Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.5 LAccepted-Finance | L1 | Accepted-Finance L1 BIDDER | |
| 2 | L2₹42.8 L+₹2.3 L (5.63%)Rejected-Finance | L2 | Rejected-Finance HIGHER THAN L1 BIDDER | |
| 3 | L3₹42.8 L+₹2.3 L (5.63%)Rejected-Finance | L3 | Rejected-Finance HIGHER THAN L1 BIDDER | |
| 4 | L3₹46.7 L+₹6.3 L (15.5%)Rejected-Finance BORBARUAH BAZAR A T ROAD DIBRUGARH ASSAM | L3 | Rejected-Finance HIGHER THAN L1 BIDDER | |
| 5 | L4₹47.0 L+₹6.6 L (16.2%)Rejected-Finance PO PS BANDERDEVA DIST PAPUM PARE ARUNACHAL PRADESH PIN 791123 | PAPUM PARE | ARUNACHAL PRADESH | 791123 | L4 | Rejected-Finance HIGHER THAN L1 BIDDER |
| Sl No | Description | Qty | Unit | M/S Abhi Traders L3 | M/s Sashi Enterprise L6 | O-DARANG ENTERPRISES L1 | ABOTANI ENTERPRISE L4 | Arun Moni Phukan L8 | M/S P S ENTERPRISES L2 | M/S HIMALAYAN TRIBES MEDISOC L2 | Saranga Saikia L5 | M/S D G ENTERPRISE L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) and disposal of debris and rubbish complete all as specified and directed. | 275 | Sqm | 21 ₹5,775 | 19 ₹5,225 | 25 ₹6,875 | 19 ₹5,225 | 18 ₹4,950 Lowest | 20 ₹5,500 | 20 ₹5,500 | 19 ₹5,225 | 20 ₹5,500 |
| 2.00 | Demolition of un-reinforced cement concrete in ground floors and pavings n.exc 15cm thickness, (Below or above Ground level) and disposal of debris and rubbish to a distance complete all as directed , | 21.66 | Cum | 422 ₹9,140.52 | 391 ₹8,469.06 | 777 ₹16,829.82 | 400 ₹8,664 | 392 ₹8,490.72 | 350 ₹7,581 Lowest | 350 ₹7,581 Lowest | 384 ₹8,317.44 | 408 ₹8,837.28 |
| 3.00 | Demolition/Dismantling of stone slabs /paver Blocks and tiles of any description or thickness laid bedded and pointed in any mortar in floors , aprons etc. and clean the surface to receive screed bed to lay new tiles complete all as specified and directed | 7 | 10sqm | 84 ₹588 | 77 ₹539 | 222 ₹1,554 | 79 ₹553 | 77 ₹539 | 70 ₹490 Lowest | 70 ₹490 Lowest | 76 ₹532 | 81 ₹567 |
| 4.00 | Demolition of brick work or stone masonary built in cement mortor including all quoins & jambs etc. complete all as specified and directed | 14 | Cum | 422 ₹5,908 | 391 ₹5,474 | 888 ₹12,432 | 400 ₹5,600 | 392 ₹5,488 | 400 ₹5,600 | 400 ₹5,600 | 384 ₹5,376 Lowest | 408 ₹5,712 |
| 5.00 | Taking down chowkats or frame, n.exc 1.5 Sqm each with shutters (without taking off shutter from the frame) complete all as specified and directed. | 22 | Each | 105 ₹2,310 | 97 ₹2,134 | 144 ₹3,168 | 99 ₹2,178 | 97 ₹2,134 | 100 ₹2,200 | 100 ₹2,200 | 96 ₹2,112 Lowest | 102 ₹2,244 |
| 6.00 | Taking down chowkats or frames, exc 1.5 but n.exc. 4 Sqm in each with shutter (without taking off shutter from the frame) complete all as specified and directed. | 25 | Each | 105 ₹2,625 | 97 ₹2,425 | 166 ₹4,150 | 99 ₹2,475 | 97 ₹2,425 | 100 ₹2,500 | 100 ₹2,500 | 96 ₹2,400 Lowest | 102 ₹2,550 |
| 7.00 | Taking down cement plaster on brick or stone walls etc including racking out joints, hacking for key, scrubbing down with water and removing rubbish complete all as specified and directed | 360 | Sqm | 42 ₹15,120 | 38 ₹13,680 Lowest | 66 ₹23,760 | 39 ₹14,040 | 38 ₹13,680 Lowest | 40 ₹14,400 | 40 ₹14,400 | 38 ₹13,680 Lowest | 40 ₹14,400 |
| 8.00 | Dismantling of plain or corrugated steel sheeting, any gauge, thickness, in roof covering including ridges and keeping serviceable sheets in safe custody for reuse in the work complete as directed. | 530 | Sqm | 42 ₹22,260 | 38 ₹20,140 | 34 ₹18,020 | 39 ₹20,670 | 38 ₹20,140 | 30 ₹15,900 Lowest | 30 ₹15,900 Lowest | 38 ₹20,140 | 40 ₹21,200 |
| 9.00 | Dismantling of wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. | 30 | Qtl | 738 ₹22,140 | 685 ₹20,550 | 899 ₹26,970 | 701 ₹21,030 | 686 ₹20,580 | 450 ₹13,500 Lowest | 450 ₹13,500 Lowest | 672 ₹20,160 | 714 ₹21,420 |
| 10.00 | Dismantling Wall and ceiling boards (fibre, pulp, insulation, etc.) or insulation boards/slabs/ blankets, any thickness, including cover fillets/ snap grid frame etc complete all as specified and directed. | 180 | Sqm | 42 ₹7,560 | 38 ₹6,840 | 34 ₹6,120 Lowest | 39 ₹7,020 | 38 ₹6,840 | 40 ₹7,200 | 40 ₹7,200 | 38 ₹6,840 | 40 ₹7,200 |
Tender Value
₹43.6 L
EMD Value
₹87,200
Closing Date
26 Sept 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE 872 EWS
GE 872 EWS LIKABALI
SPECIAL REPAIR TO BLDG NO. T-62 OF 5 INF BDE CAMP CSD STORE SPL REPAIR TO BLDG NO. T-22 INT OFFICE SPL REPAIR OF EXISTING BLDG NO. T-235 RATION STORE SPL REPAIR WORK OF EXISTING BLDG NO. T-193,T-194,T-195,T-200,T-61 T-199 TOILET BATHROOM BLO
2026_MES_787797_1
8907
Open Tender
Civil Works
Works
180 days
ALONG
AS PER NIT
7 documents required · 7 mandatory
₹500
GE 872 EWS
₹87,200
10 Nov 2026
3 Sept 2026
28 Sept 2026
3 Sept 2026
26 Sept 2026
17 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) and disposal of debris and rubbish complete all as specified and directed. | 275 | Sqm | - | - |
| 2 | Demolition of un-reinforced cement concrete in ground floors and pavings n.exc 15cm thickness, (Below or above Ground level) and disposal of debris and rubbish to a distance complete all as directed , | 21.66 | Cum | - | - |
| 3 | Demolition/Dismantling of stone slabs /paver Blocks and tiles of any description or thickness laid bedded and pointed in any mortar in floors , aprons etc. and clean the surface to receive screed bed to lay new tiles complete all as specified and directed | 7 | 10sqm | - | - |
| 4 | Demolition of brick work or stone masonary built in cement mortor including all quoins & jambs etc. complete all as specified and directed | 14 | Cum | - | - |
| 5 | Taking down chowkats or frame, n.exc 1.5 Sqm each with shutters (without taking off shutter from the frame) complete all as specified and directed. | 22 | Each | - | - |
| 6 | Taking down chowkats or frames, exc 1.5 but n.exc. 4 Sqm in each with shutter (without taking off shutter from the frame) complete all as specified and directed. | 25 | Each | - | - |
| 7 | Taking down cement plaster on brick or stone walls etc including racking out joints, hacking for key, scrubbing down with water and removing rubbish complete all as specified and directed | 360 | Sqm | - | - |
| 8 | Dismantling of plain or corrugated steel sheeting, any gauge, thickness, in roof covering including ridges and keeping serviceable sheets in safe custody for reuse in the work complete as directed. | 530 | Sqm | - | - |
| 9 | Dismantling of wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. | 30 | Qtl | - | - |
| 10 | Dismantling Wall and ceiling boards (fibre, pulp, insulation, etc.) or insulation boards/slabs/ blankets, any thickness, including cover fillets/ snap grid frame etc complete all as specified and directed. | 180 | Sqm | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
8907TEN.pdf
Tender Documents • 1.78 MB
BOQ_882955.xls
BOQ • 1.28 MB
8907Corri.pdf
PDF • 0.17 MB
REVISEDATE.pdf
PDF • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .