Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹1.9 L
EMD Value
₹2,000
Closing Date
29 Jul 2020, 12:00 pmClosed
SUPREINTENDING ENGINEER
ELECTRICITY DISTRIBUTION CIRCLE, MEERUT
SHIFTING OF 33 KV LINE IN VILLAGE PANCHLI KHURD UNDER DEPOSIT SCHEME IN THE AREA OF SDO-EDSD-II-PARTAPUR UNDER EDD-I MEERUT
2020_PVVNL_492152_1
21/2020-21/EDC/MT
Open Tender
Electrical Works
Lump-sum
90 days
WORKS
SHIFTING OF 33 KV LINE IN VILLAGE PANCHLI KHURD UNDER DEPOSIT SCHEME IN THE AREA OF SDO-EDSD-II-PARTAPUR UNDER EDD-I MEERUT
3 documents required · 3 mandatory
₹590
SUPREINTENDING ENGINEER
₹2,000
Yes
30 Jul 2020
11 Jul 2020
29 Jul 2020
11 Jul 2020
29 Jul 2020
11 Jul 2020
Amount
Cartage of following material from store center Meerut to JE Store including loading & unloading at both ends maximum distance up to 40 Km. :-
ST Pole 11 Mtr. Long.
Line material such as disc, channel, angel, x-arms, stay set, stay wire, XLPE Cable 3x300 sq.mm, 33 KV Conductor etc.
Cartage of following material from JE, Store to site of work including loading & unloading at both ends maximum distance up to 40 Km. :-
ST Pole 11 Mtr. Long.
Line material such as disc, channel, angel, x-arms, stay set, stay wire, XLPE Cable 3x300 sq.mm, 33 KV Conductor etc.
Erection of STP Pole 11 mtr long after digging a pit of size 1.20 x 0.60 x 1.6 mtr in all type of Soil including back filling of the pole with proper ramming after completion of work.
Erection of Double pole on STP pole 11 mtr after digging a pitt of size 1.20 x 0.60 x 1.6 mtr in all type of Soil for each pole including back filling of the pole with proper ramming after completion of work.
Laying lifting stringing of proper sagging of ACSR dog conductor for 3 phase, 3 wire 11 KV line including binding & jumpering properly.
Digging of Cable Trunch
Laying of 33 KV Cable in trunch & back filling of soil, sand & bricks
Filling of Cable Jointing Kit
Removing of Old lines
Removing of STP poles 11 mtr. Long
Back cartage of line material
Back Cartage of STP pole 11 mtr. Long
Providing and fixing Holding clamps.
Providing and fixing Bolt and Nuts.
Providing and Fixing of Stay set Complete
Providing and fixing of Stay Clamps
Providing of GI Pipe 6" dia
Fixing of Earthing Rod
Anubhavi Constructions
Shyam Constructions
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .