| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 2₹2.4 L+₹10,240 (4.20%)Accepted-AOC | 2 | Accepted-AOC 1ST LOWEST BIDDER | |
| 2 | 1₹2.4 LRejected-AOC | 1 | Rejected-AOC HIGEST | |
| 3 | 3₹3.6 L+₹1.2 L (49.3%)Rejected-AOC | 3 | Rejected-AOC HIGEST | |
| 4 | Rejected-Technical | - | Rejected-Technical DEFICIT DOCUMENTS |
Tender Value
₹2.7 L
EMD Value
₹5,400
Closing Date
2 Feb 2023, 4:00 pmClosed
OFFICE OF THE EXECUTIVE ENGINEEER EDIV KHANYAR
OFFICE OF THE EXECUTIVE ENGINEEER EDIV KHANYAR
Augmentation from 100 KVA substation to 200 KVA at Different location of ED IV Khanyar
2023_PDD_203418_1
EDIV/ 41 OF 2023
Open Tender
Electrical and Maintenance Works
Turn-key
14 days
HAZRATBAL KHANYAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹200
OFFICE OF THE EXECUTIVE ENGINEEER EDIV KHANYAR
₹5,400
Yes
4 Mar 2023
25 Jan 2023
3 Feb 2023
25 Jan 2023
2 Feb 2023
25 Jan 2023
25 Jan 2023 - 25 Jan 2023
Supply, installation, testing and commissioning of:
Loading at stores, carriage up to site , unloading at site and installation, testing and commissioning of 200 KVA 11/0.433kV, 3-phase, Distribution Transformers (tansformer to be provide by KPDCL to be lifted from Divisional Stores Khanyar)
Supply , fixing of LT Fuse set
Supply , fixing testing and commissioning of 240 mm² Cable, 1.1kV Grade, PVC Insulated Stranded Conductor FRLS type
Providing and fixing of Sundry items like aluminium lugs, Jumpers, binding Tape,
Isolation ,Dismentelling of existing 100 KVA Distribution transformer and carriage from site to Divisional stores Khanyar
M/S FAIRDEAL TRADERS
M/S KHAN ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .