| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | ₹1.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.0 L+₹9,954.52 (5.23%)Admitted-Fee/PreQual/Technical/Finance | ₹2.0 L+₹9,954.52 (5.23%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.1 L+₹14,994.75 (7.88%)Admitted-Fee/PreQual/Technical/Finance | ₹2.1 L+₹14,994.75 (7.88%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹2.1 L+₹15,503.13 (8.15%)Admitted-Fee/PreQual/Technical/Finance | ₹2.1 L+₹15,503.13 (8.15%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹2.1 L+₹21,958.77 (11.5%)Admitted-Fee/PreQual/Technical/Finance | ₹2.1 L+₹21,958.77 (11.5%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Dhandayuthabani L4 | U.Abhishekwaran Contractor L2 | GOKULASREE CONSTRUCTION L3 | STALIN BROTHERS CONTRCTOR L1 | ABDUL HAKEEM L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for Foundation in all soils such as red earth, hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel, hard rock not requiring blasting etc complete., for foundation | 3 | cum | 324.3 ₹972.9 | 100 ₹300 Lowest | 246.52 ₹739.56 | 246.52 ₹739.56 | 150 ₹450 |
| 2.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 1.8 | cum | 4,991.4 ₹8,984.52 | 4,200 ₹7,560 Lowest | 5,159.55 ₹9,287.19 | 5,159.55 ₹9,287.19 | 5,159.55 ₹9,287.19 |
| 3.00 | Plain cement concrete 1:2:4 using 20mm metal including all labour charges etc complete | 1 | cum | 6,392 ₹6,392 | 6,200 ₹6,200 Lowest | 6,548.58 ₹6,548.58 | 6,548.58 ₹6,548.58 | 6,548.58 ₹6,548.58 |
| 4.00 | Brick work in CM 1:5 using country bricks including all labour charges etc., complete | 1.5 | cum | 5,757.5 ₹8,636.25 | 4,500 ₹6,750 Lowest | 6,100.02 ₹9,150.03 | 6,100.02 ₹9,150.03 | 6,100.02 ₹9,150.03 |
| 5.00 | Plastering 1:5 mix using 12mm thick including all labour charges etc., complete | 50 | cum | 277.35 ₹13,867.5 | 270 ₹13,500 | 268.76 ₹13,438 Lowest | 268.76 ₹13,438 Lowest | 268.76 ₹13,438 Lowest |
| 6.00 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including all labour charges etx., complete | 60.17 | cum | 271.71 ₹16,348.79 | 264 ₹15,884.88 | 183.22 ₹11,024.35 | 102.55 ₹6,170.43 Lowest | 200.11 ₹12,040.62 |
| 7.00 | Fabrication supply and erection of steel structure as per the spection dimensions and design and design requirement including all labour charges and other charges etc complete | 250 | kg | 117.74 ₹29,435 | 110 ₹27,500 | 95.55 ₹23,887.5 | 85.55 ₹21,387.5 Lowest | 116.25 ₹29,062.5 |
| 8.00 | Providing Puff sheet panel | 30 | sqm | 2,721.3 ₹81,639 | 2,100 ₹63,000 Lowest | 2,595 ₹77,850 | 2,416.55 ₹72,496.5 | 2,595 ₹77,850 |
| 9.00 | Painting charges of the Roling shutter and purlin and struts by primary coat of Red Oxide and 2 coats of approved Enamel Material + labour charges | 30 | sqm | 268.84 ₹8,065.2 | 120 ₹3,600 Lowest | 146.99 ₹4,409.7 | 146.99 ₹4,409.7 | 146.99 ₹4,409.7 |
| 10.00 | Supplying and fixing colour galvalume sheet roof of 0.47mm thick and steel tubular box section of 100x50x3mm of 1meter interval including priming coat fixing in position with all necessary accessories complete | 20 | sqm | 4.7 ₹94 Lowest | 1,500 ₹30,000 | 1,041.65 ₹20,833 | 1,041.65 ₹20,833 | 1,041.65 ₹20,833 |
Tender Value
Refer Docs
EMD Value
₹2,222
Closing Date
20 Aug 2026, 3:00 pmClosed
The Panchayat President, Vepoor Panchayat
The Panchayat office, Vepoor Panchayat
Consrtruction of Vermi shed at Vepoor H/O Vepoor Panchayat
2026_RDTN_692447_1
A2/751/2025
Open Tender
Civil Works
Works
90 days
The Panchayat office, Vepoor Panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,222
20 Aug 2026
8 Aug 2026
20 Aug 2026
8 Aug 2026
20 Aug 2026
8 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for Foundation in all soils such as red earth, hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel, hard rock not requiring blasting etc complete., for foundation | 3 | cum | - | - |
| 2 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 1.8 | cum | - | - |
| 3 | Plain cement concrete 1:2:4 using 20mm metal including all labour charges etc complete | 1 | cum | - | - |
| 4 | Brick work in CM 1:5 using country bricks including all labour charges etc., complete | 1.5 | cum | - | - |
| 5 | Plastering 1:5 mix using 12mm thick including all labour charges etc., complete | 50 | cum | - | - |
| 6 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including all labour charges etx., complete | 60.17 | cum | - | - |
| 7 | Fabrication supply and erection of steel structure as per the spection dimensions and design and design requirement including all labour charges and other charges etc complete | 250 | kg | - | - |
| 8 | Providing Puff sheet panel | 30 | sqm | - | - |
| 9 | Painting charges of the Roling shutter and purlin and struts by primary coat of Red Oxide and 2 coats of approved Enamel Material + labour charges | 30 | sqm | - | - |
| 10 | Supplying and fixing colour galvalume sheet roof of 0.47mm thick and steel tubular box section of 100x50x3mm of 1meter interval including priming coat fixing in position with all necessary accessories complete | 20 | sqm | - | - |
stage.html
html • 0.02 MB
finance_832573.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_832573.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .