Charge,excluding spreading and levelling the disposed off materials: | |||||
| 7.00 | a) By truck / tractor trolley / hand cart on the basis of measured work | 557.14 | cum | 90 ₹50,142.6 | 81 ₹45,128.34 Lowest |
| 8.00 | By engaging tractor trolley of size 2.95 x 1.75 x 0.53 mtr including driver and 4 (four) number of labour with tools and fuel for transportation of materials on the basis of per day ( 8 hrs.) working | 477 | Per day | 3,100 ₹14,78,700 | 2,700 ₹12,87,900 Lowest |
| 9.00 | Supplying and stacking at site of following materials :Coarse sand,Fine sand,Moorum,Stone aggregate of approved quality | 4 | Cum | 800 ₹3,200 | 610 ₹2,440 Lowest |
| 10.00Providing and laying cement concrete in foundation, footing, sub bases of pavements, floors, beds excluding cost of centring and shuttering complete : | |||||
Tender Value
₹1.3 Cr
EMD Value
₹1 L
Closing Date
29 May 2026, 11:00 amClosed
CHIEF MANAGER CIVIL
SITE OFFICE NFL VIJAIPUR
Miscellaneous Civil Works in Factory Area
2026_NFL_277068_1
NFVP/CICO/2379
Open Tender
Civil Works
Works
720 days
NFL VIJAIPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1 L
25 Jul 2026
9 May 2026
30 May 2026
9 May 2026
29 May 2026
9 May 2026
9 May 2026 - 29 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundations, trenches, pits, areas including dressing of sides and ramming of bottom wherever, required, lift upto 1.5 M, getting out excavated earth, disposal of surplus excavated earth upto a lead of 10 M: | - | - | - | - |
| 2 | a) Soft/loose/hard/dense soil | 1,879.4 | Cum | - | - |
| 3 | b) Ordinary rock /Hard rock without blasting | 38.88 | Cum | - | - |
| 4 | Surface dressing of the ground including removing inequalities not exceeding 15 cm deep and disposal of rubbish anywhere within plant area in soft/loose soil. | 875 | sqm | - | - |
| 5 | Filling available material vis. earth/sand/moorum/farm yard manure/stone aggregate etc., and spreading, levelling the same, watering and consolidation wherever required in pits, trenches, sides of foundations, flower beds/lawns, planted areas etc. as per directions of Engineer-in-Charge | 243.02 | Cum | - | - |
| 6 | Transportation of surplus earth, material, store items, garbage, plant construction debries, plants, saplings etc., anywhere in factory area including loading, unloading to work site, dump yard as per the directions of Engineer-in-Charge,excluding spreading and levelling the
disposed off materials: | - | - | - | - |
| 7 | a) By truck / tractor trolley / hand cart on the basis of measured work | 557.14 | cum | - | - |
| 8 | By engaging tractor trolley of size 2.95 x 1.75 x 0.53 mtr including driver and 4 (four) number of labour with tools and fuel for transportation of materials on the basis of per day ( 8 hrs.) working | 477 | Per day | - | - |
| 9 | Supplying and stacking at site of following materials :Coarse sand,Fine sand,Moorum,Stone aggregate of approved quality | 4 | Cum | - | - |
| 10 | Providing and laying cement concrete in foundation, footing, sub bases of pavements, floors, beds excluding cost of centring and shuttering complete : | - | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
SSC2379.pdf
Tender Documents • 29.43 MB
BOQ_323593.xls
BOQ • 0.37 MB
Corrigendum2379.pdf
PDF • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .