| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹96,740Admitted-Finance | +6.12% | ₹96,740 | L1 | Admitted-Finance |
| 2 | L2₹98,431.31Admitted-Finance | +8.29% | ₹98,431.31 | L2 | Admitted-Finance |
| 3 | L3₹99,148.37Admitted-Finance | +9.21% | ₹99,148.37 | L3 | Admitted-Finance |
| 4 | L4₹99,927.78Admitted-Finance | +10.21% | ₹99,927.78 | L4 | Admitted-Finance |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
8 Jun 2026, 6:00 pmClosed
Executive Engineer
Executive Engineer PWD Dn Sujangarh
Annual Rate Contract For VVIP/VIP Visit in Dn Sujangarh (Helipad and Other Works) (Rate Contract)
2026_CEPWD_565743_5
E NIT NO 03/2026-27 Sujangarh
Open Tender
Civil Works
270 days
SJNGH
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Executive Engineer PWD Dn/MDRISL
₹1 L
Yes
10 Jun 2026
8 Jun 2026
9 Jun 2026
8 Jun 2026
8 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | PART - A | - | - | - | - | BI01010001010000000000000515BI0100001112 |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201.By Manual Means.In area of thorny jungle | - | P.hect | 34,162 | - | BI01010001010000000000000515BI0100001113 |
| 3 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201.By Mechanica Means.In area of thorny jungle | - | P.hect | 12,746 | - | BI01010001010000000000000515BI0100001114 |
| 4 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRTH specifications Clause 3002 Manual Means | - | P.Cum | 142 | - | BI01010001010000000000000515BI0100001115 |
| 5 | Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per MoRTH specification Clause 3003 | - | P.Sqm | 18 | - | BI01010001010000000000000515BI0100001116 |
| 6 | Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and MoRTH Specification Clause 3003 | - | P.Sqm | 7 | - | BI01010001010000000000000515BI0100001117 |
| 7 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. | - | P.Bag | 7.9 | - | BI01010001010000000000000515BI0100001118 |
| 8 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumen and suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all
transportation, stacking & taxes etc | - | P.Kg | 11.89 | - | BI01010001010000000000000515BI0100001118 |
| 9 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all
taxes etc. | - | P.Kg | 2.46 | - | BI01010001010000000000000515BI0100001118 |
| 10 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density,
complete as per MoRTH Specification Clause 401.For Churu.For Grading III Material | - | P.Cum | 639 | - | BI01010001010000000000000515BI0100001118 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
Tendernotice_2.pdf
PDF • 0.33 MB
Tendernotice_3.pdf
PDF • 0.13 MB
BOQ_1006696.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid