Loading…
Loading…
Tender Value
₹50.4 L
EMD Value
₹1.0 L
Closing Date
15 Jul 2026, 1:00 pm
Similar tender results from the same govt authority in the past 3 years.
SE, NBEC, PWD
Office of the SE, NBEC, PWD, Venus more, Siliguri
Construction of Cancer Care Centres at North Bengal Medical College and Hospital under North Bengal Construction Division Electrical Work SITC of UPS
2026_WBPWD_5015720_1
WBPWD/SENBEC/eNIT-01(2ND CALL)/2026-27
Open Tender
ELECTRICAL WORKS ORG
60 days
Siliguri
Please refer Tender documents.
8 documents required · 8 mandatory
₹1.0 L
Siliguri
19 Jun 2026
19 Jun 2026
17 Jul 2026
19 Jun 2026
15 Jul 2026
1 Jul 2026
29 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supplying, installation, Testing & Commissioning of following capacity at full load (Unity Power Factor) at operating temperature 0º C to 40ºC, Relative humidity 0 to 95%, Online double conversion true sine wave Uninterrupted hot swapable (allow for the replacement or addition of battery modules without shutting down the entire system) modular Power Supply (UPS) system with N+1 modules (N denotes total number of modules required for rated capacity). The UPS shall include a Rectifier, inverter, battery bank suitable for 30 minutes back up (Battery VAH capacity shall not be less than 1600 VAH per KVA of UPS rating per Hour backup time) on full load (Battery shall be VRLA, SMF in ABS Container) and Static Bypass switch along with provision for manual bypass, suitable isolation transformer for additional protection against neutral faults etc. UPS shall have inbuilt phase sequence correction. | |||||
| 1.01 | The UPS systems offered are to be of the latest technology with Digital Control Microprocessor based for reliable operation using Insulated Gate Bipolar Transistor (IGBT)'s both for the rectifier & inverter (3 Level) with PWM (Pulse Width Modulation). The quality of design, manufacturing and inspection process should confirm to the relevant Inter-national standards such as IEC/EN/VDE. The operating efficiency of the UPS systems shall be >96% while operating on battery mode and delivering quality power to the 100% non-linear loads. Current total harmonic effect(ITHD) on the input grid shall be < 5% at 50 %load. | - | - | - | - |
| 1.02 | The required LC inductor (L) and a capacitor (C) filters shall be included in UPS cost, extreme power factor kit to be included to limit the input power factor (PF) to 0.99 and output power factor shall be unity (i.e. kw rating of the UPS shall be kva rating x 1 ), however UPS shall be suitable to take load at 0.7 laging to 0.7 leading power factor loads. UPS shall be suitable for incoming supply AC : 3Phase 400V +/-20%, 50 Hz +/-5 Hz, AC Output voltage: 3Phase 415 Volt, 50 Hz +/- 0.2Hz, Overload capacity of 120% for 10 mins, Sine wave output. Non condensing, noise level less than 60db at 1 meter distance, protections: Input Under voltage over voltage, abnormal out voltage, battery over charging, output over current, short circuit protection, battery deep discharge protection, 10KV surge. | - | - | - | - |
| 1.03 | UPS must comply with low voltage electromagnetic compatibility (EMC) achieved as per EN 6204, EN6204 Part I and Part 2, it shall be a Voltage and Frequency Independent (VFI)-type UPS. Communication RS232/ RS485/SNMP port open protocol for BMS integration, all hardware & software for iOT Communication as per approved by Engineering in charge. Required battery racks and interconnecting copper conductor cables of suitable size and connectors and all required accessories are inclusive of the cost). This system must provide a means for logging and alarming of all monitored points plus email notification. | - | - | - | - |
| 1.04 | Forced air-cooling with integral inbuilt fans with redundancy (if one fan fail UPS should be able to handle at least 80% of the load, Noise Level 65 DB at 1 meter distance. The system shall be in compliance IEC 62040- 1,2 & 3, IS: 16242 and display Panel (minimum) (In-build 5 inch or more LC Display / LED) to display : a) Input: Voltage, current, Frequency. b) Bypass: Voltage, Frequency. c) Output: Voltage, frequency, Current. d) Battery: Voltage, Capacity. e) Load: KVA, KW, Percentage. f) Temperature: STS, Inverter, PFC. g) Event Logging & Statistical Data (On LCD/LED): UPS should capture and display up to 3000 events like: Over temperature / DC Bus Fail / Fan Fail / Fuse Fail / Overload / Short-circuit / Device Fail / Inverter Fail / Rectifier Fail / Bypass Fail, etc. | - | - | - | - |
| 1.05 | h) Statistical Data: No. of power failures / Transfers to Bypass / Total Running time, etc. i) Mains Mode of Operation /Battery Mode of Operation / Bypass feeding the load / UPS Fault /Battery charging and discharging, overload, battery voltage and battery capacity. j) Audible Alarms : Mains Failure, Battery Low Alarm, UPS Overload, Fault, Shutdown, Input Over, Under Voltage, Output Over, Under Voltage, Battery Over, Under Voltage, Over Load and short circuit, Over Temperature. The UPS should have QR code which should contain drawing, test report OEM manual, Geo- Tag of manufacturing location etc. (Make- APC by Schneider Electric/Microtek/ Numeric/Luminous/Power One/Switching AVO) | - | - | - | - |
| 1.06 | 30KVA (Each Power module shall be < 10 KVA) | 2 | Nos. | 6,34,994 | ₹12,69,988 |
| 1.07 | 20KVA (Each Power module shall be < 10 KVA) | 2 | Nos. | 4,80,750 | ₹9,61,500 |
| 1.08 | 10KVA (Each Power module shall be < 10 KVA) | 1 | Nos. | 2,85,750 | ₹2,85,750 |
| 2Supplying, installation, Testing & Commissioning of following capacity at full load (Unity Power Factor) ON LINE Uninterrupted Power Supply (UPS) system suitable for Single Phase input, Single Phase output AC Supply. The UPS shall include a Rectifier, inverter, battery bank suitable for 30 minutes back up (Battery VAH capacity shall not be less than 1600 VAH per KVA of UPS rating per Hour backup time) on full load (Battery shall be VRLA,SMF in ABS Container) and Static Bypass switch along with provision for manual bypass, suitable isolation transformer for additional protection against neutral faults etc. The UPS systems shall be Microprocessor based Digital Control, using Insulated Gate Bipolar Transistor (IGBT)'s both for the rectifier & inverter with PWM (Pulse Width Modulation) Technology. The quality of design, manufacturing and inspection process should confirm to the relevant Inter-national standards such as IEC/EN/VDE. | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
Tendernotice_2.pdf
PDF • 1.30 MB
BOQ_5084666.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid