| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAccepted-AOC B 407 C O MR ASHUTOSH JAISWAL ANANT IMAGINE OLD BUS STAND MAIN ROAD KORBA PIN CODE 495677 | KORBA | CHHATTISGARH | 495677 | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹6.8 L+₹25,143.46 (3.83%)Rejected-Finance MIG 105 DR R P NAGAR PHASE 02 KORBA CG 495677 | KORBA | CHHATTISGARH | 495677 | L2 | Rejected-Finance Not L1 Bidder | |
| 3 | L3₹9.4 L+₹2.8 L (42.6%)Rejected-Finance GAYATRI NAGAR RAJGAMAR POST OMPUR KORBA CHHATTISGARH 495683 | KORBA | CHHATTISGARH | 495683 | L3 | Rejected-Finance Not L1 Bidder |
Tender Value
₹11.6 L
EMD Value
₹14,500
Closing Date
2 Apr 2024, 11:00 amClosed
Staff Officer Mining SECL Korba Area
Office of the General Manager Korba Area Post and District Korba Chhattisgarh
Construction of foundation for installation of conveyor belt assembly (Drive head, fix drum, loop take up, motorized winch, tail end drum) and construction of concrete slab for alignment of stool and jamming of stool legs by cement concrete in propos
2024_SECL_305588_1
SECL/KB/GM/SO(M)/eNIT/23-24/28
Open Tender
Civil Works - Others
Item Rate
90 days
Korba
As per NIT
3 documents required · 3 mandatory
₹14,500
2 May 2024
21 Mar 2024
3 Apr 2024
21 Mar 2024
2 Apr 2024
22 Mar 2024
21 Mar 2024 - 26 Mar 2024
Amount
Drilling (Hand Drill) /blasting in floor in stone and removal of excavated materials manually upto 30m lead in UG. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management.
Loading of material (Cement) into tub on surface within a lead of 50m.
Loading of material (Sand) into tub on surface within a lead of 50m.
Loading of material (stone aggregate below 40mm nominal size) into tub on surface within a lead of 50m.
Unloading of material (Cement) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate)
Unloading of material (Sand) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate)
Unloading of material (stone aggregate below 40mm nominal size) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size).
Total impact of GST for the purpose of CTC
Shree Balajee Construction
M/S Raghubir Chandra
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .